The Prospector News

Lumina Gold Announces Cangrejos Drill Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lumina Gold Announces Cangrejos Drill Results

 

 

 

 

 

Lumina Gold Corp. (TSX-V:LUM) (OTC:LUMAF) is pleased to announce additional drill results from the Cangrejos infill, step-out and depth extension program. These five holes (C18-71 to C18-75) represent 2,086 metres of drilling from February to April, 2018. During that time, Lumina also drilled an additional 262 metres to support further metallurgical test work for the Preliminary Economic Assessment that is in progress. The Company is continuing to drill at the property with one drill rig and is currently on hole number C18-80.

 

 

Holes C18-71, C18-72 and C18-74 have confirmed the north-northeast extension of the Cangrejos deposit and define a sub-vertical, well mineralized body; high-grade values appear from surface (C18-71, 0-288 m @ 0.75 g/t Au and 0.14% Cu) and to a maximum depth of 550 meter down-hole depth in C18-74. Mineralization in the north-northeast extension remains open to the north-northeast and at depth.

 

 

Hole C18-73 intersected several intensely mineralized zones from the surface to a down-hole depth of 586 meters within the central portion of the deposit (hole ended in mineralization).

 

 

Hole C18-75 was collared on the south side of the deposit and successfully tested surface mineralization in the southern extension (0 to 168m @ 0.64 g/t Au and 0.15% Cu). 

 

 

The 2018 drill holes to date have confirmed the geological interpretations obtained in previous drilling programs as porphyry-style gold-copper mineralization. These results, in conjunction with previous drilling programs, suggest high-grade mineralized zones remain open to the north, south, west and at depth.

 

 

Summary Drill Results

 

 

Hole Number From
(m)
To
(m)
Interval
(m)
Au Grade
(g/t)
Cu Grade
(%)
Azimuth
(°)
Dip
(°)
Type
C18-71 0 288 288 0.75 0.14 330 -60 Step-out
including 134 214 80 1.26 0.21      
                 
C18-72 0 134 134 0.90 0.25 330 -60 Step-out
and 226 250 24 0.47 0.11      
and 270 294 24 0.44 0.12      
                 
C18-73 0 88 88 0.30 0.08 150 -62 Infill
and 134 204 70 0.73 0.05      
and 234 268 34 1.33 0.14      
and 280 586 306 0.64 0.11      
                 
C18-74 184 226 42 0.39 0.01 330 -59 Infill
and 238 326 88 0.66 0.05      
and 392 550 158 0.79 0.18      
                 
C18-75 0 168 168 0.64 0.15 150 -50 Step-out

 

Note: Intervals in the reported holes are calculated using a cut-off of 0.2 g/t Au with maximum internal dilution of 10 continuous metres and the highest gold value used in the reported weighted averages is 7.94 g/t Au. Above cut-off intervals of less than 12m are not reported, and in addition to the above results there were multiple intercepts of lower-grade material in the drill holes.

 

 

Quality Assurance

 

 

All Lumina sample assay results have been independently monitored through a quality control / quality assurance program including the insertion of blind standards, blanks and pulp and reject duplicate samples. Logging and sampling are completed at Lumina’s secure facility located at the Cangrejos project. Drill core is sawn in half on site and half drill-core samples are securely transported to ALS’s sample preparation facility in Quito, Ecuador. Sample pulps are sent to Lima, Peru for analysis. Gold content is determined by fire assay of a 30 gram charge with total copper content determined by four-acid digestion with ICP finish.

 

 

Qualified Persons

 

 

Leo Hathaway, P.Geo, Senior Vice President of Lumina and the Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects for the Cangrejos project has reviewed, verified and approved the contents of this news release.

 

 

About Lumina Gold

 

 

Lumina Gold Corp. is a Vancouver, Canada based precious and base metals exploration and development company focused on gold and copper projects in Ecuador. The Company’s Cangrejos Gold-Copper project is located in El Oro Province, southwest Ecuador, and its Condor Gold-Copper project is located in Zamora-Chinchipe Province, southeast Ecuador. The Company also holds a large and highly prospective land package in Ecuador consisting of 135 thousand hectares. The Company has an experienced management team with a successful track record of advancing and monetizing exploration projects.

 

Posted May 23, 2018

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News