The Prospector News

Ellis Martin Report – “Skyharbour Resources-High Grade Intersects at Moore Uranium Project” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “Skyharbour Resources-High Grade Intersects at Moore Uranium Project” (Audio)

 

 

 

https://youtu.be/cAXhumD0SRU

 

 

Ellis Martin Report: Skyharbour Intersects High Grade Uranium Mineralization at Maverick East Zone with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m; Listen to the Interview with Jordan Trimble -Additional Assays Pending and Drilling to Continue.

 

Join Ellis Martin for a conversation with Jordan Trimble, the President and Chief Executive Officer of Skyharbour Resources (TSX-V:SYH) (OTCQB:SYHBF) a preeminent uranium and thorium exploration Company with projects located in the prolific Athabasca Basin of Saskatchewan, Canada which was ranked as the best mining jurisdiction to work in globally by the Fraser Institute in 2017. The Company has been acquiring top tier exploration projects at attractive valuations culminating in five uranium properties totalling approx. 200,000 hectares throughout the Basin. In July 2016, Skyharbour secured an option from Denison Mines (TSX: DML) to acquire a 100% interest in the Moore Uranium Project, now the flagship project, which hosts the high grade Maverick Zone. The Company is run by a strong management and geological team who are major shareholders with extensive capital markets experience as well as focused uranium exploration expertise in the Basin. In this segment Mr. Trimble reviews some of the best high grade intersected mineralization at the Maverick East Zone of the Moore Uranium Project with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m; with more assays pending and drilling to continue.

 

Courtesy of The Ellis Martin Report

Posted September 15, 2021

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Confirms Another High Grade Intersect of 11.85% Igneous Phosphate Across 84 Metres Starting from Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

May 14, 2024

MAG Silver Reports First Quarter Financial Results

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) announces the Com... READ MORE

May 14, 2024

Troilus Announces Feasibility Study Results for the Gold-Copper Troilus Project: Outlines a Large Scale, 22-Year Open Pit Project in Tier-One Jurisdiction With USD$884.5 Million NPV(5%)

Troilus Gold Corp. (TSX: TLG) (OTCQX: CHXMF) reports results from... READ MORE

May 14, 2024

Alamos Gold Intersects Higher-Grade Mineralization within a New Zone Near Existing Infrastructure at Young-Davidson

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) reported new results from i... READ MORE

May 14, 2024

Titan Reports First Quarter 2024 Results; National Safety Recognition Award

Titan Mining Corporation (TSX: TI) announces the results for the... READ MORE

May 14, 2024

Copyright 2024 The Prospector News