The Prospector News

Cypress Begins Phase 3 Exploration at Clayton Valley Lithium Brine/Clay Project in Nevada

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cypress Begins Phase 3 Exploration at Clayton Valley Lithium Brine/Clay Project in Nevada

 

 

 

 

 

 

Cypress Development Corp. (TSX-V:CYP) (OTCBB:CYDVF) (FRANKFURT:C1Z1) is pleased to announce that the Company, in close conjunction with its project partner Pure Energy Minerals, has commenced a Phase 3 property wide surface sampling program at Cypress’ 1520 acre Clayton Valley Lithium Brine/Clay Project located in the heart of the Clayton Valley lithium exploration area of Esmeralda County, Nevada.

 

 

Cypress Clayton Valley Lithium Project, Nevada location map:
http://www.cypressdevelopmentcorp.com/i/maps/CYP-Clayton-topo-satalite-small.jpg

 

 

Cypress’ Clayton Valley Project is within a 0.5 mile of lithium brine wells belonging to the Albemarle Silver Peak Mine and the property shares its western boundary with the lithium resource area of Pure Energy’s Clayton Valley South project.

 

 

The sampling program is being carried out on a systematic grid program of 100 metre sample spacing. Cypress anticipates collecting in excess of 500 samples over the next few weeks. These additional surface samples are intended to compliment previous sampling conducted by Cypress (see news releases Feb. 22nd and May 10th) which encountered a strongly mineralized zone which averages 1350 ppm lithium on average along a 1 kilometer strike length traversing from north to south on the west portion of the property.

 

 

The intent of this Phase 3 program is to allow the Company a property wide view of lithium distribution contained in the surficial volcaniclastic, calcareous mudstone material that covers the property. This large volume of samples are being submitted for assaying with ALS Chemex in Reno Nevada, as they are collected. All samples submitted for assaying will be initially completed using a 33 element four acid ICP contained in an ME-ICP61 analytical procedure. In addition to lithium, boron assays will also be completed for the surface grid sample program.

 

 

On August 24th, Cypress optioned its flagship Clayton Valley Project to Pure Energy Minerals with Cypress remaining the operator of the project until Pure Energy earns a 51% interest. The agreement allows the Company to advance its Clayton Valley Project while working with and utilizing the geological expertise of the Pure Energy team.

 

 

Pure Energy’s South Project & Cypress’ Existing Clayton Valley Project map:
http://www.cypressdevelopmentcorp.com/i/maps/CYP_Clayton_Valley_South_Cypress_Addition.jpg

 

 

On September 8th, Cypress announced an agreement to acquire a 100% interest in a 2nd Clayton Valley lithium project. The 2,700 acre “Dean” Lithium Brine/Clay Project is located immediately adjacent to the Albemarle’s Silver Peak Mine on the west boundary, Pure Energy Minerals project on its southwest boundary and Cypress’ existing Clayton Valley Project on its southern boundary.

 

 

Dean Project and Cypress’ Clayton Valley Project, Nevada map:
http://www.cypressdevelopmentcorp.com/i/maps/CYP-Dean-Claims-2016.jpg

 

 

Cypress has already initiated a surface sampling program on the new Dean Project. Initial assay results for lithium from the abundant, green evaporite rich volcanoclastic claystone exposure on the property are pending and will help direct the Company on expanding its work program on this project in the near future.

 

About Cypress Development Corp.:

 

 

Cypress development Corp is a publicly traded lithium and zinc exploration company that continues to acquire and develop potentially viable mineral projects in the State of Nevada, U.S.A.

 

 

Cypress is very active in Clayton Valley, Nevada with its team committed to systematically exploring its properties for both a lithium-brine resource and expanding exploration relating to the potential for lithium that exists within the recently discovered non-hectorite “claystones”, that has seen recent high grade lithium assays recovered from these same “claystones”.

 

 

Cypress Development Corp. has approx. 25.6 million shares issued and outstanding.

 

 

Good educational video presentation by Pure Energy from recent Precious Metals Summit: http://www.gowebcasting.com/events/precious-metals-summit-conferences-llc/2016/09/14/pure-energy-minerals-limited/play/stream/20089

 

Posted September 27, 2016

Share this news article

MORE or "UNCATEGORIZED"


Orsu Metals Closed Two Concurrent Private Placements Raising C$1.44 Million

Orsu Metals Corporation (TSX-V:OSU) is pleased to announce it has... READ MORE

November 8, 2019

Balmoral Welcomes Strategic Investment from Mr. Eric Sprott, Closes Final Tranche of Non-Brokered Private Placement for Total Gross Proceeds of $3.5 Million

Balmoral Resources Ltd. (TSX:BAR) announces that it has closed th... READ MORE

November 8, 2019

Monument Announces Drill Program Results at Selinsing Gold Mine Pit 4

Monument Mining Limited (TSX-V: MMY) (FSE: D7Q1) is pleased to an... READ MORE

November 8, 2019

Intercontinental Gold and Metals Ltd. Reports Record Gold Exports for Q3 2019; Revenue increased by 286% to $136.0M versus $35.2M in the Q3 2018

Intercontinental Gold and Metals Ltd. (TSX-V: ICAU) (OTC: GXMLF) ... READ MORE

November 8, 2019

AMEX Announces Closing of C$8 Million Bought Deal Private Placement

Amex Exploration Inc. (TSX-V: AMX) is pleased to announce that it... READ MORE

November 8, 2019

Copyright 2019 The Prospector News - Site design by Spyderbaby Productions