The Prospector News

Great Bear Reports Successful LP Fault Extension and Infill Drilling: 10.50 g/t Gold Over 13.10 m, 16.50 g/t Gold Over 6.25 m, and 11.18 g/t Gold Over 6.75 m

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Great Bear Reports Successful LP Fault Extension and Infill Drilling: 10.50 g/t Gold Over 13.10 m, 16.50 g/t Gold Over 6.25 m, and 11.18 g/t Gold Over 6.75 m

 

 

 

 

 

Great Bear Resources Ltd. (TSX-V: GBR) (OTCQX: GTBAF) reported results from its ongoing fully funded $45 million 2021 exploration program at its 100% owned flagship Dixie Project in the Red Lake district of Ontario.

 

Chris Taylor, President and CEO of Great Bear said, “Predictability is a trait that builds first-class mineral deposits, distinguishing the ‘best of the best’.  With every week that goes by, we successfully expand and fill in the LP Fault zone precisely because of its impressive, predictable continuity.  In four months so far in 2021, we’ve already extended the area of drill-defined continuous gold mineralization at the LP Fault by approximately 25%.  At the scale of the LP Fault, this is an impressive achievement with few current exploration stage parallels.”

 

With the 13 drill holes included in this release, Great Bear has released 283 LP Fault drill holes and anticipates at least 117 additional LP Fault drill holes will be completed by the end of 2021, for a total of at least 400 drill holes.

 

Highlights of Current Results

 

  • Drill holes reported in this release intersected the LP Fault zone from approximately 25 to 500 metres vertical depth along 1.7 kilometres of strike length. Figure 1 and Figure 2.
  • Drill holes were located a) below previous drilling, and b) within 75 to 100 metre previously undrilled gaps in the zone. Table 1.
  • Two drill holes are step-downs that extend gold mineralization by more than 100 metres below previous drilling on two drill sections, expanding the LP Fault zone to depth in these locations.
    • BR-284, a 125 metre step-down, assayed 11.18 g/t gold over 6.75 metres from 524.20 to 530.95 metres downhole, and
    • BR-291, a 139 metre step-down, assayed 1.00 g/t gold over 96.10 metres from 477.00 to 573.10 metres downhole. This included a high-grade core of 16.41 g/t gold over 2.40 metres from 485.00 to 487.40 metres downhole.
  • Infill drilling within 75 – 100 metre previously undrilled gaps in the zone also continues to deliver high-grade and bulk-tonnage gold intercepts.
    • BR-272 assayed 10.50 g/t gold over 13.10 metres from 313.20 to 326.30 metres downhole. A high-grade core assaying 33.35 g/t gold over 3.70 metres was present from 313.20 to 316.90 metres downhole.
    • BR-247 assayed 16.50 g/t gold over 6.25 metres from 365.00 to 371.25 metres downhole. This included a high-grade core of 169.00 g/t gold over 0.50 metres from 369.50 to 370.00 metres downhole.

 

Results continue to demonstrate excellent continuity of high-grade and bulk-tonnage gold mineralization.  The LP Fault zone remains open to extension in all directions.

 

Table 1: Current drill results from the LP Fault.  Results are arranged by drill section from southeast (top) to northwest (bottom).

 

 

Drill Hole From (m) To (m) Width* (m) Gold (g/t)  Section
BR-281 170.25 174.00 3.75 1.04 20300
and 254.00 255.00 1.00 4.51
BR-282 396.50 440.20 43.70 0.96 20750
including 396.50 397.50 1.00 33.40
and 453.80 456.60 2.80 0.99
BR-284 518.25 530.95 12.70 6.20 20775
including 524.20 530.95 6.75 11.18
and including 527.10 527.70 0.60 76.10
BR-283 400.50 423.55 23.05 1.05 20850
including 402.40 410.50 8.10 2.59
and 441.00 468.05 27.05 1.00
including 464.90 466.20 1.30 10.20
BR-247 365.00 371.25 6.25 16.50 21025
including 368.00 370.00 2.00 51.05
and including 369.50 370.00 0.50 169.00
and 446.65 447.15 0.50 16.90
BR-248 30.25 31.00 0.75 21.50 21025
and 295.00 296.50 1.50 1.81
and 418.85 419.60 0.75 1.25
BR-290 402.10 423.00 20.90 1.07 21050
including 411.00 417.25 6.25 2.89
BR-291 322.90 326.90 4.00 1.12 21075
and 477.00 573.10 96.10 1.00
including 482.00 488.50 6.50 7.78
and including 485.00 487.40 2.40 16.41
and including 522.00 522.50 0.50 20.40
and 579.70 584.30 4.60 1.42
including 583.70 584.30 0.60 9.38
BR-249 327.35 338.10 10.75 2.39 21125
including 334.35 338.10 3.75 5.28
BR-273 183.00 186.00 3.00 1.09 21925
and 413.00 417.10 4.10 3.69
BR-275 420.75 426.30 5.55 2.12 21925
and 479.00 490.05 11.05 1.24
including 487.35 488.10 0.75 6.02
and 546.70 547.55 0.85 25.10
BR-274 356.80 359.00 2.20 1.65 21950
including 394.65 396.95 2.30 3.01
BR-272 313.20 326.30 13.10 10.50 21975
including 313.20 316.90 3.70 33.56
and including 313.20 313.70 0.50 182.00
* Widths are drill indicated core length, as insufficient drilling has been undertaken to determine true widths at this time.  Average grades are calculated with un-capped gold assays, as insufficient drilling has been completed to determine capping levels for higher grade gold intercepts.  Interval widths are calculated using a 0.10 g/t gold cut-off grade with up to 3 m of internal dilution of zero grade.

 

 

Great Bear’s progress can be followed using the Company’s plan maps, long sections and cross sections, and through the VRIFY model posted at the Company’s web site at www.greatbearresources.ca.  All LP Fault drill hole highlighted assays, plus drill collar locations and orientations can also be downloaded at the Company’s web site.

 

 

Drill collar location, azimuth and dip for drill holes included in this release are provided in the table below (UTM zone 15N, NAD 83):

 

 

Hole ID Easting Northing Elevation Length Dip Azimuth
BR-247 456733 5634598 359 693 -62 218
BR-248 456677 5634536 363 552 -60 217
BR-249 456600 5634560 360 522 -61 217
BR-272 455943 5635108 374 549 -56 216
BR-273 455981 5635073 375 573 -56 223
BR-274 455981 5635073 373 539 -60 223
BR-275 455981 5635073 375 615 -67 223
BR-281 457274 5634206 354 399 -46 200
BR-282 456962 5634438 356 648 -59 208
BR-283 456887 5634501 357 657 -56 210
BR-284 456976 5634533 358 681 -55 216
BR-290 456668 5634603 359 459 -59 216
BR-291 456700 5634655 359 702 -59 217

 

About the Dixie Project

 

The Dixie Project is 100% owned, comprised of 9,140 hectares of contiguous claims that extend over 22 kilometres, and is located approximately 25 kilometres southeast of the town of Red Lake, Ontario. The project is accessible year-round via a 15 minute drive on a paved highway which runs the length of the northern claim boundary and a network of well-maintained logging roads.

 

The Dixie Project hosts two principal styles of gold mineralization:

 

  • High-grade gold in quartz veins and silica-sulphide replacement zones (Dixie Limb, Hinge and Arrow zones). Hosted by mafic volcanic rocks and localized near regional-scale D2 fold axes. These mineralization styles are also typical of the significant mined deposits of the Red Lake district.
  • High-grade disseminated gold with broad moderate to lower grade envelopes (LP Fault). The LP Fault is a significant gold-hosting structure which has been seismically imaged to extend to 14 kilometres depth (Zeng and Calvert, 2006), and has been interpreted by Great Bear to have up to 18 kilometres of strike length on the Dixie property. High-grade gold mineralization is controlled by structural and geological contacts, and moderate to lower-grade disseminated gold surrounds and flanks the high-grade intervals. The dominant gold-hosting stratigraphy consists of felsic sediments and volcanic units.

 

About Great Bear

 

Great Bear Resources Ltd. is a well-financed gold exploration company managed by a team with a track record of success in mineral exploration.  Great Bear is focused in the prolific Red Lake gold district in northwest Ontario, where the company controls over 330 km2 of highly prospective tenure across 5 projects: the flagship Dixie Project (100% owned), the Pakwash Property (earning a 100% interest), the Dedee Property (earning a 100% interest), the Sobel Property (earning a 100% interest), and the Red Lake North Property (earning a 100% interest) all of which are accessible year-round through existing roads.

 

QA/QC and Core Sampling Protocols

 

Drill core is logged and sampled in a secure core storage facility located in Red Lake Ontario.  Core samples from the program are cut in half, using a diamond cutting saw, and are sent to Activation Laboratories in Ontario, an accredited mineral analysis laboratory, for analysis. All samples are analysed for gold using standard Fire Assay-AA techniques. Samples returning over 10.0 g/t gold are analysed utilizing standard Fire Assay-Gravimetric methods.  Pulps from approximately 5% of the gold mineralized samples are submitted for check analysis to a second lab.  Selected samples are also chosen for duplicate assay from the coarse reject of the original sample.  Selected samples with visible gold are also analyzed with a standard 1 kg metallic screen fire assay.  Certified gold reference standards, blanks and field duplicates are routinely inserted into the sample stream, as part of Great Bear’s quality control/quality assurance program.  No QAQC issues were noted with the results reported herein.

 

Qualified Person and NI 43-101 Disclosure

 

Mr. R. Bob Singh, P.Geo, VP Exploration, and Ms. Andrea Diakow P.Geo, Exploration Manager for Great Bear are the Qualified Persons as defined by National Instrument 43-101 responsible for the accuracy of technical information contained in this news release.

 


Figure 1: Plan map showing the locations of drill holes reported in this release. (CNW Group/Great Bear Resources Ltd.)

 


Figure 2: Long section of the LP Fault. Step-down drill holes referenced in this release are labeled. (CNW Group/Great Bear Resources Ltd.)

 

Posted April 22, 2021

Share this news article

MORE or "UNCATEGORIZED"


Canada Carbon Receives Full Assay Results on its Asbury Property, Including 12.25%Cg over 22.50 Metres

Canada Carbon Inc. (TSX-V:CCB) (FF:U7N1) is pleased to announce i... READ MORE

March 18, 2024

enCore Energy Encounters Highest Grade Drill Results at Alta Mesa Uranium Project; Provides Status on South Texas Production Operations

enCore Energy Corp. (NASDAQ: EU) (TSX-V: EU) a domestic uranium ... READ MORE

March 18, 2024

Canada Nickel Makes New Discovery at Newmarket Property, Achieves Best Drill Results at Reid to Date and Announces Grant of Options and RSUs

Highlights First two holes at Newmarket successfully intersect ta... READ MORE

March 18, 2024

Imperial Reports 2023 Financial Results

Imperial Metals Corporation (TSX:III) reports financial results f... READ MORE

March 15, 2024

Outcrop Silver Announces Closing $3.45 Million Public Offering, Including the Full Exercise of the Over-Allotment Option

Outcrop Silver & Gold Corporation (TSX-V: OCG) (OTCQX: OCGSF)... READ MORE

March 14, 2024

Copyright 2024 The Prospector News