The Prospector News

Ellis Martin Report – “Skyharbour Resources Signs Option Agreement with Tisdale Clean Energy” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “Skyharbour Resources Signs Option Agreement with Tisdale Clean Energy” (Audio)

 

 

 

https://youtu.be/MT3YQADk2Fo

 

 

Join Ellis Martin for a conversation with Jordan Trimble, the President and Chief Executive Officer of Skyharbour Resources (TSX-V:SYH) (OTCQB:SYHBF) a preeminent uranium and thorium exploration Company with projects located in the prolific Athabasca Basin of Saskatchewan, Canada. In this segment Mr. Trimble reviews the macroeconomics of the current uranium market and the company’s latest partner project news.

 

Skyharbour Resources Ltd.’s is pleased to announce that it has entered into an option agreement dated October 19th, 2022, with Tisdale Clean Energy Corp. which provides Tisdale with an earn-in option to acquire an initial 51% interest and up to a 75% interest in the South Falcon East Property located in the Athabasca Basin in Northern Saskatchewan.

 

The Property consists of a series of mineral claims totaling 12,464 hectares and is a portion of the Company’s existing South Falcon Point Project. Skyharbour will retain a minority interest in the Property assuming the earn-in is completed as well as a 100% interest in the remaining and adjacent 32,006 hectare South Falcon Point Project.nd its management team as they advance the South Falcon East Project over the coming years with a substantial amount of exploration planned and significant cash and share payments to Skyharbour.

 

Assuming the option earn-in is completed, Skyharbour will retain a minority interest in the project as well as an NSR while maintaining a 100% interest in the surrounding claims. News will be forthcoming on exploration plans at the Property and will complement our aggressive drill campaign forthcoming at Russell Lake as well as those at various other partner-funded projects in our portfolio.”

 

Courtesy of the Ellis Martin Report

Posted October 23, 2022

Share this news article

MORE or "UNCATEGORIZED"


Tectonic Metals Drills 2.41 g/t Au Over 59.44 Metres, Including 11.82 g/t Au Over 10.67 Metres and 39.96 g/t Au Over 3.05 Metres at Alpha Bowl, Flat Gold Project, Alaska

Broad Gold Mineralization Starts at Surface, Returning 1.86 g/t A... READ MORE

October 15, 2026

Lithium Africa Intersects 8.0 m at 1.70% Li2O, including 4.0 m at 2.59% Li2O, Extending High-Grade Mineralization at Norrabees I

Lithium Africa Corp. (TSX-V: LAF) (FSE: 6MQ) (OTCQB: LTAFF) is pl... READ MORE

October 15, 2026

Tower Intersects 20.3 m of 3.13 g/t Au, Including 8.0 m of 7.16 g/t Au, at Rabbit North's Blue Sky Zone

Drilling also returns 134.0 m of 0.65 g/t Au in the Lower Domain;... READ MORE

October 15, 2026

Copper Road Signs Exploration Agreement with the Matachewan First Nation on the Ben Nevis Volcanic Complex Project

Copper Road Resources Inc. (TSX-V: CRD) is pleased to announce th... READ MORE

October 15, 2026

Brunswick Exploration Announces 302 Metre-Wide Spodumene-Bearing Pegmatite Interval at the Anatacau Main Project

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFUR... READ MORE

October 15, 2026

Copyright 2026 The Prospector News