The Prospector News

Lahontan Gold expands Santa Fe Mine drilling program following BLM approval of new drill sites

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lahontan Gold expands Santa Fe Mine drilling program following BLM approval of new drill sites

 

 

 

 

Lahontan Gold Corp CEO Kimberly Ann joined Steve Darling from Proactive to announce a significant milestone in the advancement of the company’s flagship Santa Fe Mine project in Nevada. The company has received formal approval from the United States Bureau of Land Management (BLM) for an amendment allowing additional drill sites on unpatented lode mining claims situated on BLM-administered federal lands.

 

This regulatory green light marks a pivotal step forward for Lahontan, enabling the initiation of expanded exploration activities targeting the high-potential Slab and York areas within the Santa Fe property. These newly approved drill holes are designed to test for substantial extensions to known gold and silver mineralization, building upon the company’s previous successful intercepts.

 

Kimberly Ann confirmed that the upcoming drilling will form a core part of Phase One of Lahontan’s 2025 exploration program. The campaign will focus on step-out drilling from earlier high-grade zones discovered north of the Slab resource and throughout the York target area, with the aim of expanding the project’s overall resource footprint.

 

Lahontan has already completed several preliminary drill holes on the property, and the collected samples have been submitted for geochemical analysis. The company anticipates receiving the first batch of assay results in the coming weeks, which could provide valuable insights into the potential scale and continuity of mineralization at Santa Fe.

 

As Lahontan continues to progress its exploration efforts, this latest approval further reinforces the company’s commitment to unlocking the full value of the Santa Fe Mine, one of Nevada’s promising past-producing gold and silver assets.

 

Courtesy of Proactive Investors

 

Posted June 12, 2025

Share this news article

MORE or "UNCATEGORIZED"


Tectonic Metals Drills 2.41 g/t Au Over 59.44 Metres, Including 11.82 g/t Au Over 10.67 Metres and 39.96 g/t Au Over 3.05 Metres at Alpha Bowl, Flat Gold Project, Alaska

Broad Gold Mineralization Starts at Surface, Returning 1.86 g/t A... READ MORE

October 15, 2026

Lithium Africa Intersects 8.0 m at 1.70% Li2O, including 4.0 m at 2.59% Li2O, Extending High-Grade Mineralization at Norrabees I

Lithium Africa Corp. (TSX-V: LAF) (FSE: 6MQ) (OTCQB: LTAFF) is pl... READ MORE

October 15, 2026

Tower Intersects 20.3 m of 3.13 g/t Au, Including 8.0 m of 7.16 g/t Au, at Rabbit North's Blue Sky Zone

Drilling also returns 134.0 m of 0.65 g/t Au in the Lower Domain;... READ MORE

October 15, 2026

Copper Road Signs Exploration Agreement with the Matachewan First Nation on the Ben Nevis Volcanic Complex Project

Copper Road Resources Inc. (TSX-V: CRD) is pleased to announce th... READ MORE

October 15, 2026

Brunswick Exploration Announces 302 Metre-Wide Spodumene-Bearing Pegmatite Interval at the Anatacau Main Project

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFUR... READ MORE

October 15, 2026

Copyright 2026 The Prospector News