Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) is pleased to announce that it has filed the National Instrument 43-101-compliant, Updated Mineral Resource Estimate Technical Report on its 100% owned flagship Cadillac Project, located in Val-d’Or (Abitibi, Quebec). Report results were previously announced in Cartier’s news release dated December 18, 2025. The updated estimate includes approximately 110,000 metres of drilling completed by Cartier from 2016 to 2024 as well as 420,000 metres drilling completed by previous mining compagnies.
The MRE was independently prepared by PLR Resources Inc. and Evomine, specialists in mineral resource estimates and project evaluations, in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, with an effective date of November 11, 2025.
The full report entitled “NI 43-101 Technical Report and Mineral Resource Estimate on the Cadillac Project, Val-d’Or, Abitibi, Quebec, Canada,” can be found on the Company’s website (https://ressourcescartier.com/) and on SEDAR+ (https://www.sedarplus.ca/home/).
Strategic & Investment Significance Highlights of the Updated Mineral Resource Estimate
Table 1: Results of the Updated Mineral Resource Estimate
| All sectors / Category | Open Pit Resources | Underground Resources | Total | ||||||
| Cut-off Grade = 0.30 g/t Au | Cut-off Grade = 1.00 g/t Au | ||||||||
| Tonnes (t) | Grade (Au g/t) | Gold (oz) | Tonnes (t) | Grade (Au g/t) | Gold (oz) | Tonnes (t) | Grade (Au g/t) | Gold (oz) | |
| Measured | 1,770,000 | 2.16 | 123,300 | 4,210,000 | 2.80 | 379,300 | 5,988,000 | 2.61 | 502,600 |
| Indicated | 1,730,000 | 1.52 | 84,500 | 2,240,000 | 2.51 | 180,600 | 3,965,000 | 2.08 | 265,200 |
| Measured & Indicated | 3,500,000 | 1.84 | 207,800 | 6,450,000 | 2.70 | 559,900 | 9,953,000 | 2.40 | 767,800 |
| Inferred | 4,740,000 | 1.13 | 172,600 | 30,450,000 | 2.29 | 2,244,200 | 35,185,000 | 2.14 | 2,416,900 |
About Cadillac Project
The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest consolidated land packages in the Val-d’Or mining camp. Cartier’s flagship asset integrates the historic Chimo Mine and East Cadillac projects, creating a dominant position in a world class gold mining district. With excellent road access, year-round infrastructure and nearby milling capacity, the project is ideally positioned for rapid advancement and value creation.
About Cartier Resources Inc.
Cartier Resources Inc., founded in 2006 and headquartered in Val-d’Or (Quebec) is a gold exploration company focused on building shareholder value through discovery and development in one of Canada’s most prolific mining camps. The Company combines strong technical expertise and a track record of successful exploration to advance its flagship Cadillac Project. Cartier’s strategy is clear: unlock the full potential of one of the largest undeveloped gold landholdings in Quebec.
For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com
In the 51 years that we have been involved in the silver market, since 1975, we have continua... READ MORE
In this episode, Michael Fox and Chris Temple of the National Investor break down the recent ... READ MORE
The Ministry of Energy and Mines highlighted that the event, to be held in June in Lima, will... READ MORE
Equity Metals Corporation (TSX-V: EQTY) announces that the following incumbent directors were... READ MORE
Playfair Mining Ltd (TSX-V: PLY) is pleased to announce the Company intends to conduct a non-brokere... READ MORE