The Prospector News

Final Winter Drill Results from the 30 Remaining Diamond Drill Holes includes: High Grade Gold Intercept at North Lake of 8.79 Grams per Tonne Gold over 3.0 Meters

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Final Winter Drill Results from the 30 Remaining Diamond Drill Holes includes: High Grade Gold Intercept at North Lake of 8.79 Grams per Tonne Gold over 3.0 Meters

 

 

 

 

 

MAS Gold Corp. (TSX-V: MAS) is delighted to announce the results from the remaining thirty drill holes from its successful 2022 winter diamond drill program in the La Ronge Gold Belt, Saskatchewan.

 

These results include twenty-two holes from the North Lake Deposit (Figure 2), four holes from the Point Deposit (Figure 3), and four holes from the Preview SW Property (Figure 4).

 

Discussion and Highlights of these 30 Winter Hole Drill Results:

 

North Lake Deposit:

 

The results from these remaining twenty-two diamond drill holes at the North Lake deposit are highlighted by high-grade mineralization in the most southern hole of 8.79 grams per tonne (g/t) gold over three meters (m) in diamond drill hole (DDH) NL22-101 (Table 1).

 

Drill hole, NL22-101, confirms the extension of the North Lake Deposit and intersected some of the highest assay results recorded at the deposit of 8.79 g/t gold over 3m and 7.00 g/t gold over 1m. Further evaluation of NL22-101 is planned to assist in developing an exploration strategy to follow up the high-grade results.

 

The systematic infill drill program successfully intersected near-surface gold mineralization, less than 50 m below surface. Infill drilling returned a substantial number of drill core intervals with results above the cut-off grade of the current North Lake Resource Model. Data from these results will be used to upgrade the North Lake deposit resource model with a focus on near surface mineralization with open pit potential. An upgraded resource on the North Lake deposit brings it one step closer towards mine development.

 

Point Deposit:

 

Results from these remaining four holes show an extension of the Point Deposit by an estimated 295m to the south as well as down dip extension of the deposit.

 

Drill hole RM22-060 (Figure 3) intersected 3.00 g/t gold over 4.9 meters, including 6.65 g/t gold over 0.8 meters 295m along strike to the south of the historic drill hole RM85-019 in the Point Deposit. Drill hole RM22-060 is a notable discovery and confirms the potential to significantly expand the Point Deposit.

 

Drill hole RM22-057 successfully extended down dip mineralization at Point Deposit. Multiple mineralized zones were intersected highlighted by 8.60 g/t gold over 2m including 14.50 g/t gold over 1m.

 

Preview SW Deposit

 

The Preview SW Deposit is comprised of multiple sub-parallel high-grade lens hosted in a dioritic intrusion. The results are highlighted by drill hole PR22-188 (Figure 4) which was successful in intersecting multiple mineralized zones at depth highlighted by 13.40 g/t gold over 1.55m, 8.85 g/t gold over 0.7m and 9.47 g/t gold over 1.00m.

 

Adit (North) Zone:

 

The Adit Zone (also known as the North Zone) continues to intersect mineralization along strike. The Adit Zone intersects multiple mineralized intervals highlighted in drill hole PR22-190A (Figure 4), including 6.55 g/t gold over 1.1m and 1.44 g/t gold over 4.2m.  Further drilling is warranted to determine the full extent of mineralization. Continuing exploration will determine the viability of encompassing Adit Zone into the Company’s hub and spoke model.

 

Management Comments:

 

“We are extremely excited by the positive results we have received from our winter drill program,” commented Darren Slugoski, MAS Gold’s Chief Geologist. He continued, “Drill hole NL22-101 intersected on our North Lake deposit confirms a southern extension of the deposit as well as an additional potential high-grade zone. The results from the Point deposit demonstrates a strong potential for a significant upside with 295m of untested ground between the southern edge of the Point deposit and drill hole RM22-060. The Preview SW Deposit continues to be an integral spoke demonstrated by the gold grades intersected in PR22-188.

 

Results from these thirty holes in the Winter Program at North Lake Deposit, Point Deposit and Preview SW Property have exceeded our team’s expectations as they help sling-shot MAS into further developing the Hub and Spoke Model.”

 

Jim Engdahl, MAS Gold’s Chief Executive Officer commented: “The winter drill results together with the acquisitions of the Preview SW Deposit and Contact Lake Mine allows MAS Gold to move towards restarting the PEA (Prefeasibility Economic Study) in 2023. Our North Lake Deposit continues to demonstrate feasibility of being the hub in MAS Gold’s Hub and Spoke model along with the Preview SW deposit and the Contact Lake Mine being the primary spokes. Management is extremely pleased with this latest round of thirty diamond drilling results.”

 

MAS Gold plans to provide a summary by late next week of the entire Winter Drill program as well as an overview of our plans moving forward to increase our resource and develop the Hub and Spoke Model to create value for MAS Gold and its shareholders.

 

Summer Exploration Update:

 

The Company recently concluded a channel sampling program at its North Lake Deposit, which was successful in identifying and sampling the felsite unit up to five hundred meters along strike to the northeast of the North Lake Deposit. The felsite is known to host the North Lake Deposit which includes an Inferred Mineral Resource of 18,100,000 t grading 0.85 g/t Au, representing 494,000 contained ounces of gold. Channel samples were taken across the width of the felsite where exposed. Visual inspections of the samples identified multiple intervals with increased sheeted quartz veins as well as albite alteration at North Lake. A number of gold deposits around the world are genetically related to albite-rich igneous rocks.

 

Sample Quality Assurance / Quality Control

 

Working with its principal geological exploration consultant, Axiom Exploration, MAS Gold designed and executed a vigorous quality control/quality assurance program for its 2022 winter drill program.

 

Sample intervals were laid out with the objective of capturing homogenous lithology and not cross any significant alterations with the sample guideline of a minimum samples size of 0.50 m and a maximum sample size of 2.0 m.

 

Samples were marked on core with assigned sample number from a pre-numbered sample tag. These markings and stapled sample tags were placed at the start of the intervals. Drill core was cut using a core saw with a diamond bit blade using fresh flowed water to ensure no contamination between samples. Care was taken to ensure that the same half of the core was sampled for the entire sample interval to maintain consistency and no biases in the assay results.

 

MAS Gold utilized Saskatchewan Research Council (SRC) Geoanalytical laboratories in Saskatoon. All rock sample preparation conducted by SRC at their preparation facility in Saskatoon, SK. Rock samples were dried, crushed to 70% passing 1.70 mm. A 250-gram sample is then riffle split and pulverized to 95% passing 106 microns. The pulveriser was cleaned using a silica sand wash after every samples as to avoid any potential contamination.

 

Core analyzed by SRC was handled at their facility in Saskatoon, SK.  Core samples were analyzed for gold using FA/AA of 30g as well as multi-element ICP-MS with a four-acid digestion. Gold assays returning greater than 3 g/t (ppm) where analyzed using gold fire assay with gravimetric finish. Reject pulps are saved and stored for potential, future metallic screening, or other analyses.

 

An independent QAQC program was conducted by inserting pulp duplicates, certified reference materials, coarse and pulp blanks. This was used to test for natural variability, sampling bias & testing the lab for homogeneity during sample preparation processes within the lab as well as testing the precision and any possible contamination from the lab.  Additionally, SRC labs also includes an internal QAQC duplicate on gold analyses.

 

Qualified Person

 

The scientific and technical information contained in this news release has been prepared, reviewed, and approved by Darren Slugoski, P.Geo. (Saskatchewan and Ontario), of Axiom Exploration Group Ltd., as well as being the Chief Geologist of MAS Gold, a Qualified Person within the context of Canadian Securities Administrators’ National Instrument 43-101; Standards of Disclosure for Mineral Projects (NI 43-101).

 

About MAS Gold Corp.

 

MAS Gold Corp. is a Canadian mineral exploration company focused on advancing its gold exploration projects in the prospective La Ronge Gold Belt of Saskatchewan. MAS Gold operates six properties in the belt, including the Preview-North, Greywacke Lake, Preview SW, Contact Lake, Elizabeth Lake, and Henry Lake Properties totalling 35,175.6 hectares (86,920.8 acres). These properties extend along the geologically prospective La Ronge, Kisseynew and Glennie Domains that make up the La Ronge Gold Belt in north-central Saskatchewan.

 

MAS Gold currently has five advanced deposits including the North Lake, Greywacke North, Preview SW, Bakos (Contact Lake) and Point gold deposits.

 

The North Lake deposit hosts an Inferred Mineral Resource of 18,100,000 t grading 0.85 g/t Au, hence 494,000 contained ounces of gold (Godden, S, Thomas, D. Tupper, D. Technical Report on the Mineral Resource Updates, North Lake and Greywacke North Gold Projects, La Ronge Gold Belt, Saskatchewan, Canada.; effective date December 1, 2021). The Technical Report about the updated Mineral Resource estimate was filed on SEDAR January 12, 2022.

 

The Greywacke North deposit has a combined open pit and underground Indicated Mineral Resource of 645,000 t averaging 4.90 g/t Au for 101,000 insitu ounces of gold (600,000 t at 4.89 g/t Au, and 45,000t at 5.03 g/t Au, respectively), plus a combined open pit and underground Inferred Mineral Resource of 410,000 t averaging 4.12 g/t Au for 55,000 insitu ounces of gold (35,000 t at 1.97 g/t Au, and 375,000 t at 4.33 g/t Au, respectively).  The Indicated and Inferred Mineral Resources were estimated using open pit and underground cut-off grades of 0.65 g/t Au and 1.75 g/t Au, respectively (Godden, S, Thomas, D. Tupper, D. Technical Report on the Mineral Resource Updates, North Lake and Greywacke North Gold Projects, La Ronge Gold Belt, Saskatchewan, Canada.; effective date December 1, 2021). The Technical Report regarding the updated Mineral Resource estimate was filed on SEDAR January 12, 2022.

 

The Preview SW deposit hosts a historical Indicated Mineral Resource containing 158,300 ounces of gold (2.61 million tonnes grading 1.89 g/t Au) and a historical Inferred Mineral Resource containing 270,800 ounces of gold (5.70 million tonnes grading 1.48 g/t Au), both based on a 0.50 g/t Au cut-off grade (Simpson, R. Technical Report, Preview SW Gold Project, La Ronge, Saskatchewan; effective date September 27, 2016).  The Technical Report on the Mineral Resource estimate was filed on SEDAR September 27, 2016, for Comstock Metals Ltd. (TSXV: CSL).

 

 


Figure 1: MAS Gold Corp. Holdings (CNW Group/MAS Gold Corp)

 

 


Figure 2 – North Lake Collar Locations (CNW Group/MAS Gold Corp)

 

 


Figure 3 – The Point Deposit Drill Hole Locations (CNW Group/MAS Gold Corp)

 

 


Figure 4 – The Preview SW and Adit Zone Drill Hole Locations (CNW Group/MAS Gold Corp)

 

 


Table 1: North Lake Assay Final Results (CNW Group/MAS Gold Corp)

 

 


Table 2: Point Deposit Final Assay Results (CNW Group/MAS Gold Corp)

 

 


Table 3: Preview SW and Adit Zone Final Assay Results (CNW Group/MAS Gold Corp)

 

Posted August 9, 2022

Share this news article

MORE or "UNCATEGORIZED"


Critical Metals Corp Achieves Breakthrough Tanbreez Heavy Rare Earth Results: >99% Dissolution of Eudialyte Concentrate Into 19 Ultra-High-Purity Rare Earth Products; Refinery Study Projects US$1.8–2.2b in Annual Refinery Revenue

Critical Metals Corp. (Nasdaq: CRML) a leading critical minerals ... READ MORE

September 16, 2026

Metalsource Mining Extends High Grade Mineralization at Depth as Silver Hill Exploration Enters Major Expansion Phase

Holes SH26-22 and SH26-23 return up to 930 g/t AgEq within broade... READ MORE

September 16, 2026

Pasinex Completes Sale of High-Grade Zinc Sulphide Material and Provides Pinargozu Operations Update

Pasinex Resources Limited (CSE: PSE) (FSE: PNX) a growing zinc-fo... READ MORE

September 16, 2026

Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) is pleased to... READ MORE

September 16, 2026

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) has received results from the last four holes of a ten-hole, 1,996 metre summer drilling program in the Zavitz gold zone at the Company's 100% owned Moray gold project. In total, New Break has completed 5,372 metres of drilling in 32 drillholes in 2026. Moray is located 49 km southeast of Timmins, Ontario and 32 km northwest of the Young-Davidson gold mine operated by Alamos Gold Inc. Select results from the final four of ten holes drilled in the summer drilling program are presented below in Table 1, while drillhole collar locations are detailed in Table 2 in Appendix A. Table 1 – Moray Summer 2026 Final Drill Results Hole ID Length (m) From (m) To (m) Width (1) (m) Au Grade (2) (g/t) NBR-26-29 322.0 77.3 78.8 1.5 0.42 and 138.0 139.1 1.1 0.38 and 162.5 173.3 10.8 (3) 1.61 and 227.4 229.0 1.6 1.21 and 231.5 232.1 0.6 1.72 NBR-26-30 250.0 37.0 38.0 1.0 0.30 and 102.8 103.5 0.7 0.60 and 121.5 122.5 1.0 0.36 and 124.5 125.5 1.0 0.33 and 128.5 129.0 0.5 0.90 and 131.0 132.0 1.0 0.36 and 169.8 174.0 4.2 2.65 and 178.0 179.5 1.5 0.77 and 183.5 186.6 3.1 1.22 and 190.0 190.5 0.5 1.06 and 191.5 192.5 1.0 1.48 and 196.0 200.5 4.5 2.53 and 203.5 204.0 0.5 2.15 and 206.5 212.0 5.5 1.57 NBR-26-31 274.0 169.0 170.5 1.5 0.37 and 184.5 186.0 1.5 0.51 and 197.0 200.0 3.0 0.94 and 201.5 202.0 0.5 0.50 and 203.5 210.0 6.5 (3) 3.12 NBR-26-32 352.0 73.5 74.0 0.5 0.44 and 174.0 174.6 0.6 0.52 and 194.0 195.0 1.0 0.66 and 199.8 203.3 3.5 2.29 and 227.3 228.0 0.7 0.97 (1) Intervals are drill intersections and do not necessarily represent true widths. (2) All intervals are presented using a cut-off grade of 0.3 g/t Au and internal dilution of no more than 1.0 metres at grades less than 0.3 g/t Au and assays are not capped (see QA/QC Procedures). (3) Drill core photos shown in Appendix B. Figure 1 – Newly Reported Drillholes NBR-26-29, 30 Figure 2 – Newly Reported Drillholes NBR-26-30, 31, 32 Note: The bottom of NBR-26-30 deviated southeast and is represented in both sections. Figure 1: Section B-B1 incorporates drillholes NBR-26-06, 07, 08, 25, 26, 27, 28, 29 and part of 30. Gold mineralization extends southeast into the syenite as exhibited in NBR-26-29. NBR-26-30 is identified in both sections A-A1 and B-B1 as the drillhole was collared along section A-A1 but deviated southeast, intersecting gold mineralization in the mafic volcanics in section B-B1. Figure 2: A-A1 incorporates drillholes NBR-26-03, 04, 05, 23, 24, 30, 31 and 32. NBR-26-31 exhibits gold mineralization both within the syenite (at the contact) and within a "flow breccia" within the hematite altered mafic volcanic at the contact. NBR-26-32 is typified by blocky faulted ground with lamprophyre dykes and gold mineralization in the hematite altered mafic volcanics in a brecciated quartz vein with angular syenitic fragments. William Love, Chief Executive Officer of New Break commented, "Ongoing drilling this summer in the Zavitz gold zone continues to deliver significant gold values, with gold mineralization intercepted in every drillhole. As depicted in Figures 1 and 2, gold mineralization has been encountered predominantly within the mafic volcanics. Importantly, drillholes NR-26-29 and NR-26-32, the deepest drilled to date, demonstrate that gold mineralization extends into the syenite to the southeast at the contact with the mafic volcanics." He further noted, "The intrusive-mafic volcanic contact in the Zavitz gold zone has a distinctive magnetic high. This could be reflective of the higher proportion of iron in these mafic volcanics, which is associated with the higher gold values. This same magnetic and IP signature has been identified elsewhere in areas also believed to be along the intrusive-mafic volcanic contact. Drilling these never before tested targets with the goal of identifying gold mineralization similar to that encountered in the Zavitz zone represents the potential for significantly expanding the Moray gold discovery. There is also the belief that the Zavitz zone could represent the first of a series of stacked mineralized gold zones, which would point to the potential for a much larger gold system at depth. We plan to test this through deeper drilling directly into the Zavitz zone." About the Moray Gold Project The Moray property is located in the heart of the Ontario Abitibi greenstone belt, 49 km southeast of Timmins surrounded by a number of significant gold producing companies and existing mills (see Figure 3). The Young-Davidson gold mine operated by Alamos Gold Inc., with its 8,000 tonne per day mill is the closest and within a short trucking distance of approximately 45 km by road from Moray. The understanding of gold mineralization at Moray continues to evolve with each round of drilling. The occurrence of gold mineralization extending into the syenite to the southeast of the Zavitz zone and in the deepest drillholes is noteworthy given the presence of syenite-hosted mineralization at Young-Davidison. More recent examination of the drill core also suggests that the gold mineralization discovered to date may resemble an intrusion related style of deposit like Agnico Eagle's Upper Beaver gold deposit east of Kirkland Lake, as opposed to a structurally hosted gold system. Both Young-Davidson and Upper Beaver host multi-million ounce gold deposits. Figure 3 – Moray Location Map: Surrounding Gold Producers and Upper Beaver Gold Project Technical Content and Qualified Person The scientific and technical information contained in this news release has been reviewed and approved by Peter C. Hubacheck, P. Geo, consulting geologist to New Break, and an independent Qualified Person as defined by National Instrument 43-101. Mr. Hubacheck certifies that this news release fairly and accurately reflects the technical information and data presented. New Break conducts its exploration activities in accordance with CIM Best Practices Guidelines. QA/QC Procedures QA/QC procedures were executed to ensure all work is conducted in accordance with best practices. All drill core was sawn in half with one half of the core prepared for shipment and the other half retained for future verification. All core is under watch from the drill site to the core processing facility. Drill core is BQTK size and sample intervals range from 0.5 metres to 1.0 metres in length. Commercially prepared certified reference material ("CRM") standards and blanks were inserted with each shipment at a rate of 1 QAQC sample in every 12 core samples. Samples from New Break's 2026 Moray drilling program were analyzed at Activation Laboratories in Timmins, Ontario, which is ISO 17025 certified, by 30-gram fire assay with atomic absorption finish. Any sample assaying greater than 10.0 g/t Au was re-assayed with fire assay gravimetric analysis. Grade composite intervals over core lengths are calculated using a weighted average grade with a cut-off grade of 0.3 g/t Au. Up to 1.0 m of internal dilution (consecutive interval below cut-off grade) are included within specific geologic domains and alteration assemblages, except as otherwise noted. The composites are constrained geologically by metasomatic alteration processes sourcing from the Fiset syenite intrusion and contact mafic volcanic rocks. Elevated gold values are coincident with hematite, silica, sericite and pyrite mineralization within structurally prepared brecciated corridors flanking the intrusion. Intervals are not true widths and no top cutting has been applied to the higher gold values. About New Break Resources Ltd. New Break is a Canadian mineral exploration company focused on its Moray gold project located 49 km southeast of Timmins, Ontario, in a well-established mining camp within proximity to existing infrastructure, and 32 km northwest of the Young-Davidson gold mine, operated by Alamos Gold Inc. Shareholders are also leveraged to exploration success in Nunavut, Canada, through New Break's 20% carried interest in the Sundog gold project and ownership of 6.0 million shares of Guardian Exploration Inc. (TSXV: GX). The Company is supported by a highly experienced team of mining professionals. Appendix A – Drillhole Data and Locations Table 2 – Moray Summer 2026 Drillhole Collar Locations Hole ID Length (m) UTM Easting UTM Northing UTM Elevation Azimuth (degrees) Dip (degrees) NBR-26-29 322.0 492703 5320285 363 220 -70 NBR-26-30 250.0 492708 5320329 363 220 -47 NBR-26-31 274.0 492708 5320329 363 220 -60 NBR-26-32 352.0 492708 5320329 363 220 -70 Total 1,198.0 Coordinates are reported in UTM Zone 17 North, with units in metres. Figure 4 – Zavitz Gold Zone – Surface Traces of 2025 and 2026 Drillholes. All of the drilling at Moray has been completed by Enviro North Exploration Inc. out of Sturgeon Falls, Ontario. Drilling in the Zavitz gold zone is shown in figure 4, with the 1,996 metres in 10 holes drilled this summer depicted in red, the 2,807 metres in 20 holes drilled from January to April 2026 shown in blue and the 1,817 metres in 8 holes drilled in 2025 shown in black. In total, 6,620 metres in 38 drillholes have been completed in the Zavitz gold zone, while New Break has completed a total of 5,372 metres in 32 drillholes of our planned 2026, 10,000 metre drilling program. Appendix B – Drill Core Photos From NBR-26-29 and NBR-26-31

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) ha... READ MORE

September 16, 2026

Copyright 2026 The Prospector News