Imperial Metals Corporation (TSX:III) reports financial results for the three months ended March 31, 2023, as summarized in this news release and discussed in detail in the Management’s Discussion & Analysis. The Company’s financial results are prepared in accordance with International Financial Reporting Standards. The reporting currency of the Company is the Canadian (“CDN”) Dollar.

 

QUARTER HIGHLIGHTS

 

FINANCIAL

 

Total revenue was $92.7 million in the March 2023 quarter compared to $33.1 million in the 2022 comparative quarter.

 

In the March 2023 quarter, the Red Chris mine (100% basis) had 2.4 concentrate shipments (2022-3.0 concentrate shipments). Mount Polley mine had 1.4 concentrate shipments (2022-nil concentrate shipments).

 

Variations in revenue are impacted by the re-start of the Mount Polley mine operations, timing and quantity of concentrate shipments, metal prices and exchange rates, and period end revaluations of revenue attributed to concentrate shipments where copper and gold prices will settle at a future date.

 

The London Metals Exchange cash settlement copper price per pound averaged US$4.05 in the March 2023 quarter compared to US$4.53 in the 2022 comparative quarter. The LBMA (London Bullion Market Association) cash settlement gold price per troy ounce averaged US$1,888 in the March 2023 quarter compared to US$1,874 in the 2022 comparative quarter. The average US/CDN Dollar exchange rate was 1.352 in the March 2023 quarter, 6.8% higher than the exchange rate of 1.266 in the March 2022 quarter. In CDN Dollar terms the average copper price in the March 2023 quarter was CDN$5.48 per pound compared to CDN$5.73 per pound in the 2022 comparative quarter, and the average gold price in the March 2023 quarter was CDN$2,553 per ounce compared to CDN$2,373 per ounce in the 2022 comparative quarter.

 

A positive revenue revaluation in the March 2023 quarter was $5.9 million as compared to a $1.2 million of positive revenue revaluation in the 2022 comparative quarter. Revenue revaluations are the result of the metal price on the settlement date and/or the current period balance sheet date being higher or lower than when the revenue was initially recorded or the metal price at the last balance sheet date and finalization of contained metal as a result of final assays.

 

Net loss for the March 2023 quarter was $7.3 million ($0.05 per share) compared to net loss of $6.9 million ($0.05 per share) in the 2022 comparative quarter. The increase in net loss of $0.4 million was primarily due to the following factors:

  • Mine operations went from an income of $2.0 million in March 2022 to a loss of $1.6 million in March 2023, increasing net loss by $3.6 million.
  • Mount Polley restart costs went from $22.4 million in March 2022 to $nil in March 2023, decreasing net loss by $22.4 million.
  • Gain on disposal of mineral properties went from $16.2 million in March 2022 to $nil in March 2023, increasing net loss by $16.2 million.
  • Interest expense went from $0.8 million in March 2022 to $6.0 million in March 2023, increasing net loss by $5.2 million.
  • Tax recovery went from $1.5 million in March 2022 to $4.4 million in March 2023, decreasing net loss by $2.9 million.

 

Capital expenditures including leases were $24.3 million in the March 2023 quarter, a decrease of $7.4 million from $31.7 million in the 2022 comparative quarter. The March 2023 quarter expenditures included $8.5 million in exploration, $3.5 million for tailings dam construction, $4.2 million on stripping costs, and $8.1 million of other capital.

 

At March 31, 2023, the Company had not hedged any copper, gold or US/CDN Dollar exchange. Quarterly revenues will fluctuate depending on copper and gold prices, the US/CDN Dollar exchange rate, and the timing of concentrate sales, which is dependent on concentrate production and the availability and scheduling of transportation.

 

OPERATIONS

 

During the quarter ended March 31, 2023, Imperial’s consolidated metal production was 10,155,001 pounds copper and 13,129 ounces gold, with 6,678,094 pounds copper and 9,980 ounces gold produced from Mount Polley and 3,476,907 pounds copper and 3,149 ounces gold from its 30% share of Red Chris mine production.

 

Mount Polley Mine

 

Q1 2023 vs Q4 2022

 

Mount Polley metal production for the first quarter of 2023 was 6,678,094 pounds copper and 9,980 ounces gold, compared to 3,785,629 pounds copper and 6,995 ounces gold produced during the fourth quarter of 2022. Metal production was up by 76.4% for copper and 42.7% for gold for this quarter due to higher mill throughput, higher copper and gold recoveries, and higher copper grade. The throughput was 15,440 tonnes per day compared to 11,783 tonnes per day, copper recovery was 81.1% compared to 68.9%, gold recovery was 71.5% compared to 61.8% and the copper head grade was 0.269% compared to 0.230% copper. Mount Polley mill operations will continue to try and increase throughput while maintaining the excellent metals recoveries that were achieved this quarter.

 

  Three Months Ended
March 31
Three Months Ended
December 31
  2023 2022
Ore milled – tonnes 1,389,635 1,084,016
Ore milled per calendar day – tonnes 15,440 11,783
Grade %  – copper 0.27 0.23
Grade g/t  – gold 0.31 0.33
Recovery %  – copper 81.1 68.9
Recovery %  – gold 71.5 61.8
Copper – 000’s pounds 6,678 3,786
Gold – ounces 9,980 6,995
     

 

Q1 2023 vs Q1 2022

 

During the comparative March 31, 2022 quarter, Mount Polley Mine was not in production.

 

Exploration, development, and capital expenditures in the first quarter of 2023 were $4.8 million compared to $2.3 million in the 2022 comparative quarter.

 

Red Chris Mine

 

Q1 2023 vs Q4 2022

 

Red Chris metal production (100%) for the first quarter of 2023 was 11,589,689 pounds copper and 10,496 ounces gold, compared to 13,107,451 pounds copper and 14,518 ounces gold produced during the fourth quarter of 2022. At Red Chris, metal production was lower by 11.58% for copper and 27.7% for gold compared to the fourth quarter of 2022 primarily due to lower head grades of 0.32% copper and 0.31 g/t gold compared to 0.34% copper and 0.39 g/t gold in the previous quarter. The drop in grade was in line with expectations, as mining transitions into the lower gold grade Phase 7 ore source. Quarterly mill throughput decreased to 2,090,772 tonnes from 2,390,084 tonnes in the previous quarter with worn liners and an unplanned rock breaker failure impacting crusher operations.

 

Q1 2023 vs Q1 2022

 

100% Red Chris mine production Three Months Ended March 31
  2023 2022
Ore milled – tonnes 2,090,772 2,025,457
Ore milled per calendar day – tonnes 23,231 22,505
Grade %  – copper 0.32 0.41
Grade g/t  – gold 0.31 0.36
Recovery %  – copper 77.4 72.5
Recovery %  – gold 50.2 51.9
Copper – 000’s pounds 11,590 13,310
Gold – ounces 10,496 12,088

 

Imperial’s 30% share of exploration, development, and capital expenditures were $19.4 million in the March 2023 quarter compared to $29.1 million in the 2022 comparative quarter.

 

Block Cave Feasibility Study

 

At Red Chris, progress towards block cave mining is advancing with the exploration decline at 2,963 metres as of April 14 2023, and the completion of the first ventilation raise for the decline. The Block Cave Feasibility Study is expected to be completed in the second half of 2023. Several options to optimize the initial extraction level of the first block cave and thus access high grade ore earlier are being considered in the study. Expansion options for the processing plant are being considered in the Feasibility Study, including the option to stage expansion to match the cave ramp up.

 

The exploration program continued at Red Chris during the first quarter of 2023 with ongoing drilling east of the East Ridge Exploration Target returning positive results. Target generation has also identified an initial portfolio of high priority copper-gold targets within the Red Chris porphyry corridor for further testing.

 

During the reporting period, there were up to four diamond drill rigs in operation. A further 10,532 metres of drilling was completed during the quarter from 10 drill holes, with all drill holes intersecting mineralization. Drilling continues to confirm the vertical extent of the mineralization within the East Ridge Exploration Target.

 

Jim Miller-Tait, P.Geo., Imperial Metals Vice President Exploration, is the designated Qualified Person as defined by National Instrument 43-101 for the Red Chris exploration program.

 

Huckleberry Mine

 

Huckleberry operations ceased in August 2016 and the mine remains on care and maintenance status. The Company anticipates working towards the restart of Huckleberry following the start of operations at Mount Polley.

 

Site personnel continue to focus on maintaining site access, water management (treatment and release of mine contact water into Tahtsa Reach), snow removal, maintenance of site infrastructure and equipment, mine permit compliance, environmental compliance monitoring and monitoring tailings management facilities.

 

Geotechnical programs conducted in 2021 have indicated that some work is required to upgrade the existing facility and provided information required to update the tailings facility design for future operations.

 

For the March 2023 quarter, Huckleberry incurred idle mine costs comprised of $1.8 million in operating costs and $0.3 million in depreciation expense compared to $1.3 million in operating cost and $0.2 million in depreciation expense in the comparable quarter of 2022.

 

EARNINGS AND CASH FLOW

 

Select Quarter Financial Information Three Months Ended March 31  
expressed in thousands of dollars, except share and per share amounts   2023     2022  
Operations:    
Total revenues $92,664   $33,126  
Net loss $(7,253 ) $(6,925 )
Net loss per share $(0.05 ) $(0.05 )
Diluted loss per share $(0.05 ) $(0.05 )
Adjusted net loss $(7,255 ) $(18,754 )
Adjusted net loss per share $(0.05 ) $(0.13 )
Adjusted EBITDA $5,923   $(13,380 )
Cash earnings $5,404   $(13,331 )
Cash earnings per share $0.03   $(0.09 )
Working capital (deficiency) $(88,980 ) $(44,107 )
Total assets $1,316,087   $1,190,293  
Total debt (including current portion) $227,761   $61,298  

 

NON-IFRS FINANCIAL MEASURES

 

The Company reports four non-IFRS financial measures: adjusted net income (loss), adjusted EBITDA, cash earnings and cash cost per pound of copper produced which are described in detail below. The Company believes these measures are useful to investors because they are included in the measures that are used by management in assessing the financial performance of the Company.

 

Adjusted net income (loss), adjusted EBITDA, cash earnings and cash cost per pound of copper are not standardized financial measures under IFRS and might not be comparable to similar financial measures disclosed by other issuers.

 

Adjusted Net Loss and Adjusted Net Loss Per Share

 

Adjusted net loss is derived from operating net loss by removing the gains or loss, resulting from acquisition and disposal of property, mark to market revaluation of derivative instruments not related to the current period, net of tax, unrealized foreign exchange gains or losses on non-current debt, net of tax and other non-recurring items. Adjusted net loss in the March 2023 quarter was $7.3 million ($0.05 per share) compared to an adjusted net loss of $18.8 million ($0.13 per share) in the 2022 comparative quarter. We believe that the presentation of Adjusted Net Loss helps investors better understand the results of our normal operating activities and the ongoing cash generating potential of our business.

 

Adjusted EBITDA

 

Adjusted EBITDA in the March 2023 quarter was $5.9 million compared to a loss of $13.4 million in the 2022 comparative quarter. We define Adjusted EBITDA as net income (loss) before interest expense, taxes, depletion, and depreciation, and as adjusted for certain other items.

 

We believe that the presentation of Adjusted EBITDA is appropriate to provide additional information to investors about certain non-cash items and is useful to investors as an important indicator of our operations and the performance of our core business.

 

Cash Earnings and Cash Earnings Per Share

 

Cash earnings in the March 2023 quarter was $5.4 million compared to negative $(13.3) million in the 2022 comparative quarter. Cash earnings per share was $0.03 in the March 2023 quarter compared to $(0.09) in the 2022 comparative quarter.

 

Cash earnings and cash earnings per share are measures used by the Company to evaluate its performance however they are not terms recognized under IFRS. We believe that the presentation of cash earnings and cash earnings per share is appropriate to provide additional information to investors about how well the Company can earn cash to pay its debts and manage its operating expenses and investment. Cash earnings is defined as cash flow from operations before the net change in non-cash working capital balances, income and mining taxes paid, and interest paid. Cash earnings per share is the same measure divided by the weighted average number of common shares outstanding during the year.

 

Cash Cost Per Pound of Copper Produced

 

The Company is primarily a copper producer and therefore calculates this non-IFRS financial measure individually for its three copper mines, Red Chris (30% share), Mount Polley and Huckleberry, and on a composite basis for these mines. Variations from period to period in the cash cost per pound of copper produced are the result of many factors including: grade, metal recoveries, amount of stripping charged to operations, mine and mill operating conditions, labour and other cost inputs, transportation and warehousing costs, treatment and refining costs, the amount of by-product and other revenues, the US$ to CDN$ exchange rate and the amount of copper produced.

 

Idle mine and mine restart costs during the periods when the Huckleberry and Mount Polley mines are not in operation have been excluded from the cash cost per pound of copper produced.

 

Calculation of Cash Cost Per Pound of Copper Produced
expressed in thousands, except cash cost per pound of copper produced
Three Months Ended March 31, 2023
  Red Chris Mount Polley Composite
  A B C=A+B
Cash cost of copper produced in US$ $19,683 $16,229 $35,912
Copper produced – pounds   3,477   6,678   10,155
Cash cost per lb copper produced in US$ $5.66 $2.43 $3.54
       
expressed in thousands, except cash cost per pound of copper produced Three Months Ended March 31, 2022
  Red Chris Mount Polley(1) Composite
  A B C=A+B
Cash cost of copper produced in US$ $11,147   $ – $11,147
Copper produced – pounds   3,993     3,993
Cash cost per lb copper produced in US$ $2.79   $ – $2.79
(1) Mount Polley mine operations were suspended in May 2019, and the mine remained on care and maintenance until the economics of mining improved. The mine restarted operations in late June 2022.

For detailed information, refer to Imperial’s 2023 First Quarter Report available on imperialmetals.com and sedar.com.

 

About Imperial

 

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), the Red Chris mine (30%). Imperial also holds a portfolio of 23 greenfield exploration properties in British Columbia.

 

Posted May 10, 2023

Share this news article

MORE or "UNCATEGORIZED"


Commerce Resources Announces Closing Of C$2.15 Million Non-Brokered Private Placement Of Secured Convertible Notes

Commerce Resources Corp.  (TSX-V: CCE) (FSE: D7H0) is pleased to... READ MORE

May 13, 2025

North Bay Resources Announces Resource Estimate of 474,000 ounces at Fran Gold Project, British Columbia

North Bay Resources, Inc. (OTC: NBRI) is pleased to announce a re... READ MORE

May 13, 2025

NEVGOLD ADDS MORE SIGNIFICANT OXIDE GOLD-ANTIMONY RESULTS: 2.19 G/T AUEQ OVER 64.0 METERS (0.72 G/T AU AND 0.33% ANTIMONY), INCLUDING 4.17 G/T AUEQ OVER 24.1 METERS (1.47 G/T AU AND 0.60% ANTIMONY), AND ALSO INCLUDING 10.86 G/T AUEQ OVER 4.50 METERS (1.43 G/T AU AND 2.10% ANTIMONY) AT THE LIMOUSINE BUTTE PROJECT, NEVADA

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE

May 13, 2025

G2 Drills 76m @ 1.5 g/t Au and 3m @ 12.5 g/t Au in Scout Drilling at Peters Mine, Guyana

G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to annou... READ MORE

May 13, 2025

Aya Gold & Silver Reports Record Q1-2025 Results, Strengthens Liquidity and Reaffirms Guidance

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE

May 13, 2025

Copyright 2025 The Prospector News