The Prospector News

Equity Reports Initial 2024 Drill Results from the George Lake Target at the Silver Queen Project, BC and includes 8.8 metres (est TT) of 324g/t AgEq with 1.2 metres (est TT) of 1189g/t AgEq in Hole SQ23-105

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Equity Reports Initial 2024 Drill Results from the George Lake Target at the Silver Queen Project, BC and includes 8.8 metres (est TT) of 324g/t AgEq with 1.2 metres (est TT) of 1189g/t AgEq in Hole SQ23-105

 

 

 

 

 

Equity Metals Corporation (TSX-V: EQTY) reports assays from the first five holes on the George Lake target, which were completed as part of the Company’s 2024 exploration program on its 100% owned Silver Queen Au-Ag project, British Columbia. Drilling commenced in early May and is on-going. Twenty core holes totalling 7553 metres have now been completed, and drilling has tested a 550-metre strike length of the George Lake structure to depths of up to 400 metres below surface.

 

The initial assay results from the 2024 drill program returned multiple intercepts of strongly enriched precious and base metals, including:

  • A 1.2 metre (est. TT) interval grading 2.0g/t Au, 173g/t Ag, 0.1% Cu, 4.2% Pb and 12.9% Zn (16.0g/t AuEq or 1189g/t AgEq) within an 8.8 metre (est. TT) interval averaging 0.9g/t Au, 87g/t Ag, 0.1% Cu, 1.5% Pb and 2.0% Zn (4.4g/t AuEq or 324g/t AgEq) in drillhole SQ23-105; beneath
  • A 1.6 metre (est. TT) interval grading 3.7g/t Au, 272g/t Ag, 0.2% Cu, 3.4% Pb and 2.2% Zn (10.8g/t AuEq or 802g/t AgEq) within a 9.1 metre (est TT) interval grading 1.9g/t Au, 81g/t Ag, 0.1% Cu, 1.3% Pb and 0.9% Zn (4.3 AuEq or 321g/t AgEq) alsoin drillhole SQ23-105,and
  • A 2.7 metre (est. TT) interval averaging 1.6g/t Au, 48g/t Ag, 0.6% Pb and 1.3% Zn (3.6g/t AuEq or 265g/t AgEq) in drillholeSQ23-107.

 

The highlights confirm the lateral projection of mineralization in the George Lake structure and further builds continuity both up-dip and down-dip of Equity’s 2023 drill holes. Previously announced mineralization encountered in 2023 includes 3.0m (est. TT) averaging 394g/t AgEq from drill hole SQ24-093 and 3.3m (est. TT) averaging 333g/t AgEq from drill hole SQ24-094 (see NR-17-23, dated November 28, 2023).

 

Drill hole SQ24-105 returned the thickest intervals of mineralization identified from the George Lake structure to date, which remains open to depth. Drill hole SQ24-106 (see long section attached as Figure 2) successfully tested the target vein up-dip of the SQ23-93 intercept and remains open to surface (approximately 150 metres). Additional narrower veins were intersected in each of the five holes suggesting the potential, with further drilling, for the development of hangingwall/footwall zones to, or splays from, the main vein; these include: 0.2m (est. TT) grading 1282g/t AgEq from drill hole SQ24-108 and 0.7m (est. TT) averaging 418g/t AgEq from SQ24-109.

 

Note: Silver and gold equivalencies were calculated using estimated relative process recoveries and prices between the component metals as identified in Table 1.

 

These results help confirm the lateral projection of mineralization in the George Lake structure and the persistence of the target vein to depth. Additional assay results are pending and are expected to further extend the projection of mineralization and continue to test the George Lake structure to depths of up to 400 metres below surface.

 

VP Exploration Rob Macdonald commented: “The intercepts from drill hole SQ24-105 represent two of the thickest mineralized intervals identified to date along the George Lake vein zone and form the basis for a potentially productive mineralized zone adjacent to existing underground development. Mineralization remains open in several directions and further exploration drilling is planned as part of this current and subsequent drill campaigns.”

 

Exploration in the Summer ’24 program will now shift to test further extensions of the Camp Deposit and drill testing of the Camp North target, which was identified in 2024 as a strongly anomalous polymetallic 1 km 2 soil anomaly located to the north along strike of the main Camp Deposit.

 

 

 

 

Figure 1: Plan of Silver Queen project area

 

 

 

 

 

 

Figure 2: Long-section of the George Lake Target, looking northeast

Note: Historic Crosscut Channel Sample – Source: George Cross Newsletter, April 6, 1988. Assays are historic in nature and are provided for reference only and have not been verified by the company.

 

About Silver Queen Project

 

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and development and is located adjacent to power, roads and rail with significant mining infrastructure that was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a Hunt Brothers company). The property contains an historic decline into the No. 3 Vein and the George Lake Vein, camp infrastructure, and a maintained Tailings Facility.

 

The Silver Queen Property consists of 46 mineral claims, 17 crown grants, and two surface crown grants totalling 18,871ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins distributed over a 6 sq km area. An updated NI43-101 Mineral Resource Estimate with effective date December 1st, 2022 was detailed in a News Release issued on Jan 16, 2023, which can be found by clicking here and the full Technical Report can be found on SEDAR+ (www.sedarplus.ca/) and the Company’s website.

 

More than 20 different veins have been identified on the property, forming an extensive network of zoned Cretaceous- to Tertiary-age epithermal veins. The property remains largely under-explored.

 

Table 1: Select Currently Reported Composites from 2024 Drilling on the George Lake Target

 

 

 

 

 

 

Notes: drill core samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported. Downhole composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates into the sample stream. AuEq and AgEq were calculated using prices of $1,800/oz Au, $22/oz Ag, $3.50/lb Cu, $0.95/lb Pb and $1.30/lb Zn. AuEq and AgEq calculations utilized relative metallurgical recoveries of Au 70%, Ag 80%, Cu 80%, Pb 81% and Zn 90%.

 

About Equity Metals Corporation

 

Equity Metals Corporation is a member of the Malaspina-Manex Group. The Company owns 100% interest, with no underlying royalty, in the Silver Queen project, located along the Skeena Arch in the Omineca Mining District, British Columbia. The property hosts high-grade, precious- and base-metal veins related to a buried porphyry system, which has been only partially delineated. The Company also has a controlling JV interest (57.49%) in the Monument Diamond project, NWT, strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond mines. The Company also has royalty and working interests in other Canadian properties, which are being evaluated further to determine their value to the Company.

 

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the Silver Queen project and for the preparation of the technical information in this disclosure.

 

Posted July 17, 2024

Share this news article

MORE or "UNCATEGORIZED"


K92 Mining Announces Latest Drilling Results From Arakompa Including Confirmation of Two Significant Thick High-Grade Veins (AR1 & AR2), Southern Strike Extension and Bulk Zone Expansion

K92 Mining Inc . (TSX:KNT) (OTCQX:KNTNF) is pleased to announce its fourth set of drilling results... READ MORE

February 21, 2025

Centerra Gold Announces 2024 Year-End Mineral Reserves and Resources, Including an Initial Resource at Goldfield; Provides Exploration Update

Centerra Gold Inc. (TSX: CG) (NYSE: CGAU) announces its 2024 year-end estimates for mineral reserves... READ MORE

February 21, 2025

Eldorado Gold Delivers Strong 2024 Full Year and Fourth Quarter Financial and Operational Results; Positive Free Cash Flow Realized in the Quarter and Full Year

Eldorado Gold Corporation (TSX: ELD) today reports the Company’s financial and operational results... READ MORE

February 21, 2025

Mandalay Resources Announces Record Financial Performance in 2024, Generating $69 Million in Free Cash Flow

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announced its financial results for the fou... READ MORE

February 21, 2025

Imperial Provides Update on Red Chris 2024 Production and Production Guidance for 2025

Imperial Metals Corporation (TSX:III) reports that 2024 metal production from Red Chris (100% basis... READ MORE

February 21, 2025

Copyright 2025 The Prospector News