Step Out Drilling At Yerington Pit Extends Mineralization; Drill Hole YM-047A Intercepts 864 Ft of 0.23 % TCu Lion Copper and Gold Corp. (TSX-V: LEO) (OTCQB: LCGMF) released assay results from its 2024 exploration drilling …
Step Out Drilling At Yerington Pit Extends Mineralization; Drill Hole YM-047A Intercepts 864 Ft of 0.23 % TCu Lion Copper and Gold Corp. (TSX-V: LEO) (OTCQB: LCGMF) released assay results from its 2024 exploration drilling …
GMIN to acquire the CentroGold Project in Brazil’s prospective Gurupi Gold Belt from BHP CentroGold contains 1.7 million ounces of indicated and 0.6 million ounces of inferred JORC-compliant gold resource that is open for expansion in all …
Vizsla Copper Corp. (TSX-V: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) is pleased to report analytical results from drill holes completed at the Southeast deposit during the summer core drilling program on the Woodjam project in central …
Dolly Varden Silver Corporation (TSX-V: DV) (OTCQX: DOLLF) (FSE: DVQ1) is pleased to announce results from the Wolf Vein high-grade silver plunge expansion directional drilling. Drill hole DV24-416, averaged 654 g/t Ag, 0.47% Pb and 0.57% Zn …
Fuerte Metals Corporation (TSX-V: FMT) is pleased to report results from the most recent five holes of a diamond drilling program at its wholly-owned Cristina precious metals project in southwestern Chihuahua State, Mexico. Fuerte has …
Thunder Gold Corp (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) (formerly White Metal Resources Corp) is pleased to announce it has closed the second and final tranche of the non-brokered private placement previously announced on August 14, …
Gold mineralized system expanded in multiple directions at the Vanha prospect Gold intersects include 29.10 g/t Au over 3.10 m, 3.35 g/t Au over 9.85 m, 2.77 g/t Au over 9.00 m, 3.92 g/t Au over 5.65 m, 1.00 …
All amounts are in USD unless stated otherwise After-tax NPV5% of $1.4 billion, IRR of 21% and payback of 3.8 years at $1,950/oz base case gold price (long-term consensus) After-tax NPV5% of $2.5 billion, IRR of 31% and payback of …
HIGHLIGHTS 35m @ 3.3 g/t gold equivalent (Au Eq.) and 17m @ 2.4 g/t Au Eq. in OEDD-89 52m @ 2.0 g/t Au Eq. in OEDD-90 32m @ 2.1 g/t Au Eq. in OEDD-92 BBM’s …
This intersection includes 4.3 g/t gold over 32 metres, including 30.3 g/t gold over 1 metre * Other results returned 0.7 g/t gold over 301 metres from surface with multiple higher grade sub intervals …