The Prospector News

G Mining Ventures Reports Fourth Quarter 2025 Operational Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

G Mining Ventures Reports Fourth Quarter 2025 Operational Results

 

 

 

 

 

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to announce its preliminary production results for the fourth quarter and full year ended December 31, 2025, for the Tocantinzinho Gold Mine located in the State of Pará, Brazil.

 

During the fourth quarter, TZ produced 47,346 ounces of gold, with the mill processing 1,077 kt of ore at an average grade of 1.49 g/t Au and achieving recoveries of 91.8%.

 

For the full year, TZ produced 171,871 ounces of gold, from the processing of 4,086 kt of ore at an average grade of 1.44 g/t Au and recoveries averaging 90.6%.

 

“Tocantinzinho delivered a strong fourth quarter, successfully closing its first full year of commercial production,” commented Louis-Pierre Gignac, President & Chief Executive Officer, “Continued optimization initiatives are driving improvements in mine and plant productivity. These strong operational results were achieved alongside a solid safety performance, with only two lost time incidents, resulting in a Lost Time Injury Frequency Rate of 0.15.”

 

Fourth Quarter & Full Year 2025 Production Results Highlights

  • The average mining rate increased to 64.7 thousand tonnes per day, representing an 18% rise compared to Q3 2025 following the commissioning of additional mining equipment
  • Gold production totaled 47,346 ounces in the fourth quarter and 171,871 ounces for the full year
  • Gold sales amounted to 47,457 ounces for the fourth quarter and 172,093 ounces for the full year

 

 

Table 1. Tocantinzinho Preliminary Fourth Quarter and Full-Year 2025 Operational Results

 

TZ Production Q4 2025 FY 2025
Mining Activities      
Ore Tonnes Mined kt 1,725 6,673
Waste Tonnes Mined kt 4,230 12,407
Total Tonnes Mined kt 5,954 19,080
Strip Ratio Waste/Ore 2.45 1.86
Average Mining Rate tpd 64,720 52,272
Processing Activities      
Total Tonnes Processed kt 1,077 4,086
Average Plant Throughput tpd 11,711 11,195
Average Gold Recovery % 91.8 90.6
Average Gold Grade of Ore Processed g/t Au 1.49 1.44
Gold Produced oz 47,346 171,871
Gold Sold oz 47,457 172,093
       

 

Operational results are preliminary in nature and subject to final reconciliation. Financial and operational results for the fourth quarter and year-end 2025 will be released at the end of March, followed by a conference call hosted by senior management.

 

Qualified Person

 

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

 

About G Mining Ventures Corp.

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Mine in Brazil, supported by the Gurupi Project in Brazil and the Oko West Project in Guyana — all with significant exploration upside and located in mining-friendly jurisdictions.

Posted January 13, 2026

Share this news article

MORE or "UNCATEGORIZED"


Gold Candle to Acquire Pan American Silver’s Larder Property, Further Enhancing Its Presence in the Abitibi

Acquisition Adds Indicated Gold Resources of 388koz and Inferred ... READ MORE

May 8, 2026

Scorpio Gold Drills 0.62 G/T Gold Over 62.21 Metres From 230.43 Metres Within Manhattan Caldera, at Black Mammoth

Highlights • Hole 26MN-069 returned: o 0.62 g/t gold over 62.21... READ MORE

May 8, 2026

Wheaton Precious Metals Announces Record Revenue, Earnings and Cash Flow for the First Quarter of 2026

“Wheaton delivered a strong start to 2026, with Salobo and... READ MORE

May 8, 2026

Vior Gold Corporation Intersects 12.8 g/t Au Over 2.0 Meters and 5.45 g/t Au Over 3.0 Meters

VIOR GOLD CORPORATION INC. (TSX-V: VIO) (OTCQB: VIORF) (FRA: VL5)... READ MORE

May 7, 2026

One Bullion Reports Gravity-Finish Assay Results at Vumba Project, Including 30.8 g/t Au, and Receives EIA Approval for Maitengwe Project

Gravity-Finish Re-Assay Confirms High-Grade Gold Mineralization a... READ MORE

May 7, 2026

Copyright 2026 The Prospector News