The Prospector News

Pre-Feasibility Study for Richmond Hill Delivers Strong Economics with US$2 Billion After-Tax NPV(5%) and 71% IRR

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Pre-Feasibility Study for Richmond Hill Delivers Strong Economics with US$2 Billion After-Tax NPV(5%) and 71% IRR


Dakota Gold Corp.
(NYSE American: DC) is pleased to report the results of its S-K 1300 Pre-Feasibility Study for the Richmond Hill Oxide Heap Leach Gold Project in South Dakota. The PFS was prepared in conjunction with a maiden mineral reserve and an updated mineral resource estimate. The PFS highlights the potential for a profitable, open pit, gold heap leach operation at Richmond Hill.

PFS Highlights

  • Strong Economics: At a base case gold price of $3,500 per ounce, the Project has an after-tax net present value of $2.0 billion and an internal rate of return of 71%. At a gold price of $4,250 per ounce, the NPV5% increases to $2.7 billion, and the IRR increases to 94%.
  • Heap leachable Mineral Reserves and Resources (Table 4): An updated mineral estimate for Richmond Hill following a successful definition and expansion drill program includes Proven and Probable heap leachable mineral reserves grading 0.56 grams per tonne gold and 6.61 g/t silver, containing approximately 2.16 million ounces of Au and 25.4 Moz of Ag. The Measured and Indicated category of the mineral resource exclusive of reserves includes 0.4 Moz Au and 5.2 Moz of Ag grading 0.32 g/t Au and 4.28 g/t Ag. The Inferred category contains 1.1 Moz of Au and 8.0 Moz of Ag grading 0.38 g/t Au and 2.74 g/t Ag.
  • Millable Resources Provide Long-Term Optionality for the Project (Table 5): The Measured and Indicated category of the millable mineral resource includes 3.2 Moz Au grading 0.48 g/t Au, and the Inferred category contains 2.7 Moz of Au grading 0.43 g/t Au.
  • Gold Production at Low-Cost: Life of mine production totals 1.6 million ounces of gold over nine years, with an average annual production of 171,000 ounces of gold, at a nominal design stacking rate of 41,000 tonnes per day. Initial Capital is $538 million, including $84 million contingency, with life of mine All-in Sustaining Costs of $1,066 per ounce of gold before State Severance Tax and $1,289 per ounce of gold including the State Severance Tax. AISC is a non-GAAP measure; see “Non-GAAP Measures” below.
  • Feasibility and Permitting Underway: Work has commenced on the Feasibility Study planned for mid-2027 with production targeted for 2029. Permitting is through the county and state of South Dakota where the Project could generate over $348 million in State Severance taxes over the life of the project along with hundreds of high paying jobs and other economic benefits.
  • Targeting a Minimum 10% Increase in Reserves for the FS: Approximately 3,800 m of metallurgical drilling throughout the Project and 11,000 m of definition drilling in the central area to inform the FS is underway with two drills in operation. The definition drilling is targeting Inferred material conversion in the high-recovery breccia zone not included in the PFS economics, mine sequence and mineral estimate – representing further upside. (see details and disclosure for the 2026-2027 Definition Drill Program)

Jack Henris, CEO, President and Director of Dakota Gold, said, “We are pleased to share results that demonstrate Richmond Hill’s potential to be a significant economic driver for South Dakota. As a South Dakotan, I am proud to see that we have an opportunity to advance a project at home that could generate more than $348 million in projected State Severance Taxes over the life of mine, while supporting hundreds of high-paying jobs.”

Shawn Campbell, Chief Financial and Development Officer of Dakota Gold, commented, “Richmond Hill combines strong project economics, competitive operating costs and relatively low initial capital intensity in a well-established U.S. mining jurisdiction. These attributes provide a strong foundation as we advance feasibility work, evaluate future construction financing opportunities, continue investing in local communities, and advance our broader portfolio of projects across the Homestake District.”

 

Table 1: PFS key parameters 

Pre-Feasibility Key Parameters (All Currencies in US$)
Key Assumptions
Base Case Gold Price $3,500/oz
Base Case Silver Price $50.00/oz
Production Profile
Total Tonnes Processed (Mt) 120
Strip Ratio 1.18
Heap Leach Gold Feed Grade (oz/ton) 0.016
Heap Leach Gold Feed Grade (g/t) 0.561
Mine Life (years) 9
Nominal Stacking Rate (KTPD) 41
LOM Gold Recovery (%) 72.4%
LOM Gold Payable (koz) 1,562
LOM Average Annual Gold Payable (koz) 171
Unit Operating Costs ($/payable oz Au)
Operating Costs $977
AISC $1,289
Capital Costs
Initial Capital Cost $538 M
Sustaining Capital Cost $133 M
Closure Capital Cost $62 M

Abbreviations in the table include ounces; million tonnes; ounces per ton; grams per tonne; thousand tonnes per day; thousand ounces; life of mine; all-in sustaining costs.

 

Table 2: PFS sensitivity to gold price, costs and recovery

Sensitivity to Gold Price (US$ where applicable)

Gold Price (US$/oz) $2,750 $3,000 $3,250 $3,500
(Base Case)
$3,750 $4,000 $4,250 $4,500 $4,750
After-Tax
NPV(5%) (US$)
$1,249 M $1,501 M $1,752 M $2,000 M $2,248 M $2,496 M $2,744 M $2,991 M $3,239 M
After-Tax IRR 47% 55% 63% 71% 79% 87% 94% 102% 110%
After-Tax Payback 2.1 years 1.8 years 1.6 years 1.4 years 1.3 years 1.2 years 1.1 years 1.0 years 0.9 years

Abbreviations in the table include net present value; internal rate of return.

Sensitivity to Operating Costs and Capital Costs (After-Tax NPV5% US$M)

Sensitivity Parameters Base Case -21% -14% -7% 0% 
(Base Case)
+7% +14% +21%
Operating Costs $12.76/t $2,199 M $2,132 M $2,066 M $2,000 M $1,934 M $1,868 M $1,799 M
Capital Costs $671 M $2,089 M $2,059 M $2,029 M $2,000 M $1,970 M $1,941 M $1,911 M

Sensitivity to Recovery* (After-Tax NPV5% US$M)

Sensitivity Parameters Base Case 66% 68% 70% 72.4% 
(Base Case)
Gold Recovery 72.4% $1,692 M $1,788 M $1,883 M $2,000 M

* Recoveries above base case (72.4%) have not been calculated.

 


Table 3:
 PFS after-tax free cash flow profile – For years 1 through 8 the average after-tax free cash flow per year is ~$366 M at a gold price of $3,500/oz and $474 M at a gold price of $4,250/oz

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/325309_15f5eb9d341d9a61_002full.jpg

Cumulative After-Tax Free Cash Flow Profile (US$M)

PRE-PROD YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 LOM
(US$3,500/oz Au) -$471 -$170 $214 $600 $843 $1,126 $1,576 $2,168 $2,458 $2,627 $2,631 $2,558 $2,558
(US$4,250/oz Au) -$471 -$53 $448 $944 $1,269 $1,639 $2,209 $2,949 $3,323 $3,535 $3,539 $3,462 $3,462

Abbreviations in the table include pre-production; year.

 

Overview

The PFS outlines a strong foundation for future growth and mine-sequence optimization at Richmond Hill. The study is informed by a large, near-surface heap-leachable resource which has been updated concurrently with the PFS.

Table 4: Richmond Hill heap leachable reserves and resources as of November 2026

Richmond Hill heap leachable reserves
Category NSR ($/tonne) Ktonnes Gold (g/t) Silver(g/t) Gold (koz) Silver (koz)
Proven 36.57 57,115 0.613 7.33 1,126 13,457
Probable 30.99 62,482 0.514 5.96 1,033 11,964
Reserves Total 33.65 119,597 0.561 6.61 2,158 25,421
Richmond Hill heap leachable resources
Category NSR ($/tonne) Ktonnes Gold (g/t) Silver(g/t) Gold (koz) Silver (koz)
Measured 21.24 8,718 0.307 4.03 86 1,129
Indicated 21.03 28,764 0.319 4.36 295 4,029
M&I Resources Total 21.08 37,482 0.316 4.28 381 5,158
Inferred 25.09 89,731 0.377 2.74 1,088 8,012

Notes:

  • Mineral resources reported are exclusive of reserves.
  • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology.
  • A gold price of $2,900 per ounce and a silver price of $35 per ounce was used for the mineral resources.
  • The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material.
  • A gold price of $2,600 per ounce and a silver price of $30 per ounce was used for the mineral reserves.
  • Mineral reserves are based on net smelter return (NSR) cut-offs that vary by time period to balance mine and plant production capacities. They range from a high of $11.00/tonne to a low of $6.39/tonne (internal cut-off grade).
  • Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Heap-leachable reserves NSR ($/tonne) = $72.60 x gold (g/tonne) x recovery + $0.83 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content.
  • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
  • The heap-leachable mineral resource consists of the oxide and transition mineralization in the mineral deposit.
  • Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
  • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources.
  • The mineral reserve estimate and mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

The additional milled material provides long-term optionality for the Project (see Table 5). The reserves and resources are informed by a historical database containing 56,280 gold assays from 901 drill holes totaling 92,464 meters of drilling, and an additional 62,366 gold assays from 485 drill holes totaling 92,617 meters of drilling by Dakota Gold since 2022 to expand the resource.

The Richmond Hill property remains subject to an option agreement between Dakota Gold and Homestake Mining Company of California a Barrick company.

The PFS was led by M3 Engineering and Technology Corporation (M3), SLR (formerly Forte Dynamics), NewFields, and IMC, independent engineering firms capable of delivering through Feasibility and into production as soon as 2029. Concurrently, the Company is undertaking baseline environmental studies that will inform future permitting requirements.

The S-K 1300 technical report summary for the PFS has been published on the Company’s websiteand filed by the Company with the Securities and Exchange Commission on EDGAR as an exhibit to its Current Report on Form 8-K dated Monday, November 23, 2026. The Report was prepared by an independent group of Qualified Persons with M3 as the Study Manager.

Details of the PFS will be presented in a webcast conference call on Monday, November 23, 2026 at 4:45 PM Eastern Time Zone.

Webcast Conference Call Information

Date: Monday, November 23, 2026
Time: 4:45 PM Eastern Time Zone
Webcast and replay: Click Here 
USA/Canada Toll Free: +1-833-752-4751
International Toll: +1-647-849-3335

 

About Dakota Gold Corp.

Dakota Gold is a responsible exploration and development company advancing the Richmond Hill Gold Project toward production as soon as 2029, while continuing to define and expand the high-grade underground gold resource potential at the Maitland Gold Project. Both projects are located on private land within the historic Homestake District of South Dakota, one of the most prolific gold mining regions in the United States.

Subscribe to Dakota Gold’s e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

 

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris
CEO, President and Director
Tel: +1 605-717-2540

Shawn Campbell
Chief Financial and Development Officer
Tel: +1 778-655-9638

Carling Gaze
Director of Investor Relations
Tel: +1 605-679-7429
Email: info@dakotagoldcorp.com

 

Qualified Persons

The Report was prepared by an independent group of Qualified Persons with M3 Engineering and Technology Corporation as the Study Manager. M3 has reviewed and approved the contents of this news release.

 

2026-2027 Definition Drill Program Details and Disclosure

The 2026-2027 Definition Drill Program includes approximately 11,000 meters in 123 holes and is designed to test the potential to convert Inferred Mineral Resources within and adjacent to the PFS pit to Measured and Indicated. The Definition Drill Program is targeting a minimum 10% increase in reserves for the Feasibility Study. Management’s internal objective is to evaluate whether this work, together with pit optimization, could support an increase in Mineral Reserves in the Feasibility Study. This objective is not an estimate of Mineral Reserves, has not been verified by a Qualified Person as a reserve estimate, and there is no certainty that any Inferred Mineral Resources will be upgraded or converted to Mineral Reserves, or that Mineral Reserves will increase.

 

Appendix

Table 5: Richmond Hill millable resources as of November 2026

Resource Category NSR ($/tonne) Ktonnes Gold (g/t) Silver (g/t) Gold (koz) Silver (koz)
Measured Total 43.75 84,181 0.538 5.42 1,457 14,661
Indicated Total 35.78 125,298 0.432 5.21 1,740 20,994
M&I Total 38.99 209,479 0.475 5.29 3,197 35,655
Inferred Total 34.69 198,948 0.425 4.39 2,719 28,071

Mineral resources are based on a constrained block model using drill results up to June 17, 2026 using an inverse distance squared methodology and the following assumptions:

  • A gold price of $2900 per ounce and a silver price of $35 per ounce was used for the mineral resource.
  • Mineral resources are based on a net smelter return (NSR) cut-off of $12.22/tonne for mill material.
  • Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals.
  • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
  • The millable mineral resource consist of the sulfide portion of the mineral deposit.
  • Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
  • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources.
  • The mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

 

Table 6: Richmond Hill combined heap leachable and millable resources inclusive of reserves as of November 2026

Resource Category NSR ($/tonne) Ktonnes Gold (g/t) Silver (g/t) Gold (koz) Silver (koz)
Measured Total 41.34 150,014 0.549 6.17 2,669 29,248
Indicated Total 33.48 216,544 0.446 5.14 3,068 36,986
M&I Total 36.70 366,558 0.480 5.49 5,737 66,234
Inferred Total 31.70 288,680 0.411 3.77 3,807 36,083

Mineral resources are based on a constrained block model using drill results up to June 17, 2026 using an inverse distance squared methodology and the following assumptions:

  • A gold price of $2900 per ounce and a silver price of $35 per ounce was used for the mineral resource.
  • The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material and a NSR cut-off of $12.22/tonne for mill material.
  • Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content for heap-leachable mineral resources.
  • Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals for millable mineral resources.
  • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
  • Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
  • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resource.
  • The mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

Posted November 24, 2026

Share this news article

MORE or "UNCATEGORIZED"


Forte Minerals Secures Community Access Agreement for Exploration at the Alto Ruri High Sulphidation Gold Project, Peru

Forte Minerals Corp. (CSE: CUAU) (OTCQX: FOMNF) (Frankfurt: 2OA) is pleased to announce that it has ... READ MORE

November 24, 2026

Fury Intercepts 9.81 g/t Gold over 2.99 m within Seven Mineralized Zones at Eau Claire, Advancing Resource Conversion

Fury Gold Mines Limited (TSX: FURY) (NYSE American: FURY) is pleased to announce results from five ... READ MORE

November 24, 2026

CanAlaska Announces Preliminary Results from Summer Drill Program on West McArthur JV Project

CanAlaska Uranium Ltd. (TSX-V: CVV) (OTCQX: CVVUF) (FSE: DH7) is pleased to report that it has comp... READ MORE

November 24, 2026

Onyx Gold Intersects 1.6 g/t Gold Over 24.8 Meters at New SE Target, Extending Gold-Bearing Trend to Approximately 4 km

Onyx Gold Corp. (TSX-V: ONYX) (OTCQX: ONXGF) is pleased to report assay results from 36 drill holes ... READ MORE

November 24, 2026

Copyright 2026 The Prospector News