The Prospector News

51% IRR from PEA at TriStar Gold’s Castelo de Sonhos Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

51% IRR from PEA at TriStar Gold’s Castelo de Sonhos Project

 

 

 

 

 

On behalf of TriStar Gold Inc. (TSX-V: TSG), GE21 Consultoria Mineral Ltda of Belo Horizonte, Brazil, has completed the Preliminary Economic Assessment for the Company’s Castelo de Sonhos gold project in southern Pará State, Brazil.

 

Key highlights of the PEA include the following:

 

  • Life-of-mine recoverable gold of 1.1 million ounces (“Moz”)
  • Internal rate of return pre-tax of 51%
  • Cash cost of $660
  • All in sustaining cost (“AISC”) of $687

 

Nick Appleyard, TriStar’s President and CEO stated: “This study now shows a robust, low cost base case for the Castelo de Sonhos gold project.  With payback in less than two years and an average production of nearly 160,000 ounces per year for the first four years, the remarkable potential of this project is coming into focus. We intend to complete further drilling in 2019 with an aim to further increase the mineral resource estimate”.

 

Table 1. Key economic parameters from the PEA for the Castelo de Sonhos gold project. 1

 

 

Parameter Unit Pre-tax Post-tax
Cash flow US$ millions 441 372
IRR % 51 43
NPV 5% US$ millions 319 264
NPV 10% US$ millions 233 188
Cash Cost US$/oz 660  
AISC2 US$/oz 687  
Initial Capital US$ millions 184  
Life of mine production Moz gold 1.1  
Average annual production oz gold 120,000  
Payback period (Mine life) Years 1.9 (of 9.1 years)  

 

Numbers have been rounded to reflect the precision of a preliminary analysis.

The Company calculates all-in sustaining costs as the sum of total cash costs, sustaining capital expense and corporate general and administrative expense (net of stock option expense).

TriStar intends to file an independent NI 43-101 Technical report to SEDAR within 45 days in support of this disclosure.

 

 

Table 2. Technical assumptions for the PEA

 

 

Parameter Unit value
Process rate t/day 8,250
Average head grade g/t 1.44
Gold Recovery % 95
Mine operating cost US$/t moved 2.17
Process operating cost and G&A US$/t processed 10.68
LOM strip ratio Waste t : process t 8 : 1
Gold price US$/oz 1,250
Exchange rate Brazilian Real/US$ 3.8

 

The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the economic results described in the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

Preliminary Economic Assessment

 

The PEA for Castelo de Sonhos has assumed the use of a contract mining company, to conduct open pit mining using technology equipment readily available in Brazil and elsewhere in the World.  The open-pit mine is designed assuming 55⁰ slope angle, 8m bench height and a 10% access ramp.

 

The material for processing will be crushed and then ground to 150 microns before being leached using Carbon-in-pulp (“CIP”). Process tailings will be discharged to an engineered facility designed to international standards of safety.

 

The economic analysis includes allowances for milestone payments due under the original purchase agreement, as well as mine closure and remediation.                                                 

 

Mineral resource

 

The PEA is based on the previously announced mineral resource as shown below:

 

Mineral Resources (above a 0.3 g/t cut-off) of:

 

Indicated: 17.7 million tonnes at 1.2 g/t, containing 0.7 Moz of gold
Inferred: 39.8 million tonnes at 1.0 g/t, containing 1.3 Moz of gold

 

Details available in the September 17th 2018 press release entitled “35% INCREASE IN RESOURCES AT CASTELO DE SONHOS AS PRELIMINARY ECONOMIC ASSESSMENT BEGINS”

 

Qualified Person and QAQC

 

Porfirio Cabaleiro Rodriguez (MAIG #3708), Director of GE21, is the Qualified Person, as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, for the Preliminary Economic Assessment presented in this press release, is independent of the Company and has approved the technical disclosure in this press release.

 

About TriStar:

 

TriStar Gold is an exploration and development company focused on precious metals properties in the Americas that have potential to become significant producing mines. The Company’s current flagship property is Castelo de Sonhos in Pará State, Brazil.

 

Posted November 16, 2018

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting from Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

May 14, 2024

MAG Silver Reports First Quarter Financial Results

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Com... READ MORE

May 14, 2024

Troilus Announces Feasibility Study Results for the Gold-Copper Troilus Project: Outlines a Large Scale, 22-Year Open Pit Project in Tier-One Jurisdiction With USD$884.5 Million NPV(5%)

Troilus Gold Corp. (TSX: TLG) (OTCQX: CHXMF) reports results from... READ MORE

May 14, 2024

Alamos Gold Intersects Higher-Grade Mineralization within a New Zone Near Existing Infrastructure at Young-Davidson

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) reported new results from i... READ MORE

May 14, 2024

Titan Reports First Quarter 2024 Results; National Safety Recognition Award

Titan Mining Corporation (TSX: TI) announces the results for the... READ MORE

May 14, 2024

Copyright 2024 The Prospector News