The Prospector News

Canada Carbon Announce it Has Received Final Results From the Definition Drilling Campaign on the Miller Property

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Canada Carbon Announce it Has Received Final Results From the Definition Drilling Campaign on the Miller Property

 

 

 

 

 

Canada Carbon Inc. (TSX-V:CCB) (FF:U7N1) is pleased to announce it has received all the assay results from the December 2021 drilling program on its Miller Property located in Grenville Sur la Rouge, Quebec. Drilling was conducted from November 28, 2021 (see news release dated December 8, 2021) to December 21st, 2021.

 

The primary objective of the drilling program was to better define and connect the area located between the two pits (Western and Eastern pits) of the Project as defined in its PEA (see news release dated March 4th, 2016). Figure 1 shows the recently completed drill holes in comparison of the previously defined pits.

 

The Company completed 3,024m of drilling in 32 holes varying in depth between 30 and 180 metres. The total length makes this program the largest drill campaign completed to-date on the Miller Property. The drilling was conducted by Downing Drilling based in Calumet at GSLR. SL Exploration Inc, a mineral exploration service company based in Acton Vale provided the geologists and technicians to complete the program. Core logging and sampling was completed in February 2022 and assays results were fully returned by July 2022. Generally, samples were taken every 1.5-meter interval throughout the core and were assayed for graphitic carbon (Cg) content by an independent laboratory while higher grade mineralization was sampled in smaller intersections to better identify the specific grade.

 

Figure 1: Drill Holes Location on the Property

 The Survey

 

In this recent drill campaign, 2375 core samples were bagged and shipped to the laboratory. Additionally, the Company sent 51 blank samples, 78 standard samples and 133 quarter-split duplicate samples. Core samples were prepared by splitting core in half and were bagged and sent to Actlabs, Ancaster, for graphite assaying.

 

Results

 

The Miller property host widespread low grade graphite mineralization that allowed to define two pits for the Miller Project. Previous calculated cut-off grade of 0.50%Cg (see news release dated December 14th, 2016) indicate that some material from the current drill program will likely be incorporated into a new model for the Miller mineralisation. A subset of intersections is shown in table 1, below. Note that multiple other graphite intersections were observed in the drilling campaign but are not shown here and will be incorporated in an upcoming resource calculation.

 

TABLE 1: SELECTED MINERALIZED INTERSECTIONS

 

Drill Hole ID   From
(m)
To
(m)
Interval Length
(m)
Average
Result (%Cg)
DDH21-219   3 64.8 61.8 0.78
  Including 3 37.5 34.5 0.91
DDH21-217   46.5 100.8 54.3 0.61
DDH21-214   3.57 40.5 36.9 0.64
DDH21-219   96.2 102.2 6.0 3.59
DDH21-222   38.4 57.5 19.1 0.94
DDH21-223   20.5 45.7 25.2 0.62

 

The previously updated Resource Estimate includes an indicated resource of 2.65Mt with an average grade of 0.80% graphite, and an inferred resource of 7.56Mt with an average grade of 0.77% graphite, within the boundaries of an optimized open pit mine model, as shown in table 2, below. The cut-off grade used for the modelling was of 0.50%Cg (see news release dated December 14th, 2016 for additional information).

 

TABLE 2: GRAPHITE MINERAL RESOURCES

 

  1. Inferred mineral resources are exclusive of the Measured and Indicated resources.
  2. A fixed density of 2.83 t/m3 was used to estimate the tonnage from block model volumes.
  3. Resources are constrained by the pit shell and the topography of the overburden layer.
  4. Effective date December 14th, 2016.

 

For Reference, see: Ni 43-101 TECHNICAL REPORT for the Mineral Resources Estimation Of the Miller Project, Grenville Quebec Canada Carbon Inc., Jean-Philippe Paiement, M.Sc., P.Geo, January 23, 2017.

 

“The results of the December 2021 drilling program completed at Miller are critical to our ongoing efforts to complete the permitting process for the Miller Project. The drilling intersected multiple widely mineralized zones, as well as multiple graphite pods and veins. This will help to improve the geological model and allow SGS to better define, improve and enhance future pit designs. The work now being undertaken will allow Canada Carbon, Inc. to optimize our environmental management efforts and to proceed with the permitting activities for the Project,” said Ellerton Castor, Chief Executive Officer and a director of the Company.

 

Next Steps

 

The results will be used by SGS’s team to update the modelling on the Miller Property in order to update the resource and to update the pit design. This will allow the Company to provide to the CPTAQ some information that they requested in their latest analysis (see news release dated September 17th, 2021). The information will also be used throughout the next permitting stage of the Miller Project, including an upcoming resources calculation and economic studies; as well as to support the permitting process for the Ministry of Environment and Fight against Climate Change (MELCC), the Ministry of Energy and Natural Resources (MERN) and during the consultation process with the citizens of Grenville-sur-la-Rouge (GSLR), the Argenteuil RCM (Regional County Municipality) and other stakeholders.

 

Qualified Person

 

This press release was prepared by Steven Lauzier, P.Geo, OGQ; and by Pierre-Alexandre Pelletier, P.Geo OGQ, who are qualified persons as defined under National Instrument 43-101, and who reviewed and approved the geological information provided in this news release.

Posted August 5, 2022

Share this news article

MORE or "UNCATEGORIZED"


VIZSLA SILVER AGREES TO ACQUIRE NEWLY CONSOLIDATED PAST-PRODUCING SILVER DISTRICT IN THE EMERGING SILVER-GOLD-RICH PANUCO - SAN DIMAS CORRIDOR IN MEXICO

Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE

March 28, 2024

Additional Drill Results Highlighted by Hole D-380 in Block 6 at Oko West, Intersecting 39.7 m Grading 5.27 g/t Au Including 2.8 m @ 14.18 g/t Au and 13.0 m Grading 10.50 g/t Au

Reunion Gold Corporation (TSX-V: RGD) (OTCQX: RGDFF) is pleased t... READ MORE

March 28, 2024

STLLR Gold’s Tower Gold Project Infill Drilling Continues to Confirm Mineralization at the Jonpol Deposit

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE

March 28, 2024

Hudbay Provides Annual Reserve and Resource Update and Production Outlook

Consolidated copper production is expected to average 153,000i to... READ MORE

March 28, 2024

Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

March 28, 2024

Copyright 2024 The Prospector News