Q2 Metals Drills Best Hole to Date Intersecting 403.7 Metres at 1.57% Li₂O and 213.8 Metres at 1.93% Li₂O in Hole 93 at the Cisco Lithium Project

          Highlights: CS26-093: three (3) separate intervals, including: 60.8 m at 1.24% Li2O, 213.8 m at 1.93% Li2O, and 403.7 m at 1.57% Li2O. Drilling completed during the 2026 Summer Drill Program and 2026 Fall Drill …
... READ MORE
August 25, 2026


Copyright 2026 The Prospector News