The Prospector News

Arizona Gold & Silver launches 40 hole drill program at Philadelphia project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Arizona Gold & Silver launches 40 hole drill program at Philadelphia project

 

 

 

 

Arizona Gold and Silver CEO Mike Stark joined Steve Darling from Proactive to share an exciting update on the company’s Philadelphia Project, where they’ve commenced a 40-hole drill program aimed at confirming high-grade mineralization. The exploration is split between two main drilling pads, with up to 20 holes planned per pad. Stark highlighted that Pad 1 will target depths between 800 to 1,000 feet, with flexibility for deeper drilling based on initial results, particularly as Pad 2 sits 600 meters north and may reveal additional findings.

 

Stark emphasized that the drill sites benefit from excellent access due to well-maintained roadways, allowing the team to focus on exploration without major infrastructure modifications. Referring to the project’s potential as a “TSN turning point,” Stark expressed optimism in proving up a hypothesis four years in the making. “It’s a very exciting time for the company,” he remarked, as Arizona Gold & Silver works to unlock the site’s mineralization potential.

 

Courtesy of Proactive Investor and Arizona Gold and Silver

Posted October 31, 2024

Share this news article

MORE or "UNCATEGORIZED"


Scorpio Gold Announces Closing of Public Offering for Gross Proceeds of $10,800,000

Scorpio Gold Corporation (TSX-V: SGN) (OTCQB: SRCRF) (FSE: RY9) i... READ MORE

July 23, 2026

Altamira Gold Expands Mineralized Porphyry System at Maria Bonita Gold Deposit, Cajueiro District, Brazil

Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is ... READ MORE

July 23, 2026

Element 29 Extends Mineralization in ELID035 with Longest Intercept of 1,534.6 m Grading 0.58% CuEq2 at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

Including 1,071.1 m grading 0.61% CuEq2, beyond the limits of the... READ MORE

July 23, 2026

Osisko Gold Reports Final Results from its Lowhee Zone Infill Program at the Cariboo Gold Project

HIGHLIGHTS Completion of the infill drill program in the Lowhee Z... READ MORE

July 23, 2026

Troilus Drills 1.10 g/t AuEq Over 103 m as Z87 Optimization Program Continues to Strengthen Mine Planning

*1.10 G/T AUEQ (0.98 G/T AU, 0.54 G/T AG, 0.07 % CU) OVER 103 M &... READ MORE

July 23, 2026

Copyright 2026 The Prospector News