The Prospector News

FireFly makes another significant high-grade copper-gold VMS discovery

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

FireFly makes another significant high-grade copper-gold VMS discovery


FireFly Metals Ltd (ASX: FFM) (TSX: FFM) is pleased to announce a significant exploration discovery at the Green Bay Copper-Gold Project in Newfoundland, Canada.

Green Bay Copper-Gold Project, Canada

The greenfields discovery, just 35km from the flagship Ming Mine, highlights the exploration potential of numerous targets to be tested at Green Bay

 

 

KEY POINTS

  • Regional exploration drilling at the Green Bay Copper-Gold Project has discovered a significant copper and gold-rich Volcanogenic Massive Sulphide (VMS) system at the Mount Joy prospect near Tilt Cove
  • Mount Joy was a new target identified by FireFly’s extensive geophysical and geochemical campaign 
  • The first hole drilled to test the Electromagnetic (EM) geophysical anomaly intersected shallow and wide copper and gold mineralisation: 
    • 22.5m @ 2.5% copper equivalent (CuEq)1 from 109m, including 9.0m @ 3.9% CuEq (3.0% Cu & 1.0g/t Au) ~true thickness in hole FFR26-071
  • Follow-up step-out drilling has intersected ~40m of semi-massive sulphides in hole FFR26-076 (assays pending) 
  • Downhole EM (DHEM) points to more conductive targets off-hole ready to be drill tested
  • Mineralisation intersected in the drilling shares similar characteristics to other notable deposits in the district including Tilt Cove and Ming, which has a Mineral Resource Estimate (MRE) of 57.4Mt @ 2.4% CuEq Measured and Indicated (M&I) and 17.3Mt @ 2.8% CuEq Inferred Mineral Resources 
  • This drilling is part of the first ever drill program completed by FireFly in the Tilt Cove – Betts Cove district and has resulted in immediate success with the discovery of a new copper-gold VMS system at Mount Joy
  • Mount Joy is located approximately 35km east of the Ming Mine and just 2.6km from the Company’s Nugget Pond Mill currently on care and maintenance
  • The Mount Joy discovery highlights the potential upside of the abundant high-quality targets yet to be drilled at Green Bay
  • Regional discoveries offer the potential to add new prospective mineral deposits to the production profiles outlined in the Company’s recently released Preliminary Economic Assessment (PEA), and are therefore particularly valuable
  • Three surface rigs will continue with regional drilling, with assays expected from Mount Joy and other regional targets over the coming weeks
  • A maiden MRE on the regional target known as Main Mine is planned for the next quarter. This was the first target the Company drill tested outside of the Ming Mine when the Company commenced drilling earlier this year. It is located less than 3km from Ming Mine
  • An updated MRE and a Feasibility Study for the Green Bay Ming Mine project are on track for release in the next quarter and a Final Investment Decision (FID) is expected in mid-2027
  • FireFly is well-funded to achieve its growth objectives with ~A$368 million2 in cash and liquid investments (unaudited) as at 31 July 2026 

FireFly Managing Director Steve Parsons said: “Mount Joy is a significant discovery for several reasons. 

“It is already clear that the prospect contains high grades and substantial widths of mineralisation within a larger district-scale VMS system. And geophysics points to more highly prospective targets close to the newly discovered mineralisation. This discovery also underscores the immense potential of the pipeline of geophysical and geochemical targets we have identified at Green Bay.

“The Mount Joy discovery supports our plan to continue driving growth in the Mineral Resource, mine life and forecast production rates at Green Bay. As part of this strategy, we will release an updated Mineral Resource Estimate and a Feasibility Study in the coming quarter, ahead of a Final Investment Decision expected in mid-2027.”

The first drilling program at the Mount Joy prospect in the historic Tilt Cove–Betts Cove mining district has discovered a new copper-gold VMS system.

The discovery hole FFR26-071 intersected 22.5m at 2.5% CuEq (1.9% Cu and 0.6g/t Au) and included 9.0m at 3.9% CuEq (3.0% Cu and 1.0g/t Au). Follow-up drilling has intersected further extensive sulphide mineralisation, including ~40m of semi-massive sulphides (assays pending, with further information set out in Appendix B).3

The intersection shares many characteristics with other notable deposits in the district, including the historical Tilt Cove Mine (170kt of copper produced4) and the Ming Mine (current MRE of 57.4Mt @ 2.4% CuEq M&I plus 17.3Mt @ 2.8% CuEq Inferred). It demonstrates the potential for further discoveries within FireFly’s mineral properties along the prospective volcanic sequence that hosts the historic Tilt Cove copper mine.

Importantly, the Mount Joy discovery is located only 2.6km from FireFly’s existing Nugget Pond processing facility currently on care and maintenance.

The Mount Joy discovery is the direct result of FireFly’s significant investment in regional geophysics and generative geochemical prospecting. A large-scale EM anomaly was observed in airborne geophysics and followed up with ground-based surveys in 2025-2026. Surface mapping has identified numerous indicators of copper mineralisation including the oxidised copper mineral, Malachite. 

Subsequent DHEM surveys conducted in the drilling suggest a broad mineralised system with numerous off-hole conductive anomalies identified. 

Regional exploration remains a core strategic pillar of FireFly’s strategy to unlock the full potential of the Green Bay project, with C$16.7M budgeted for regional programs in FY27. Three surface rigs are planned to continue regional exploration drilling for the remainder of the year, with a maiden Inferred MRE expected for the Main Mine deposit in Q1 2027. Further regional exploration results are expected imminently. 

Work to advance Green Bay towards construction has accelerated since the Company released the results of the PEA for the upscaled restart on 25 August 2026. Early works have commenced and the Company remains on track to deliver an updated MRE and Feasibility Study in Q1 2027. A FID is expected to be considered in mid-2027.

FireFly remains well funded to advance the Green Bay project, with approximately A$368M5 in cash and liquid investments (unaudited) as at 31 July 2026.


Figure 1: Map showing the location of the Mount Joy discovery.
 The discovery hole is only ~35km from the Ming Mine and only 2.6km from FireFly’s Nugget Pond processing facility currently on care and maintenance.


Figure 2: Mount Joy discovery hole FFR26-071 with high-grade copper and gold mineralisation of 22.5m @ 2.5% CuEq including 9.0m @ 3.9% CuEq (3.0% Cu and 1.0g/t Au). Core photograph showing mineralisation in the upper VMS and transitioning into the lower stringer zone.
 These mineralisation styles are similar to those observed at the Ming Mine (with a current MRE of 57.4Mt @ 2.4% CuEq M&I plus 17.3Mt @ 2.8% CuEq Inferred).

 

About the Mount Joy Drilling Results

FireFly has made a new copper-gold VMS discovery at Mount Joy, approximately 2.6km from the Company’s Nugget Pond processing facility. The discovery was made during the first helicopter-supported drilling program at the prospect, following airborne EM survey in 2025 and ground EM survey during winter 2026.

Mount Joy occurs along the same prospective stratigraphic contact as the historic Tilt Cove copper mine (Figure 4). The contact can be traced for several kilometres north and south of the discovery.

The first hole, FFR26-064, intersected 6.5m at 2.0% CuEq (0.8% Cu and 1.2g/t Au from 15.6m). Subsequent DHEM survey identified a strong off-hole conductor approximately 80m south of the initial intersection, tested by FFR26-071.

FFR26-071 intersected 22.5m at 2.5% CuEq (1.9% Cu, 0.6g/t Au and 0.4% Zn), including 9.0m at 3.0% Cu and 1.0g/t Au. The mineralisation comprises massive sulphide, predominantly pyrite with chalcopyrite and sphalerite, underlain by copper-gold-bearing stringer mineralisation. These features are consistent with a well-developed VMS system.

Follow-up hole FFR26-076, drilled from the same platform as FFR26-071, intersected approximately 40m of semi-massive sulphide mineralisation between 240m and 280m downhole, with additional pyrite-chalcopyrite stringer mineralisation continuing beyond 400m. Assays are pending. Geological interpretation indicates that mineralisation in FFR26-071 and FFR26-076 is separated by a fault, with FFR26-076 testing the underlying footwall sequence (Figure 5).

Assays received to date are summarised in Table 1.

Hole From (m) Interval (m) Cu (%) Au (g/t) Zn (%)
FFR26-064 15.55 6.45 0.81 1.19 —
FFR26-071 109.00* 22.50 1.87 0.64 0.38
including — 9.00 2.95 0.95 —
FFR26-076 240–280 approx. ~40 visual Pending Pending Pending

Table 1: summary of assays received to date from drilling at Mount Joy. Refer to Appendix B for further details on drill results and sulphide percentages observed. Please note that visual sulphides do not necessarily correspond to economic grades.

The helicopter-supported drilling program is complete. Remaining assays, geochemical analysis, borehole geophysics and structural interpretation will guide follow-up drilling. A winter access road is planned from Nugget Pond to enable track-mounted drilling during the Canadian winter of 2027.

Forward Work Plans

The FireFly growth strategy remains focused on advancing the Green Bay Ming Mine project towards the resumption of upscaled copper and gold production. Near term activities remain focused on:

  • 6 underground drill rigs upgrading the Mineral Resource, through infill drilling, from Inferred to M&I Mineral Resources;
  • High-grade shallow extensions of Ming underground for additional Mineral Resource Growth;
  • Completion of the Feasibility Study in Q1 2027;
  • Advancement of permitting, engineering and early works to support future development scenarios; and
  • New Discoveries from both underground and surface regional exploration drilling with 3 regional rigs operating (additional Mount Joy and other regional targets results pending);
  • A maiden Mineral Resource Estimate planned for completion in Q1 2027 at the Main Mine prospect located less than 3 km from the Ming Mine and future processing plant.

Green Bay (Ming Mine) Mineral Resource Development 

As of 30 September 2026, the Company had completed ~210,000 metres of underground diamond drilling. Six underground rigs will continue to advance the underground Mineral Resource conversion and extension activities for the foreseeable future.

Near-term underground drilling will remain focused on infill definition to upgrade areas of Inferred to the higher confidence M&I Mineral Resources ahead of economic studies into resuming upscaled production at Green Bay. The decision to focus on infill drilling is driven by numerous factors, including:

  • Ore Reserves can only be declared from M&I Mineral Resources;
  • M&I Mineral Resources can be incorporated into Feasibility Studies – no inferred resource is considered in the Feasibility mine plan; and
  • De-risking the project by further increasing confidence in the geological model and grade estimation.

The Company intends to complete sufficient economic work to declare maiden Ore Reserves in Q1 2027.

Green Bay (Ming Mine) Mineral Resource Growth

Mineral Resource growth in the coming months will be driven by testing lateral and down plunge extensions of the high-grade VMS channels parallel to the Ming North lode.

An updated MRE, incorporating drilling completed since the August 2026 MRE, is planned in Q1 2027 and will underpin the Feasibility Study.

Economic Studies 

The PEA on the upscaled resumption of copper and gold production at Green Bay was delivered on 25 August 2026. Two scenarios were presented, being a 1.8Mtpa (4,800tpd) case and a 4.6Mtpa (12,500tpd) case. Both cases delivered outstanding economics, with the 1.8Mtpa base case showing an NPV7% greater than $A2.0B, an IRR exceeding 40% and payback less than 2 years (see ASX announcement dated 25 August 2026 for details).

Detailed engineering and costing work is underway to deliver a Feasibility Study on the base case towards the end of Q1 2027.

Project Development

Following the release of the PEA and subsequent capital raising, the Company has accelerated early works and project development. The Province of Newfoundland and Labrador has approved selective pre-construction early works. Work underway includes selective clearing and emplacement of a construction camp. Upgrades to the electrical systems and waste water treatment plant are in progress. Select long-lead time items will be ordered before the end of the year to ensure that the Company can meet timelines to first production. FireFly aims to commence formal construction around July 2027, subject to FID by the Board.

Project Financing 

FireFly has appointed BurnVoir Corporate Finance Limited as its project debt advisor and is currently undertaking a process to assess various project finance options, including potential offtake prepayment options.

Regional & Generative Exploration

Recent activity has focused on testing the many targets generated from regional geophysics and geochemical prospecting completed throughout 2025 and 2026. The results in this announcement demonstrate the potential for future regional exploration discoveries.

Drilling has been conducted on both regional greenfields targets and brownfields targets around previous operations (Main Mine), with results pending from the Tilt Cove and Nash prospects.

A maiden MRE at the Main Mine is anticipated in Q1 2027.

Three surface drill rigs will continue for the remainder of 2026.

Balance Sheet and Funding Position

FireFly is well-funded to execute its growth drilling program, economic studies and pre-construction early works activities. As at 31 July 2026, the Company has approximately A$368 million in cash and liquid investments on an unaudited basis. 

 


Figure 3: Forward work plan for the Green Bay project. Please note that all timeframes are indicative and subject to change.

This announcement has been approved for release by the Board of Directors.

Contact Information 

Steve Parsons
Managing Director
FireFly Metals Ltd
+61 8 9220 9030
Jessie Liu-Ernsting
Chief Development Officer
FireFly Metals Ltd
+1 416 572 2028
Paul Armstrong 
Media Contact
Read Corporate
+61 8 9388 1474


Figure 4. Mount Joy discovery location and regional geology, showing the Nugget Pond processing facility and the prospective volcanic sequence within the Tilt Cove–Betts Cove district. 

 


Figure 5: Cross section showing mineralisation at Mount Joy. The mineralisation is offset by an interpreted fault logged in both holes FFR26-071 and FFR26-076. Assays are pending for hole FFR26-076.

 

ABOUT FIREFLY METALS

FireFly Metals Ltd (ASX: FFM)(TSX: FFM) is an emerging copper-gold company focused on growing the high-grade Green Bay Copper-Gold Project in Newfoundland, Canada. The project is advancing towards development, with a Preliminary Economic Assessment showing the potential for a high-grade, low-cost and long-life operation with a pathway to produce 100kt of copper per annum.

The Green Bay Copper-Gold Project is underpinned by 60.2Mt of Measured and Indicated Mineral Resources at 2.43% for 1,464Kt copper equivalent (CuEq) and 23.5Mt of Inferred Mineral Resources at 2.51% for 592Kt CuEq, prepared and disclosed in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code (2012 Edition)) and Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

The Company has a clear strategy to continue growing the Green Bay Copper-Gold Project through resource expansion, new discoveries and advancement towards development.

Further information regarding FireFly Metals Ltd is available on the ASX platform (ASX: FFM), the Company’s website www.fireflymetals.com.au or SEDAR+ www.sedarplus.ca.

COMPLIANCE STATEMENTS

Mineral Resource Estimate – Green Bay Copper-Gold Project
The Mineral Resource Estimate for the Green Bay Copper-Gold Project referred to in this announcement and set out in Appendix A was first reported in the Company’s ASX announcement dated 25 August 2026, titled ‘Preliminary Economic Assessment and Mineral Resource Update’ and is also set out in the Technical Report titled ‘Green Bay Ming Mine Copper-Gold Project – NI 43-101 Technical Report & Preliminary Economic Assessment – Newfoundland and Labrador, Canada’ with an issue date of 22 September 2026 and an effective date of 14 August 2026, available on SEDAR+ at www.sedarplus.ca.

Mineral Resource Estimate – Little Deer
The Mineral Resource Estimate for Little Deer referred to in this announcement was first reported in the Company’s ASX announcement dated 29 October 2024, titled ‘Resource Increases 42% to 1.2Mt of contained metal at 2% Copper Eq’ and is also set out in the Technical Report for the Little Deer Copper Project, titled ‘Technical Report and Updated Mineral Resource Estimate of the Little Deer Complex Copper Deposits, Newfoundland, Canada’ with an effective date of 26 June 2024, available on SEDAR+ at www.sedarplus.ca.

Metal Equivalents for Mineral Resource Estimates
Metal equivalents for the Mineral Resource Estimates have been calculated at a copper price of US$10,626/t, gold price of US$3,587/oz and silver price of US$50.22/oz. Individual Mineral Resource grades for the metals are set out in Appendix A of this announcement.

Metallurgical factors have been applied to the metal equivalent calculation. Copper recovery used was 95%. Historical production at the Ming Mine has a documented copper recovery of ~96%. Precious metal (gold and silver) metallurgical recovery was assumed at 85% based on historical recoveries achieved at the Ming Mine in addition to historical metallurgical test work to increase precious metal recoveries.

In the opinion of the Company, all elements included in the metal equivalent calculation have a reasonable potential to be recovered and sold based on current market conditions, metallurgical test work, the Company’s operational experience and, where relevant, historical performance achieved at the Green Bay project whilst in operation.

Copper equivalents for the Mineral Resource Estimates were calculated based on the formula:

CuEq(%) = Cu(%) + (Au(g/t) x 0.97106) + (Ag(g/t) x 0.01360).

Metal Equivalents for Exploration Results
Metal equivalents for Exploration Results announced in this announcement have been calculated at a copper price of US$11,000/t, gold price of US$3,600/oz, silver price of US$35/oz and zinc price of US$2,700/t. These prices are the CITI consensus long term metal prices as at 28 September 2026. Individual grades for the metals are set out in Appendix B of this announcement.

Metallurgical factors have been applied to the metal equivalent calculation. Copper recovery used was 95%. Historical production at the Ming Mine has a documented copper recovery of ~96%. Precious metal (gold and silver) metallurgical recovery was assumed at 85% based on historical recoveries achieved at the Ming Mine in addition to metallurgical test work to increase recoveries completed by FireFly. Zinc recovery is applied at 50% based on historical processing and potential upgrades to the mineral processing facility.

In the opinion of the Company, all elements included in the metal equivalent calculation have a reasonable potential to be recovered and sold based on current market conditions, metallurgical test work, the Company’s operational experience and, where relevant, historical performance achieved at the Green Bay project whilst in operation.

Copper equivalents for the Exploration Results were calculated based on the formula:

CuEq(%) = Cu(%) + (Au(g/t) x 0.94145) + (Ag(g/t) x 0.00915) + (Zn(%) x 0.12919)

Exploration Results
Previously reported exploration results referred to in this announcement were first reported by the Company in accordance with ASX Listing Rule 5.7 in the ASX announcements cross-referenced in this announcement.

Production Targets 
The production targets referred to in this announcement were first reported by the Company on 25 August 2026. Firefly confirms that all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed.

Original Announcements
FireFly confirms that it is not aware of any new information or data that materially affects the information included in the original announcements referred to or cross-referenced in this announcement and that, in the case of Mineral Resource Estimates, all material assumptions and technical parameters underpinning the estimates in the original announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ and Qualified Persons’ findings are presented have not been materially modified from the original market announcements.

Mineral Resource Estimates and Exploration Results
Mineral Resource Estimates and Exploration Results are calculated in accordance with the JORC Code (2012 Edition) and NI 43-101.

Competent and Qualified Person Statements
The information in this announcement that relates to new Exploration Results is based on and fairly represents information compiled by Mr Darren Cooke, a Competent Person who is a member of the Australian Institute of Geoscientists. Mr Cooke is a full-time employee of, and holds securities in, the Company. Mr Cooke has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code (2012 Edition). Mr Cooke has reviewed this announcement and consents to the inclusion in this announcement of the matters based on his information in the form and context in which they appear.

All technical and scientific information in this announcement has been reviewed and approved by Group Chief Geologist, Mr Juan Gutierrez BSc, Geology (Masters), Geostatistics (Postgraduate Diploma), who is a Member and Chartered Professional of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Gutierrez is a Competent Person as defined in the JORC Code (2012 Edition) and a Qualified Person as defined in NI 43-101. Mr Gutierrez is a full-time employee of, and holds securities in, the Company. Mr Gutierrez has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code (2012 Edition) and a Qualified Person as defined in NI 43-101. Mr Gutierrez has reviewed this announcement and consents to the inclusion in this announcement of the matters based on his information in the form and context in which they appear.

APPENDIX A

Green Bay Copper-Gold Project Mineral Resources

Ming Deposit Mineral Resource Estimate

MING DEPOSIT TONNES COPPER GOLD SILVER CuEq
(Mt) Grade Metal Grade Metal Grade Metal Grade
  (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)
Measured 3.5 1.5 52 0.2 20 1.3 147 1.67
Indicated 53.8 1.9 1,041 0.5 878 4.5 7,707 2.49
TOTAL M&I 57.3 1.9 1,093 0.5 899 4.3 7,853 2.44
Inferred  17.3 2.0 344 0.7 404 6.3 3,522 2.77

 

Little Deer Mineral Resource Estimate

LITTLE DEER TONNES COPPER GOLD SILVER CuEq
(Mt) Grade Metal Grade Metal Grade Metal Grade
  (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)
Measured – – – – – – – –
Indicated 2.9 2.1 62 0.1 9 3.4 320 2.3
TOTAL M&I 2.9 2.1 62 0.1 9 3.4 320 2.3
Inferred  6.2 1.8 110 0.1 10 2.2 430 1.8

 

GREEN BAY TOTAL MINERAL RESOURCE ESTIMATE

GREEN BAY TONNES COPPER GOLD SILVER CuEq
TOTAL MRE (Mt) Grade Metal Grade Metal Grade Metal Grade
  (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)
Measured 3.5 1.5 52 0.2 20 1.3 147 1.67
Indicated 56.7 1.9 1,103 0.5 887 4.4 8,027 2.48
TOTAL M&I 60.2 1.9 1,155 0.5 908 4.2 8,173 2.43
Inferred  23.5 1.9 454 0.6 414 5.2 3,952 2.51
  1. FireFly Metals Ltd Mineral Resource Estimates for the Green Bay Copper-Gold Project, incorporating the Ming Deposit and Little Deer Complex, are prepared and reported in accordance with the JORC Code (2012 Edition) and NI 43-101.
  2. Mineral Resources have been reported at a 1.0% copper cut-off grade.
  3. Metal equivalents for the Mineral Resource Estimates have been calculated at a copper price of US$10,626/t, gold price of US$3,587/oz and silver price of US$50.22/oz. Metallurgical recoveries have been set at 95% for copper and 85% for both gold and silver. These assumptions are made on the basis of historical production at the Ming Mine and additional metallurgical test work. Copper equivalent was calculated based on the formula: CuEq(%) = Cu(%) + (Au(g/t) x 0.97106) + (Ag(g/t) x 0.01360).
  4. Totals may vary due to rounding.

 

APPENDIX B – Significant Intersection Table 

Collar co-ordinates and orientation are listed in the UTM grid, NAD83 Zone 21. Significant intersections reported are those above a 0.5% copper cut-off or 0.5g/t gold and contain a maximum of 6 metres of internal waste. Please refer to the Compliance Statements for further details on parameters used in the copper equivalent calculation. All results are approximate true thickness.

Hole No. Easting Northing Elevation Azimuth Dip Drilled Length   From To Width Assay CuEq
(m) (m) (m) (m) Cu % Au g/t Ag g/t Zn % %
FFR26-064 587303.5 5519669.9 90.1 216 -52 302 15.55 22.00 6.5 0.8 1.2 2.7 0.57 2.0
inc. 15.55 20.00 4.5 1.1 1.4 3.6 0.75 2.6
75.95 77.15 1. 2 0 .4 0.7 1.1 0.05 1.1
FFR26-065 587412.0 5519654.3 114.6 214 -51 294 Assays Pending
FFR26-067 587101.8 5520100.2 134.1 230 -47 143 Assays Pending
FFR26-069 587560.5 5520828.1 129.5 345 -67 189 Assays Pending
FFR26-071 587388.8 5519583.0 112.6 280 -45 295 109.00 131.50 22.5 1. 9 0 .6 1. 8 0 .38 2.5
Inc. 112.00 121.00 9.0 2.9 1.0 3.1 0.35 3.9
155.00 156.50 1.5 1.0 0.1 0.1 0.03 1.1
FFR26-074 587418.0 5519644.0 117.5 274 -52 221 Assays Pending
FFR26-076 587419.0 5519643.0 117.5 249 -52 480 Assays Pending

 

Visual Sulphide Estimate – Hole FFR26-076 

Estimated sulphide from geological logging of diamond drill core.

Hole ID From (m) To (m) Lithology Total Sulphide %
FFR26_076 230.85 239.9 Pyrite-rich basalt 10
FFR26_076 239.9 242.45 Pyrite-rich basalt 10
FFR26_076 242.45 246.1 Massive sulphide 80
FFR26_076 246.1 254.9 Pyrite-rich basalt 10
FFR26_076 254.9 255.55 Massive sulphide 90
FFR26_076 255.55 274.85 Semi-massive sulphide 15
FFR26_076 274.85 275.3 Massive sulphide 100
FFR26_076 275.3 285.65 Pyrite-rich basalt 15

Cautionary statement on visual estimates: References in this announcement to visual estimates of sulphide mineralisation abundance should not be considered a proxy or substitute for laboratory analyses. Laboratory assays are required to determine the widths and grades of the visible mineralisation reported from preliminary geological logging. Visual estimates of mineral abundance also provide no information regarding impurities or deleterious physical properties relevant to valuations. While the Company makes every effort to identify mineralisation accurately, the identification of mineralisation by visual means is inherently uncertain, and there is a risk that the mineralisation identified may be incorrectly identified, including as to its type, extent or presence altogether. The Company expects to receive the laboratory analytical results of sampling in 4 weeks.

 


Plan view of drilling in this announcement

Posted October 27, 2026

Share this news article

MORE or "UNCATEGORIZED"


Kingsmen Drills 566 g/t AgEq (348 g/t Silver & 0.42 g/t Gold) Over 2.52 Meters, Including 899g/t AgEq (532 g/t Silver & 0.67g/t Gold) Over 1.25 Meters, at New Leona Zone Discovery on Soledad II, Las Coloradas

Kingsmen Resources Ltd. (TSX-V: KNG) (OTCQB: KNGRF) (FSE: TUY) is pleased to report the discovery of... READ MORE

October 27, 2026

PPX Intercepts High-Grade Gold, Silver, and Copper at Callanquitas, with 13.28 g/t Au, 5,204 g/t Ag and 5.4% Cu Over 1.0 m; and Completes the First Drill Hole at Portachuelos

PPX Mining Corp. (TSX-V:PPX) (BVL:PPX), is pleased to announce the results from underground diamond ... READ MORE

October 27, 2026

Awalé Connects Charger 1 and Charger 2 - Extending Gold Mineralization Across 300 Metres of Strike, Including 8.7 g/t Gold over 25 Metres and 7.0 g/t Gold over 28 Metres

Awalé Resources Limited (TSX-V: ARIC) (OTCQX: AWLRF) (FSE: 2F60) is pleased to announce the results... READ MORE

October 27, 2026

Goldsky Resources Drills 12.6 M @ 233.6 g/t Gold Uncut (14.2 g/t at a 50 g/t Top Cut) at Raja and 17.35 M @ 16.5 g/t Gold at Palokas - 2026 Infill Drilling Supports the Rajapalot Mineral Resource, Finland

Goldsky Resources Corp (TSX-V: GSKR) (FNSE: GSKR SDB) (OTCQX: GSKRF) (FRA: HEG0) is pleased ... READ MORE

October 27, 2026

Golden Cross Identifies Gold-Bearing Vein System at Aurora East, Intersects Gold in All Seven Aurora Holes

Golden Cross Resources (TSX-V: AUX) (OTCQB: ZCRMF) (FSE: ZMLO) has intersected gold in all seven ho... READ MORE

October 27, 2026

Copyright 2026 The Prospector News