The Prospector News

Endeavour Silver Continues to Intersect Positive Drill Results at the Parral Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Endeavour Silver Continues to Intersect Positive Drill Results at the Parral Project

 

 

 

 

 

Endeavour Silver Corp. (TSX: EDR) (NYSE: EXK) is pleased to report positive drill results from its ongoing drill program at its Parral project in the State of Chihuahua, Mexico. The high-grade silver results show the potential for resource expansion at depth and along strike in the El Verde and Sierra Plata Deep areas along the Veta Colorada structure. Since April of this year, the Company has drilled over 5,300 meters in 23 holes, totaling 8,100 meters year to date, with the aim to define and extend mineralized zones.

 

Considerable exploration potential remains along the 35 square kilometre land package and exploration will be on-going, with additional testing for new discoveries with surface mapping and sampling underway. This program will aid the Company’s goal to define a mineral resource large enough to support a preliminary economic assessment.

 

Highlights from Recent Drill Results

  • 199 gpt Ag, 4.68% Pb and 2.64% Zn for 428 gpt AgEq over a 3.48 m ETW, including 501 gpt Ag, 8.08% Pb and 6.50% Zn for 971 gpt AgEq over 0.27 m (VCU-78)
  • 322 gpt Ag, 5.19% Pb and 1.62% Zn for 528 gpt AgEq over a 1.67 m ETW, including 605 gpt Ag, 14.8% Pb and 3.46% Zn for 1,150 gpt AgEq over 0.53 m (VCU-80)
  • 664 gpt Ag, 1.88% Pb and 0.80% Zn for 747 gpt AgEq over a 5.56 m ETW, including 5,600 gpt Ag, 15.35% Pb and 1.75% Zn for 6,096 gpt AgEq over 0.22 m (VCU-90)
  • 242 gpt Ag, 0.48% Pb and 1.66% Zn for 317 gpt AgEq over a 5.34 m ETW, including 711 gpt Ag, 0.53% Pb and 2.13% Zn for 806 gpt AgEq over 0.52 m (VCU-96)

 

Abbreviations include: gpt: grams per tonne; Ag: silver; Pb: lead; Zn: zinc; ETW: estimated true width; m: metre; HW: hanging wall. Silver equivalents are calculated using a silver price of $22 per troy ounce, lead price of $0.90 per pound and zinc price of $1.20 per pound.

 

“In the areas of the El Verde and Sierra Plata historically mined areas, we continue to verify extensions of the mineralized zones at depth and along strike,” stated Dan Dickson, Chief Executive Officer. “The focus for the rest of the year will be to test the northern part of the project with a surface drilling program on various north to south striking structures, such as the northern extension of Veta Colorada, San Alberto and the El Cabezón systems; as well as resuming drilling of the San Patricio vein.”

 

Latest Drill Results

 

The Parral drill results are summarized in the following tables:

 

Parral – Veta Colorada El Verde (view Veta Colorada (El Verde) longitudinal section)

 

Hole Structure From To True Width Ag Pb Zn AgEq
(m) (m) (m) (gpt) (%) (%) (gpt)
VCU-78 Veta Colorada 274.20 279.45 3.48 199 4.68 2.64 428
Including 276.65 277.05 0.27 501 8.08 6.50 971
VCU-79 Hw Veta Colorada 210.95 212.45 1.32 96 0.22 0.31 114
Including 210.95 212.00 0.93 95 0.26 0.37 116
Veta Colorada 216.40 218.40 1.77 297 0.64 2.28 400
Including 217.50 218.40 0.79 337 0.77 3.27 481
VCU-80 Veta Colorada 261.00 263.20 1.67 322 5.19 1.62 528
Including 262.20 262.90 0.53 605 14.80 3.46 1,150
VCU-81 Veta Colorada 309.80 312.05 1.32 83 0.81 0.35 119
Including 310.75 311.40 0.38 188 1.16 0.59 243

 

 

Parral – Veta Colorada Sierra Plata Deep (view Veta Colorada (Sierra Plata) longitudinal section)

 

Hole Structure From To True Width Ag Pb Zn AgEq
(m) (m) (m) (gpt) (%) (%) (gpt)
VCU-83 Veta Colorada 145.85 147.35 0.93 70 4.09 3.48 315
Including 145.85 146.50 0.40 97 8.75 6.96 603
VCU-87 Hw Veta Colorada 88.35 90.05 1.26 59 0.92 4.01 234
Including 88.35 88.90 0.41 79 2.38 4.10 299
Veta Colorada 93.00 95.10 1.58 135 3.40 3.42 358
Including 93.00 93.60 0.45 141 5.89 3.96 454
VCU-88 Veta Colorada 143.75 145.40 0.90 193 7.11 5.71 606
Including 144.45 145.40 0.52 269 7.80 8.17 793
VCU-89 Veta Colorada 185.90 189.95 1.68 163 2.62 2.53 331
Including 187.85 188.40 0.23 312 3.87 4.57 591
VCU-90 Hw Veta Colorada 136.50 145.15 5.56 664 1.88 0.80 747
Including 142.85 143.20 0.22 5,600 15.35 1.75 6,096
Veta Colorada 150.00 154.70 3.05 145 0.18 0.49 168
Including 153.85 154.70 0.55 247 0.28 1.87 325
VCU-92 Veta Colorada 77.15 78.90 1.74 88 1.38 2.05 203
Including 77.15 78.00 0.85 167 2.82 4.07 398
VCU-93 Veta Colorada 245.00 248.00 1.70 122 0.86 0.74 174
Including 246.00 246.75 0.42 206 0.14 0.14 215
VCU-94 Veta Colorada 254.70 256.65 1.03 155 0.31 1.10 205
Including 254.70 256.00 0.69 172 0.39 1.32 232
VCU-95 Veta Colorada 226.35 229.55 2.04 131 2.67 2.38 295
Including 229.05 229.55 0.32 283 3.41 7.43 657
VCU-96 Veta Colorada 159.30 165.40 5.34 242 0.48 1.66 317
Including 159.30 159.90 0.52 711 0.53 2.13 806
VCU-97 Veta Colorada 206.90 209.15 1.62 247 1.58 1.44 345
Including 206.90 207.55 0.47 406 1.29 0.83 473
VCU-98 Veta Colorada 203.55 205.40 1.33 124 0.64 0.88 175
Including 204.90 205.40 0.36 146 1.26 1.14 224
VCU-99 Veta Colorada 194.30 195.70 0.97 105 0.76 0.95 162
Including 195.00 195.70 0.49 142 0.90 1.79 234
VCU-100 Veta Colorada 234.00 235.90 1.12 105 0.53 1.13 162
Including 234.45 234.90 0.26 235 1.55 3.39 405
  • Drill holes VCU-82, VCU-84, VCU-85, VCU-86 and VCU-91 returned no significant results

 

Notes to Tables

  1. Silver equivalents are calculated using the formula:
    Ag (gpt) + [Pb (%) X 2204.6 X Pb Price / Ag Price X 31.1] + [Zn (%) X 2204.6 X Zn Price / Ag Price X 31.1]
  2. Price assumptions used are: Pb $0.90, Zn $1.20 and Ag $22.00
  3. Minor amounts of gold and copper are present but are not considered economical
  4. All widths are estimated true widths
  5. No capping has been applied but high-grade intervals have been highlighted

 

Qualified Person and QA/QC

Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the Qualified Person who reviewed and approved the technical information contained in this news release. A quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay results. All samples are split at the local field office and shipped to ALS Labs, where they are dried, crushed, split and 250 gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

 

About Endeavour Silver

 

Endeavour Silver Corp. is a mid-tier precious metals mining company that operates two high-grade underground silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico, Chile and the United States to facilitate its goal of becoming a premier senior silver producer.  Our philosophy of corporate social integrity creates value for all stakeholders.

 

Posted September 8, 2022

Share this news article

MORE or "UNCATEGORIZED"


PPX Mining Announces Closing Of $1.35 Million Private Placement

PPX Mining Corp. is pleased to announce that it has closed its fu... READ MORE

April 19, 2024

Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News