The Prospector News

TomaGold Continues to Intersect Wide Zones of Zinc, Gold and Silver on Optioned Chibougamau Independent Claims

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

TomaGold Continues to Intersect Wide Zones of Zinc, Gold and Silver on Optioned Chibougamau Independent Claims


Chibougamau Independent Mines Inc.
(TSX-V: CBG) (Germany: CLL1) (OTCMKTS: CMAUF), herein called Chibougamau, is pleased to report to shareholders that TomaGold Corporation (TSX-V: LOT) (OTCPK: TOGOF) have reported the results from the final three, Phase 2 drill-hole extensions at the Berrigan Mine Project in the western portion of the Chibougamau Mining Camp. These 3 drill holes extensions are the final of a 5-hole program which has succeeded in “highlighting a thick extensive polymetallic hydrothermal system”, extending the Berrigan Deep Zone for a strike length of 250 m and 400 m vertically with intersections to a vertical depth of nearly 900 m.

Highlights from the drilling include:
Hole TOM-25-012EXT: 69.40 m grading 3.46% ZnEq (0.81 g/t Au Eq) from 784.20 m to 853.6 m including 40.1 m grading 5.38% ZnEq (1.25 g/t AuEq)from 784.0 m to 824.3 m
Hole TOM-25-010EXT: 19.1 m grading 2.23% ZnEq (0.52 g/t AuEq) from 472.4 m to 491.5 m
Hole TOM-25-013EXT: 7.0 m grading 2.21% ZnEq (0.52 g/t AuEq), including 28.25 g/t Agfrom 631.5 m to 638.5 m.
Previous intersections in the Berrigan Deep Zone include the following:
Hole TOM-25-015:   98.50 m at 5.08% ZnEq (1.19 g/t AuEq) from 451.20 m to 549.70 m,
including 4.90 m at 23.20% ZnEq (5.44 g/t AuEq) from 452.20 m to 457.10 m.
Hole TOM-25-011EXT: 204.25 m at 2.05% ZnEq (0.48 g/t AuEq) from 553.90 m to 758.15 m,
including 2.40 m at 31.31% ZnEq (7.38 g/t AuEq) from 554.40 m to 556.80 m.

Note: for details on equivalent grades see Table 1 below.


Figure 1: Long Section of the Berrigan Main and Deep Zones Facing North

 

 

Figure 2: Cross Section of the Berrigan Main and Deep Zones Facing West

 

 

Table 1. Summary of Best Intersections Reported by Hole for Phases 1 and 2

 

Notes:

  • The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles.
  • ZnEq and AuEq are calculated using the Company’s standard parameters.
  • AuEq calculation was based on US$4,150/oz Au, $51.34/oz Ag, US$5.023/lb Cu and $1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023), applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.
  • ZnEq calculation was based on US$4,047/oz Au, $50.22/oz Ag, US$4.796/lb Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.

Shareholders are invited to access the TomaGold press release which includes much more detail including individual assays, assay methodology, etc. by clicking here.

This press release was written by Jack Stoch, P. Geo., President and CEO of Chibougamau Independent Mines Inc. in his capacity as a Qualified Person (Q.P.) under NI 43-101.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

 

For further information, contact:
Jack Stoch, P.Geo., Acc.Dir.
President & CEO
Chibougamau Independent Mines Inc.
86, 14th Street
Rouyn-Noranda, Quebec Canada J9X 2J1
Tel.: 819.797.5242
Fax: 819.797.1470
info@chibougamaumines.com
www.chibougamaumines.com
Posted September 30, 2026

Share this news article

MORE or "UNCATEGORIZED"


Viridian Intersects 15m of 1.1% CuEq in 1.5km Step-Out Drilling at Kraken Main

New assays support higher grades and substantially greater minera... READ MORE

October 23, 2026

Antimony Resources Corp. Announces Closing of Financing

Antimony Resources Corp. (CSE: ATMY) (OTCQB: ATMYF) (FSE: K8J0) i... READ MORE

October 23, 2026

Adyton Expands Kabang Gold-Copper Corridor to 2.2 km and Reports Strengthening Copper Mineralization at Depth at Feni Project

Adyton Resources Corporation (TSX-V: ADY) (OTCQB: ADYRF) (FSE: 70... READ MORE

October 23, 2026

Scottie Resources Announces Closing of Second and Final Tranche of Non-Brokered Private Placement

Scottie Resources Corp. (TSX-V: SCOT) (OTCQB: SCTSF) (FSE: SR80)... READ MORE

October 23, 2026

Silver Pony Announces Closing of Up-Sized $1,300,035 Strategic Flow-Through Offering

Silver Pony Resources Corp. (CSE: PONY) (FSE: BJ40) (OTCID: PONIF... READ MORE

October 23, 2026

Copyright 2026 The Prospector News