Abitibi Metals Announces 62% Increase in Resources at B26 to 11.3 Mt Indicated at 2.13% CuEq and 7.2 Mt Inferred at 2.21% CuEq

          Highlights: Indicated resources increased by 62% to 11.3 Mt from 6.9 Mt: Indicated resources now grade 1.23% copper, 1.27% zinc, 0.46 g/t gold (“Au”) and 31.9 g/t silver or 2.13% copper equivalent Indicated resources contain …
... READ MORE
November 14, 2024

Abitibi Metals Drills 9.75 Metres at 3.97% CuEq at the B26 Deposit

          Highlights: The Company has received the final results from the Phase 1 drill program highlighted by the following intervals: #318 – 0.75% CuEq over 57.75 metres beginning at 81 metres depth, including 2.33% CuEq over 11.3 …
... READ MORE
June 20, 2024

Abitibi Metals Drills 57.2 Metres at 1.78% CuEq in Extensional Drilling at The B26 Deposit, including 13.1 Metres at 3.1% CuEq

          Highlights: The Company has received results from drillholes 1274-24-314, 315, 320 and 323, highlighted by the following intervals: #320 – 1.78% CuEq over 57.2 metres beginning at 235.80 metres depth, including 3.1% CuEq over 13.05 metres. #323 – 1.89% CuEq over …
... READ MORE
May 24, 2024

Abitibi Metals Drills 13.15 Metres At 4.82% CuEq in Eastern Drilling At The B26 Deposit

          Highlights: The Company has received results from drillholes 1274-24-312-313, and 331-332 highlighted by the following intervals: #312 – 1.31% CuEq over 23.55 metres beginning at 114.15 metres depth, including 5.4% CuEq over 2.75 metres. #313 – …
... READ MORE
May 16, 2024

Abitibi Metals Drills 44.5 Metres At 2.82% CuEq in Central Drilling At The B26 Polymetallic Deposit

          Highlights: The Company has received results from drillholes 1274-24-301-305 and 339-341 highlighted by the following intervals: #339 – 2.82% CuEq over 44.5 metres beginning at 146 metres depth #340 – 3.35 % CuEq over 20.75 metres …
... READ MORE
May 2, 2024

Abitibi Metals Drills 19.75 Metres At 1.35% CuEq In Western Extension With 500 Metre Step-out At The B26 Polymetallic Deposit

          Highlights: The Company has received results from drillholes 1274-24-333 to 337, highlighted by the following intervals: #335 – 0.93% CuEq over 26.9 metres beginning at 44.5 metres depth #336 – 1.35% CuEq over 19.75 metres beginning at 216.2 metres depth The …
... READ MORE
April 29, 2024

ABITIBI METALS DRILLS 10.6 METRES AT 11.4% CU EQ WITHIN 34 METRES AT 4.1% CU EQ NEAR SURFACE AT THE B26 DEPOSIT*

        First Two Drill Holes in Ongoing 30K Metre Campaign Among Highest-Grade in Project History, Support Open Pit Potential at B26 Polymetallic Deposit, Quebec   Highlights: Drillhole 1274-24-293 intersected 4.0% CuEq over 22.7 metres, including 6.3% CuEq over 10.6 metres beginning …
... READ MORE
February 29, 2024


Copyright 2026 The Prospector News