The Prospector News

Marathon Gold and Miawpukek First Nation Hold Formal Signing Ceremony for Socio-Economic Agreement

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Marathon Gold and Miawpukek First Nation Hold Formal Signing Ceremony for Socio-Economic Agreement

 

 

 

 

 

Marathon Gold Corporation (TSX: MOZ) is pleased to announce that the Socio-Economic Agreement between Marathon and Miawpukek First Nation, which was concluded on May 8, 2023, was the subject of a formal signing ceremony held in Conne River, Newfoundland and Labrador, on August 7, 2023. The Agreement was signed by Matt Manson, Marathon’s President & CEO, and Miawpukek Chief Mi’sel Joe during a community meeting and reception hosted by Miawpukek.

 

The SEA respects Miawpukek’s historic and cultural connections to the lands and waters while establishing a framework for a long-term positive working relationship between Marathon and Miawpukek. The Agreement addresses matters such as access to employment and contracting opportunities by Miawpukek members and businesses, education and training, environmental stewardship and monitoring, cultural investment, and ongoing engagement. Implementation of the SEA has commenced and both parties are committed to working collaboratively together over the life of the Valentine Gold Project.

 

Matt Manson, President and CEO of Marathon, and Chief Mi’sel Joe of the Miawpukek First Nation, sign a Socio-Economic Agreement for the Valentine Gold Project

 

About Marathon

 

Marathon is a Toronto based gold company advancing its 100%-owned Valentine Gold Project located in the central region of Newfoundland and Labrador, one of the top mining jurisdictions in the world. The Project comprises a series of five mineralized deposits along a 32-kilometre system. A December 2022 Updated Feasibility Study outlined an open pit mining and conventional milling operation producing 195,000 ounces of gold a year for 12 years within a 14.3-year mine life. The Project was released from federal and provincial environmental assessment in 2022 and construction commenced in October 2022. The Project has estimated Proven Mineral Reserves of 1.43 Moz (23.36 Mt at 1.89 g/t) and Probable Mineral Reserves of 1.27 Moz (28.22 Mt at 1.40 g/t). Total Measured Mineral Resources (inclusive of the Mineral Reserves) comprise 2.06 Moz (29.23 Mt at 2.19 g/t) with Indicated Mineral Resources (inclusive of the Mineral Reserves) of 1.90 Moz (35.40 Mt at 1.67 g/t). Additional Inferred Mineral Resources are 1.10 Moz (20.75 Mt at 1.65 g/t Au). Please see the NI 43-101 Technical Report “Valentine Gold Project, NI 43-101 Technical Report and Feasibility Study” effective November 30, 2022, Marathon’s Annual Information Form for the year ended December 31, 2021 and other filings made with Canadian securities regulatory authorities available at www.sedar.com for further details and assumptions relating to the Valentine Gold Project.

 

Posted August 9, 2023

Share this news article

MORE or "UNCATEGORIZED"


Heliostar Presents Q2 2026 Financial and Operating Results with Record Gold Production and Cash Balance

Q2 2026 Highlights: Produced a record 14,803 gold ounces and 79,7... READ MORE

August 7, 2026

Galiano Gold Reports Second Quarter 2026 Results

Maintains Full-Year 2026 Guidance and Advances Key Growth Priorit... READ MORE

August 7, 2026

Lundin Gold Reports Second Quarter 2026 Results

Strong Quarterly Earnings and Continued Significant Shareholder R... READ MORE

August 7, 2026

Perpetua Resources Reports New High-Grade Gold and Antimony Discoveries and a New Gold-Tungsten Zone at Stibnite

First exploratory drilling in nearly a decade at Perpetua’s... READ MORE

August 7, 2026

Torex Gold Reports Q2 2026 Results

Strong free cash flow and 46% AISC margin support continued capit... READ MORE

August 7, 2026

Copyright 2026 The Prospector News