The Prospector News

Baselode Reports Four New Drill holes intersecting over 30 metres of uranium

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Baselode Reports Four New Drill holes intersecting over 30 metres of uranium

 

 

 

 

 

  • AK22-040: 0.19% U3O8 over 22.5 m starting at 81.4 m true vertical depth
  • AK22-066: 37.5 m of composite mineralization includes
    • 0.14% U3O8 over 24.0 m starting at 107.1 m true vertical depth
  • AK22-018: 34.8 m of composite mineralization includes
    • 0.43% U3O8 over 2.65 m starting at 142.4 m true vertical depth
    • 0.11% U3O8 over 12.45 m starting at 188.9 m true vertical depth
  • AK22-075: 35.5 m of composite mineralization includes
    • 0.12% U3O8 over 10.0 m starting at 105.9 m true vertical depth
    • 0.15% U3O8 over 5.5 m starting at 129.5 m true vertical depth
    • 0.23% U3O8 over 5.5 m starting at 139.8 m true vertical depth
    • 0.12% U3O8 over 12.0 m starting at 152.6 m true vertical depth

 

Baselode Energy Corp. (TSX-V: FIND) (OTCQB: BSENF) is pleased to announce the final geochemical assay results from a 22,500 metre diamond drill program completed between February and August on the ACKIO high-grade* uranium discovery, Hook project, Athabasca Basin area, northern Saskatchewan (see Table 1 and Figure 1).

 

“These final drill results continue to expand the scope of ACKIO. The results from drill hole AK22-066 indicate that we likely clipped the margin of another large mineralized zone to the west, similar to the results from AK22-063 (59.85 m of composite mineralization starting at 40.3 m true vertical depth, see news release dated September 12, 2022). This will be a drill priority target for early 2023.  ACKIO’s broad intersections have grades equal to or better than other uranium mining jurisdictions. ACKIO is near-surface, high-grade uranium mineralization with open pit mining potential in proximity to infrastructure and multiple licensed uranium mills,” said James Sykes, CEO, President and Director of Baselode.

 

Drill hole highlights from this news release include;

  • AK22-014: 0.27% U3O8 over 3.5 m at 156.85 m (135.8 m true vertical depth) includes 0.55% U3O8 over 0.5 m at 158.3 m and 0.51% U3O8 over 0.5 m at 159.3
  • AK22-015: 0.13% U3O8 over 7.35 m at 176.9 m (153.2 m true vertical depth)
  • AK22-018: 34.8 m of composite mineralization including
    • 0.43% U3O8 over 2.65 m at 164.45 m (142.4 m true vertical depth) includes 0.76% U3O8 over 0.6 m at 165.0 m
    • 0.10% U3O8 over 9.05 m at 200.55 m (173.7 m true vertical depth) includes 0.70% U3O8 over 0.4 m at 201.0 m
    • 0.11% U3O8 over 12.45 m at 218.1 m (188.9 m true vertical depth)
  • AK22-019: 0.13% U3O8 over 12.45 m at 229.25 m (162.1 m true vertical depth) includes 1.05% U3O8 over 0.5 m at 239.7 m
  • AK22-039: 30.1 m of composite mineralization including
    • 0.12% U3O8 over 9.0 m at 40.8 m (37.0 m true vertical depth)
    • 0.14% U3O8 over 16.5 m at 156.45 m (141.8 m true vertical depth) includes 0.55% U3O8 over 1.0 m at 167.45 m
  • AK22-040: 0.19% U3O8 over 22.5 m at 115.15 m (81.4 m true vertical depth) includes 0.72% U3O8 over 0.5 m at 128.15 m
  • AK22-041: 0.14% U3O8 over 4.0 m at 117.8 m (106.8 m true vertical depth) includes 0.78% U3O8 over 0.5 m at 118.3 m
  • AK22-064: 0.15% U3O8 over 7.5 m at 115.05 m (104.3 m true vertical depth)
  • AK22-066: 37.5 m of composite mineralization including
    • 0.14% U3O8 over 24.0 m at 107.5 m (107.1 m true vertical depth) includes 0.55% U3O8 over 0.5 m at 127.5 m and 0.64% U3O8 over 0.5 m at 129.0 m
  • AK22-075: 35.5 m of composite mineralization including
    • 0.12% U3O8 over 10.0 m at 107.5 m (105.9 m true vertical depth) includes 0.73% U3O8 over 0.5 m at 116.0 m
    • 0.15% U3O8 over 5.5 m at 131.5 m (129.5 m true vertical depth)
    • 0.23% U3O8 over 5.5 m at 142.0 m (139.8 m true vertical depth) includes 0.61% U3O8 over 1.0 m at 145.5 m
    • 0.12% U3O8 over 12.0 m at 155.0 m (152.6 m true vertical depth) includes 0.58% U3O8 over 0.5 m at 166.0 m

 

Baselode started the Program on February 9, 2022 (see Company News Release) and completed the Program on August 2, 2022, with 78 drill holes (AK22-005 to AK22-080, and HK22-007), including one abandoned drill hole (AK22-048), for a total of 22,485.85 m (see Figure 1). Fifty of seventy-six drill holes at ACKIO intersected uranium mineralization. A complete list of drill hole collar information, hand-held scintillometer radioactivity composite measurements, and U3O8 composite assay results for the nineteen drill holes reported in this news release are provided in Table 1.

 

Geochemical U3O8 assay results from drill holes AK22-012 to AK22-019, AK22-039 to AK22-041, AK22-064, AK22-066 and AK22-075 to AK22-080 were provided by Saskatchewan Research Council’s Geoanalytical Laboratory in Saskatoon, Saskatchewan. The assay methodology includes SRCs “U3O8 Wt% Assay” analysis package where an aliquot of sample pulp is digested in a concentration of HCL:HNO3. The digested volume is then made up with deionized water for analysis by ICP-OES. All of the uranium assay results from the Program have been reported, concluding with this news release.

 

NOTES:
1. All reported drill hole lengths do not represent true thicknesses which have yet to be determined.
2. * “High-grade uranium mineralization” is defined by the Company as any result with >0.50% U3O8 over a minimum of 0.25 m drill hole interval

 

The Company is preparing a presentation to provide more context to the full set of uranium assay results reported herein and from previous news releases.

 

For the latest videos from Baselode, Ore Group, and all things Mining, subscribe to our YouTube Chanel: youtube.com/@theoregroup

 

FIGURE 1 – Plan map of the ACKIO mineralized surface expressions

 

TABLE 1 – Drill collar details, composite radioactivity and U3O8 assay results, drill holes AK22-012 to AK22-019, AK22-039 to AK22-041, AK22-064, AK22-066, and AK22-075 to AK22-08

 

About ACKIO

 

Mineralization starts as shallow as 28 m beneath the surface and down to approximately 300 m depth with the bulk of mineralization occurring in the upper 190 m. ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 5 separate zones, and remains open to the west, south, and along the Athabasca sandstone unconformity to the north, east and south.

 

ACKIO is 30 km southeast of well-established infrastructure, including an all-season road and powerline between Cameco Corp.’s (TSX: CCO) and Orano’s McArthur River mine and Key Lake uranium mill joint ventures. ACKIO is 70 km northeast of the Key Lake mill. The Program was helicopter-supported to lessen any ground-induced environmental impacts within the project area.

 

About Baselode Energy Corp.

 

Baselode controls 100% of approximately 227,000 hectares for exploration in the Athabasca Basin area, northern Saskatchewan, Canada. The land package is free of any option agreements or underlying royalties.

 

Baselode’s Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further complemented by the Company’s preferred use of innovative and well-understood geophysical methods to map deep structural controls to identify shallow targets for diamond drilling.

 

QP Statement

 

The technical information contained in this news release has been reviewed and approved by Cameron MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is considered to be a  Qualified Person as defined in “National Instrument 43-101, Standards of Disclosure for Mineral Projects.”

 

Posted November 10, 2022

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News