The Prospector News

Lion One to Build Hybrid Solar Power Plant for the Tuvatu Gold Project in Fiji

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lion One to Build Hybrid Solar Power Plant for the Tuvatu Gold Project in Fiji

 

 

 

 

 

Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) (ASX: LLO) is pleased to announce a partnership with Swiss-based clean energy provider the meeco Group to build and install a hybrid solar / diesel power plant for the Company’s 100% owned and fully permitted Tuvatu Gold Project, located on the island of Viti Levu in the Fiji Islands. Lion One will be a 50% shareholder of a Special Project Vehicle through an agreed buy-in structure.

 

Lion One will use meeco’s 7 MW peak “sun2live” solar power generation system coupled with diesel generators to generate up to 11 MW peak power production providing a continuous 24-hour source of power for the Tuvatu gold mine and processing plant. The installation will be built on 4.1 hectares of unused land 3.5 km from the Tuvatu Gold project and 17 km from the Nadi International Airport.

 

The new eco-friendly solar power system will have an estimated annual energy production of approximately 10.31GWh displacing more than 6,000 tonnes of CO2 emissions per year.

 

“We are excited to partner with meeco to build a clean solar energy solution for powering the Tuvatu Gold Project”, said Lion One Managing Director Stephen Mann. “meeco has a solid track record of installing and operating solar hybrid power plants world-wide. This hybrid system will not only reduce our carbon footprint, but will enable Lion One to meet our power capacity requirements while significantly reducing fuel consumption and operating costs for the Tuvatu Gold Project.”

 

About Lion One

 

Lion One Metals Limited is a Canadian exploration and development company focused on advancing its 100% owned and fully permitted Tuvatu Gold Project towards production. Lion One envisions a low-cost high grade underground gold mining operation with district-scale exploration upside, located near the Nadi International Airport on the island of Viti Levu in the South Pacific island nation of Fiji.

 

Posted February 4, 2019

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting from Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

May 14, 2024

MAG Silver Reports First Quarter Financial Results

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Com... READ MORE

May 14, 2024

Troilus Announces Feasibility Study Results for the Gold-Copper Troilus Project: Outlines a Large Scale, 22-Year Open Pit Project in Tier-One Jurisdiction With USD$884.5 Million NPV(5%)

Troilus Gold Corp. (TSX: TLG) (OTCQX: CHXMF) reports results from... READ MORE

May 14, 2024

Alamos Gold Intersects Higher-Grade Mineralization within a New Zone Near Existing Infrastructure at Young-Davidson

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) reported new results from i... READ MORE

May 14, 2024

Titan Reports First Quarter 2024 Results; National Safety Recognition Award

Titan Mining Corporation (TSX: TI) announces the results for the... READ MORE

May 14, 2024

Copyright 2024 The Prospector News