The Prospector News

MAG Silver Reports First Quarter Financial Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

MAG Silver Reports First Quarter Financial Results

 

 

 

 

 

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Company’s unaudited consolidated financial results for the three months ended March 31, 2024. For details of the unaudited condensed interim consolidated financial statements of the Company for the three months ended March 31, 2024 and management’s discussion and analysis for the three months ended March 31, 2024, please see the Company’s filings on the System for Electronic Document Analysis and Retrieval Plus (“SEDAR+”) at (www.sedarplus.ca) or on the Electronic Data Gathering, Analysis, and Retrieval (“EDGAR”) at (www.sec.gov).

 

All amounts herein are reported in $000s of United States dollars (“US$”) unless otherwise specified (C$ refers to Canadian dollars).

 

KEY HIGHLIGHTS (on a 100% basis unless otherwise noted)

 

  • MAG reported net income of $14,895 ($0.14 per share) driven by income from Juanicipio (equity accounted) of $19,244, and adjusted EBITDA1 of $32,447 for the three months ended March 31, 2024.
  • A total of 325,683 tonnes of ore at a silver head grade of 476 grams per tonne (equivalent silver head grade2 713 g/t), was processed at Juanicipio during Q1 2024.
  • Juanicipio achieved silver production and equivalent silver production2 of 4.5 and 6.4 million ounces, respectively, during Q1 2024.
  • Juanicipio delivered robust cost performance with cash cost1 of $2.50 per silver ounce sold ($8.66 per equivalent silver ounce sold3), and all-in sustaining cost1 of $6.11 per silver ounce sold ($11.22 per equivalent silver ounce sold3) in Q1 2024.
  • Juanicipio generated strong operating cash flow of $42,521 and free cash flow1 of $27,820 in the first quarter of 2024 after tax payments of $25,772.
  • Juanicipio returned a total of $17,459 in interest and loan principal repayments to MAG during Q1 2024.
  • MAG published its updated technical report on Juanicipio on March 27, 2024 outlining robust economics with an after tax NPV of $1.2 billion over an initial 13-year life of mine, generating annual average free cashflow exceeding $130 million. Mineral Resources increased by 33% from the 2017 PEA, with substantial growth in Measured and Indicated categories. Inferred resources also expanded, highlighting significant near-term, high-grade upside potential. An inaugural 15.4 million tonnes Mineral Reserve Estimate at 628 g/t silver equivalent grade was declared enhancing economic confidence. Extensive exploration upside remains, with only 5% of the property explored, indicating high potential for further discoveries.
  • MAG announced 2024 production and cost guidance with Juanicipio expected to produce between 14.3 million and 15.8 million silver ounces yielding between 13.2 million and 14.6 million payable silver ounces at all-in sustaining costs of between $9.50 and $10.50 per silver ounce sold. Juanicipio remains on track to achieve 2024 guidance.
  • On March 22, 2024 the Company, through its Gatling Exploration Inc. subsidiary, acquired 100% ownership of the Goldstake property (contiguous to its current land holdings) from Goldstake Explorations Inc. and Transpacific Resources Inc., for consideration of C$5,000.

 

________________________
1 Adjusted EBITDA, total cash costs, cash cost per ounce, all-in sustaining costs, all-in sustaining cost per ounce and free cash flow are non-IFRS measures, please see below ‘Non-IFRS Measures’ section and section 12 of the Q1 2024 MD&A for a detailed reconciliation of these measures to the Q1 2024 Financial Statements.
2 Equivalent silver head grade and equivalent silver production have been calculated using the following price assumptions to translate gold, lead and zinc to “equivalent” silver head grade and “equivalent” silver production: $23/oz silver, $1,950/oz gold, $0.95/lb lead and $1.15/lb zinc.
3 Equivalent silver ounces sold have been calculated using realized price assumptions to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Q1 2024 realized prices of $23.73/oz silver, $2,112.27/oz gold, $0.92/lb lead and $1.08/lb zinc.

CORPORATE

  • The Company is well underway with the preparation of its 2023 sustainability report underscoring its continued commitment to transparency with its stakeholders while providing a comprehensive overview of the Company’s environmental, social and governance commitments, practices and performance for 2023. A copy of MAG’s 2022 sustainability report and MAG Silver 2022 ESG Data Table are available on the Company’s website at https://magsilver.com/esg/reports/4.

 

________________________
4
Information contained in or otherwise accessible through the Company’s website, including the 2022 sustainability report and MAG Silver 2022 ESG Data Table, do not form part of this News Release and are not incorporated into this News Release by reference.

EXPLORATION

 

  • Juanicipio:
    • Infill drilling at Juanicipio continued in Q1 2024 from underground aimed at upgrading mineralization in areas expected to be mined in the near to mid-term. During Q1 2024, 11,271 metres were drilled from underground.
    • Surface drilling focused on expanding and upgrading the deeper zones and broader regional exploration started in April 2024.
    • During 2024, Juanicipio plans to drill a total of 50,000 metres, with 33,000 metres from underground and 17,000 metres from surface.
  • Deer Trail Project, Utah:
    • On May 29, 2023 MAG started a Phase 3 drilling program focused on up to three porphyry “hub” target areas thought to be the source of the manto, skarn, epithermal mineralization and extensive alteration throughout the project area including that at the Deer Trail and Carissa zones. In late 2023 an early onset of winter snowfall impacted the commencement of the third porphyry “hub” target, which is now expected to be drilled in 2024. The two completed “hub” holes to date total 2,738 metres. Both holes intercepted alteration and mineralization in line with what is expected on the edges of porphyry systems. Follow-up drill targets are planned for summer 2024.
    • With the early onset of snowfall, Phase 4 drilling focussed on lower elevations commenced in the last quarter of 2023 and continued through Q1 2024, aimed at offsetting the Carissa discovery and testing other high-potential targets in the Deer Trail mine area. During Q1 2024, 1,208 metres were drilled at Carissa with results pending.
  • Larder Project, Ontario:
    • Drilling targeting Cheminis and Bear totalled 5,391 metres in Q1 2024. Targets tested include down plunge extension of the high-grade double knuckle at the Bear East zone and extending the Cheminis south mine sequence down plunge.
    • Cheminis Update: Follow-up drilling of the Cheminis South Cadillac-Larder Break mine sequence down plunge is planned to test below the most recent intercepts. Hole GAT-24-026 intersected a new zone on the north side of the CLB within a fuchsite-silica-albite altered komatiite grading 3.9 g/t gold over 16 metres with 2 higher grade shoots associated with albite dykes (see Table 1 below).
    • Bear Update: Utilizing the updated model and incorporating the updated data from recent drilling, the Bear East zone was successfully extended down plunge by up to 1,100 metres depth. Hole GAT-24-024NB intersected gold mineralization on both sides of the CLB which confirms the presence of either another structural trap at depth or the continuation of the “double knuckle” zone at surface. Gold mineralization intersected on the north zone included 9.4 g/t gold over 2.2 metres within a strongly altered komatiite with syenite intrusions and 1.6 g/t gold over 4.2 metres on the south zone within the south iron-rich volcanics (see Table 1 below). Bear East remains open in all directions.

 

Table 1: 2024 Larder Drillholes Highlights

 

Hole ID From
(m)
To
(m)
Length
(m)1
Gold
(g/t)
Lithology Target/Zone
GAT-24-024NB 1233.7 1244.0 10.3 2.3 Komatiites with Syenite Intrusions North Bear Zone
Including 1234.1 1236.3 2.2 9.4 Syenite North Bear Zone
             
and 1415.5 1419.7 4.2 1.6 South Volcanics South Bear Zone
             
GAT-24-026 1127.0 1143.0 16.0 3.9 Green Komatiites with Albite dykes North Cheminis Zone
             
Including 1134.3 1135.5 1.2 9.1 Green Komatiite with Albite dykes North Cheminis Zone
Including 1137.4 1139.0 1.6 8.1 Green Komatiite with Albite dykes North Cheminis Zone

 

 

JUANICIPIO RESULTS

 

All results of Juanicipio in this section are on a 100% basis, unless otherwise noted.

 

Operating Performance

 

The following table and subsequent discussion provide a summary of the operating performance of Juanicipio for the three months ended March 31, 2024 and 2023, unless otherwise noted.

 

  Three months ended
  March 31,   March 31,  
Key mine performance data of Juanicipio (100% basis) 2024   2023  
     
Metres developed (m) 4,069   3,450  
     
Material mined (t) 325,081   223,632  
Material processed (t) 325,683   222,023  
     
Silver head grade (g/t) 476   363  
Gold head grade (g/t) 1.33   1.07  
Lead head grade (%) 1.35 % 0.74 %
Zinc head grade (%) 2.50 % 1.45 %
     
Equivalent silver head grade (g/t) (1) 713   530  
     
Silver payable ounces (koz) 3,995   2,001  
Gold payable ounces (koz) 8.90   5.29  
Lead payable pounds (klb) 7,747   2,825  
Zinc payable pounds (klb) 11,846   3,650  
     
Equivalent silver payable ounces (koz) (2) 5,627   2,796  
     

(1)   Equivalent silver head grades have been calculated using the following price assumptions to translate gold, lead and zinc to “equivalent” silver head grade: $23/oz silver, $1,950/oz gold, $0.95/lb lead and $1.15/lb zinc (Q1 2023: $21.85/oz silver, $1,775/oz gold, $0.915/lb lead and $1.30/lb zinc).
(2)   Equivalent silver payable ounces have been calculated using realized price assumptions to translate gold, lead and zinc to “equivalent” silver payable ounces (metal quantity, multiplied by metal price, divided by silver price). Q1 2024 realized prices of $23.73/oz silver, $2,112.27/oz gold, $0.92/lb lead and $1.08/lb zinc (Q1 2023 realized prices of $22.93/oz silver, $1,959.50/oz gold, $0.94/lb lead and $1.43/lb zinc).

 

During the three months ended March 31, 2024 a total of 325,081 tonnes of ore were mined. This represents an increase of 45% over Q1 2023. Increases in mined tonnages at Juanicipio have been driven by the operational ramp up of the mine towards steady state targets.

 

During the three months ended March 31, 2024 a total of 325,683 tonnes of ore were processed through the Juanicipio plant; no ore was processed at the nearby Fresnillo and Saucito processing plants (100% owned by Fresnillo). This represents an increase of 47% over Q1 2023. The increase in milled tonnage has been driven by the Juanicipio mill commissioning and operational ramp up to nameplate capacity over the course of 2023.

 

The silver head grade and equivalent silver head grade for the ore processed in the three months ended March 31, 2024 was 476 g/t and 713 g/t, respectively (three months ended March 31, 2023: 363 g/t and 530 g/t, respectively). Head grades in Q1 2023 were lower as low-grade commissioning stockpiles were processed through the Juanicipio plant. Silver metallurgical recovery during Q1 2024 was 89.1% (Q1 2023: 87.0%) reflecting ongoing optimizations in the processing plant.

 

The following table provides a summary of the total cash costs5 and all-in sustaining costs5 of Juanicipio for the three months ended March 31, 2024, and 2023.

 

  Three months ended
  March 31,   March 31,  
Key mine performance data of Juanicipio (100% basis) 2024   2023  
     
Total cash costs (5) 9,973   22,439  
Cash cost per silver ounce sold ($/oz) (5) 2.50   11.21  
Cash cost per equivalent silver ounce sold ($/oz) (5) 8.66   14.55  
     
All-in sustaining costs (5) 24,393   32,902  
All-in sustaining cost per silver ounce sold ($/oz) (5) 6.11   16.44  
All-in sustaining cost per equivalent silver ounce sold ($/oz) (5) 11.22   18.29  
     

________________________
5 Total cash costs, cash cost per ounce, cash cost per equivalent ounce, all-in sustaining costs, all-in sustaining cost per ounce, and all-in sustaining cost per equivalent ounce are non-IFRS measures, please see the “Non-IFRS Measures” section below and section 12 of the Q1 2024 MD&A for a detailed reconciliation of these measures to the Q1 2024 Financial Statements. Equivalent silver ounces sold have been calculated using realized price assumptions to translate gold, lead and zinc to “equivalent” silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Q1 2024 realized prices of $23.73/oz silver, $2,112.27/oz gold, $0.92/lb lead and $1.08/lb zinc (Q1 2023: $22.93/oz silver, $1,959.50/oz gold, $0.94/lb lead and $1.43/lb zinc).

Financial Results

 

The following table presents excerpts of the financial results of Juanicipio for the three months ended March 31, 2024 and 2023.

 

  Three months ended
  March 31,   March 31,  
  2024   2023  
  $   $  
Sales 123,689   51,482  
Cost of sales:    
Production cost (36,787 ) (27,378 )
Depreciation and amortization (22,038 ) (7,955 )
Gross profit 64,864   16,149  
Consulting and administrative expenses (4,189 ) (1,499 )
Extraordinary mining and other duties (1,392 ) (520 )
Interest expense (3,979 ) (3,816 )
Exchange losses and other (1,297 ) (2,864 )
Net income before tax 54,007   7,451  
Income tax expense (14,249 ) 6,731  
Net income (100% basis) 39,758   14,182  
MAG’s 44% portion of net income 17,494   6,240  
Interest on Juanicipio loans – MAG’s 44% 1,751   1,679  
MAG’s 44% equity income 19,244   7,919  

 

Sales increased by $72,207 during the three months ended March 31, 2024, mainly due to 179% higher metal volumes and 2% higher realized metal prices.

 

Offsetting higher sales was higher production cost ($9,409) which was driven by higher sales and operational ramp-up in mining and processing, including $3,545 in inventory movements, and higher depreciation ($14,083) as the Juanicipio mill achieved commercial production and commenced depreciating the processing facility and associated equipment in June 2023. Operating margin increased by 21% to 52%, mainly due to operational leverage and the lower reliance on the nearby Fresnillo and Saucito processing facilities.

 

Other expenses increased by $2,159 mainly as a result of higher extraordinary mining and other duties ($872) in relation to higher precious metal revenues from the sale of concentrates and higher consulting and administrative expenses ($2,690) as an operator services agreement became effective upon initiation of commercial production (the “Operator Services Agreement”), offset by lower exchange losses and other costs ($1,566).

 

Taxes increased by $20,980 impacted by higher taxable profits generated during Q1 2024, and non-cash deferred tax credits related to the commencement of use of plant and equipment in Q1 2023.

 

Ore Processed at Juanicipio Plant (100% basis)

 

Three Months Ended March 31, 2024 (325,683 tonnes processed) Three Months Ended
March 31, 2023
Amount

$
 
Payable Metals Quantity Average Price
$
  Amount
$
 
Silver 3,994,614 ounces   23.73 per oz         94,810   45,875  
Gold 8,904 ounces   2,112 per oz   18,807          10,367  
Lead 3,514 tonnes   0.92 per lb.   7,100   2,661  
Zinc 5,373 tonnes   1.08 per lb.   12,836      5,208  
Treatment, refining, and other processing costs (2) (9,864 ) (12,629 )
Sales 123,689   51,482  
Production cost (36,787 ) (27,378 )
Depreciation and amortization (1) (22,038 ) (7,955 )
Gross Profit          64,864   16,149  

(1) The underground mine was considered readied for its intended use on January 1, 2022, whereas the Juanicipio processing facility started commissioning and ramp-up activities in January 2023, achieving commercial production status on June 1, 2023.
(2) Includes toll milling costs from processing mineralized material at the Saucito and Fresnillo plants for Q1 2023.

 

Sales and treatment charges are recorded on a provisional basis and are adjusted based on final assay and pricing adjustments in accordance with the offtake contracts.

 

 

MAG FINANCIAL RESULTS – THREE MONTHS ENDED MARCH 31, 2024

 

As at March 31, 2024, MAG had working capital of $72,833 (December 31, 2023: $67,262) including cash of $74,683 (December 31, 2023: $68,707) and no long-term debt. As well, as at March 31, 2024, Juanicipio had working capital of $107,088 including cash of $30,991 (MAG’s attributable share is 44%).

 

The Company’s net income for the three months ended March 31, 2024 amounted to $14,895 (March 31, 2023: $4,713) or $0.14/share (March 31, 2023: $0.05/share). MAG recorded its 44% income from equity accounted investment in Juanicipio of $19,244 (March 31, 2023: $7,919) which included MAG’s 44% share of net income from operations as well as loan interest earned on loans advanced to Juanicipio (see above for MAG’s share of income from its equity accounted investment in Juanicipio).

 

 

  For the three months ended  
  March 31,
2024
  March 31,
2023
 
  $   $  
     
Income from equity accounted investment in Juanicipio 19,244   7,919  
General and administrative expenses (4,109 ) (3,272 )
General exploration and business development (357 ) (102 )
Operating income 14,778   4,545  
     
Interest income 827   564  
Other income 537   127  
Foreign exchange loss (163 ) (180 )
Income before income tax 15,979   5,056  
     
Deferred income tax expense (1,084 ) (343 )
         
Net income 14,895   4,713  

 

NON-IFRS MEASURES

 

The following table provides a reconciliation of cash cost per silver ounce of Juanicipio to production cost of Juanicipio on a 100% basis (the nearest IFRS measure) as presented in the notes to the Q1 2024 Financial Statements.

 

 

  Three months ended March 31,
(in thousands of US$, except per ounce amounts) 2024   2023  
Production cost as reported 36,787   27,378  
Depreciation on inventory movements 673   149  
Adjusted production cost 37,460   27,527  
Treatment, refining, and other processing costs 9,864   12,629  
By-product revenues (2) (38,743 ) (18,236 )
Extraordinary mining and other duties 1,392   520  
Total cash costs (1) 9,973   22,439  
Silver ounces sold 3,994,614   2,000,974  
Equivalent silver ounces sold (3) 5,626,959   2,796,391  
Cash cost per silver ounce sold ($/ounce) 2.50   11.21  
Cash cost per equivalent silver ounce sold ($/ounce) 8.66   14.55  

(1)  As Q3 2023 represented the first full quarter of commercial production, information presented for total cash costs together with their associated per unit values are not directly comparable.
(2)   By-product revenues relates to the sale of other metals namely gold, lead, and zinc.
(3)   Equivalent silver payable ounces have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver payable ounces (metal quantity, multiplied by metal price, divided by silver price). Q1 2024 realized prices: $23.73/oz silver, $2,112.27/oz gold, $0.92/lb lead and $1.08/lb zinc (Q1 2023: $22.93/oz silver, $1,959.50/oz gold, $0.94/lb lead and $1.43/lb zinc).

 

The following table provides a reconciliation of AISC of Juanicipio to production cost and various operating expenses of Juanicipio on a 100% basis (the nearest IFRS measure), as presented in the notes to the Q1 2024 Financial Statements.

 

  Three months ended March 31,
(in thousands of US$, except per ounce amounts) 2024   2023  
Total cash costs 9,973   22,439  
General and administrative expenses 4,189   1,499  
Exploration 1,368   2,133  
Sustaining capital expenditures 8,598   6,598  
Sustaining lease payments 208   179  
Interest on lease liabilities (16 ) (6 )
Accretion on closure and reclamation costs 72   59  
All-in sustaining costs (1) 24,393   32,902  
Silver ounces sold 3,994,614   2,000,974  
Equivalent silver ounces sold (2) 5,626,959   2,796,391  
All-in sustaining cost per silver ounce sold ($/ounce) 6.11   16.44  
All-in sustaining cost per equivalent silver ounce sold ($/ounce) 11.22   18.29  
Average realized price per silver ounce sold ($/ounce) 23.73   22.93  
All-in sustaining margin ($/ounce) 17.63   6.48  
All-in sustaining margin ($/equivalent ounce) 12.51   4.64  
All-in sustaining margin 70,417   12,973  

(1)  As Q3 2023 represented the first full quarter of commercial production, information presented for all-in sustaining costs and all-in sustaining margin together with their associated per unit values are not directly comparable.
(2)   Equivalent silver payable ounces have been calculated using realized prices to translate gold, lead and zinc to “equivalent” silver payable ounces (metal quantity, multiplied by metal price, divided by silver price). Q1 2024 realized prices: $23.73/oz silver, $2,112.27/oz gold, $0.92/lb lead and $1.08/lb zinc, (Q1 2023 realized prices: $22.93/oz silver, $1,959.50/oz gold, $0.94/lb lead and $1.43/lb zinc).

 

For the three months ended March 31, 2024 the Company incurred corporate G&A expenses of $3,964 (three months ended March 31, 2023: $3,262), which exclude depreciation expense.

 

The Company’s attributable silver ounces sold and equivalent silver ounces sold for the three months ended March 31, 2024 were 1,757,630 and 2,475,862 respectively (three months ended March 31, 2023: 880,429 and 1,230,412 respectively), resulting in additional all‐in sustaining cost for the Company of $2.26/oz and $1.60/oz respectively (three months ended March 31, 2023: $3.71/oz and $2.65/oz respectively), in addition to Juanicipio’s all-in-sustaining costs presented in the above table.

 

The following table provides a reconciliation of EBITDA and Adjusted EBITDA attributable to the Company based on its economic interest in Juanicipio to net income (the nearest IFRS measure) of the Company per the Q1 2024 Financial Statements. All adjustments are shown net of estimated income tax.

 

 

  Three months ended March 31,
(in thousands of US$) 2024   2023  
Net income after tax 14,895   4,713  
Add back (deduct):    
Taxes 1,084   343  
Depreciation and depletion 145   10  
Finance costs (income and expenses) (1,201 ) (511 )
EBITDA (1) 14,923   4,555  
Add back (deduct):    
Adjustment for non-cash share-based compensation 966   763  
Share of net earnings related to Juanicipio (19,244 ) (7,919 )
MAG attributable interest in Junicipio Adjusted EBITDA 35,802   9,718  
Adjusted EBITDA (1) 32,447   7,117  

 

(1)   As Q3 2023 represents the first full quarter of commercial production, information presented for EBITDA and Adjusted EBITDA is not directly comparable.

 

The following table provides a reconciliation of free cash flow of Juanicipio to its cash flow from operating activities on a 100% basis (the nearest IFRS measure), as presented in the notes to the Q1 2024 Financial Statements.

 

  Three months ended March 31,
(in thousands of US$) 2024   2023  
Cash flow from operating activities 42,521   (29,910 )
Less:    
Cash flow used in investing activities (14,492 ) (19,004 )
Sustaining lease payments (208 ) (179 )
Juanicipio free cash flow (1) 27,820   (49,093 )

(1)   As Q3 2023 represents the first full quarter of commercial production, comparative information presented for free cash flow of Juanicipio is not directly comparable.

 

Qualified Persons: All scientific or technical information in this press release including assay results referred to, and mineral resource estimates, if applicable, is based upon information prepared by or under the supervision of, or has been approved by Gary Methven, P.Eng., Vice President, Technical Services and Lyle Hansen, P.Geo, Geotechnical Director; both are “Qualified Persons” for purposes of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

 

About MAG Silver Corp.

 

MAG Silver Corp. is a growth-oriented Canadian exploration company focused on advancing high-grade, district scale precious metals projects in the Americas. MAG is emerging as a top-tier primary silver mining company through its (44%) joint venture interest in the 4,000 tonnes per day Juanicipio Mine, operated by Fresnillo plc (56%). The mine is located in the Fresnillo Silver Trend in Mexico, the world’s premier silver mining camp, where in addition to underground mine production and processing of high-grade mineralised material, an expanded exploration program is in place targeting multiple highly prospective targets. MAG is also executing multi-phase exploration programs at the 100% earn-in Deer Trail Project in Utah and the 100% owned Larder Project, located in the historically prolific Abitibi region of Canada.

 

Posted May 14, 2024

Share this news article

MORE or "UNCATEGORIZED"


Ascot Announces Closing of C$34 Million Bought Deal Financing

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to anno... READ MORE

July 25, 2024

RUA GOLD Closes C$8 Million Brokered Offering and Announces Commencement of Trading on the TSX Venture Exchange

Highlights Closing the fully subscribed brokered offering for C$8... READ MORE

July 25, 2024

Mosaic Acquires 100% of the Amanda Project

Mosaic Minerals Corporation (CSE: MOC) announces that it has sign... READ MORE

July 25, 2024

First Phosphate Confirms Significant High-Quality Igneous Phosphate Deposit at Its Bégin-Lamarche Project in the Saguenay-Lac-St-Jean Region, Quebec au Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is ple... READ MORE

July 25, 2024

PROSPECT RIDGE ANNOUNCES FINAL CLOSING OF ITS OVERSUBSCRIBED PRIVATE PLACEMENT

Prospect Ridge Resources Corp.  (CSE: PRR) (OTC: PRRSF) (FRA: OE... READ MORE

July 25, 2024

Copyright 2024 The Prospector News