The Prospector News

Element 29 Extends Mineralization in ELID035 with Longest Intercept of 1,534.6 m Grading 0.58% CuEq2 at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Element 29 Extends Mineralization in ELID035 with Longest Intercept of 1,534.6 m Grading 0.58% CuEq2 at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

 

 

 

 

 

  • Including 1,071.1 m grading 0.61% CuEq2, beyond the limits of the current Mineral Resource Estimate1
  • 4,885.5 m of drilling completed as part of the planned 10,000 m 2026 drill program, with two drill rigs currently active on site.

 

Element 29 Resources Inc. (TSX-V: ECU) (OTCQB: EMTRF) (BVL: ECU) is pleased to announce assay results from three drill holes, including the extension of ELID035, as part of its ongoing diamond drilling program at its Elida Porphyry Copper – Molybdenum – Silver Deposit in central Perú (Figure 1).

 

Highlights

 

Drill hole ELID035 intersected 1,534.6 metres grading 0.58% CuEq2 (0.34% Cu, 0.064% Mo, and 2.56 g/t Ag), from 56.6 m to the end of hole at 1,591.2 m.

  • Including 361.2 m of 0.54% CuEq2 (0.40% Cu, 0.040% Mo, and 4.02 g/t Ag), from 56.6 m to 417.8 m.
    • Including 87.5 m grading 0.67% CuEq2 (0.50% Cu, 0.050% Mo, and 5.13 g/t Ag), from 244.0 m to 331.5 m.
  • Including 1,071.1 m grading 0.61% CuEq2 (0.34% Cu, 0.073% Mo, and 2.18 g/t Ag), 520.2 m to end of hole at 1,591.2 m.
    • Including 508.0 m grading 0.64% CuEq2 (0.40% Cu, 0.066% Mo, and 2.42 g/t Ag), from 1,083.2 m to end of hole at 1,591.2 m.

 

Richard Osmond, President and CEO of Element 29, states, “Priorities at our flagship Elida project remain clear: continue to grow the existing Mineral Resource, de-risk the project through systematic technical studies, and unlock the full potential of what we believe is a large Cu-Mo-Ag porphyry system. The latest drilling continues to demonstrate the grade, scale, and continuity of the mineralized system, while refining our geological model and identifying opportunities to expand the resource both laterally and at depth. With an upgraded environmental permit application advancing, ongoing metallurgical test work, and two drill rigs currently operating, we are well positioned to continue creating value through disciplined exploration in one of the world’s premier copper-producing jurisdictions. We look forward to advancing Elida and our broader portfolio throughout the remainder of 2026.

 

Watch a detailed breakdown of the drilling results on YouTube with Richard Osmond here:

https://youtu.be/3NmwnGtkOA0.

 

Commentary and Interpretation

 

Elida continues to deliver long intercepts of Cu-Mo-Ag mineralization, with ELID035 returning the longest continuous interval of mineralization drilled to date, extending from near surface to a vertical depth of more than 1,500 m., well beyond the limits of the current Mineral Resource Estimate¹, reinforcing the potential for further Mineral Resource expansion. Reported intercepts represent downhole lengths; true widths are not known at this time.

 

ELID035 was originally drilled to a depth of 979.0 m (Table 1), where it was terminated for operational reasons while still in mineralization. The hole was subsequently extended to a final depth of 1,591.2 m and returned the longest continuous mineralized interval to date at Elida, intersecting 1,534.6 m grading 0.58% CuEq² (0.34% Cu, 0.064% Mo, 2.56 g/t Ag) from the bedrock surface at 56.6 m depth to the end of hole (Table 2). This includes 1,071.5 m grading 0.61% CuEq² (0.34% Cu, 0.073% Mo, and 2.18 g/t Ag) from 520.2 m to the end of hole, extending mineralization more than 1,000 m beyond the limits of the current Mineral Resource Estimate¹. The hole also intersected 508.0 m grading 0.64% CuEq² (0.4% Cu, 0.066% Mo, 2.42 g/t Ag) from 1,083.2 m to the end of hole, including 186.8 m grading 0.77% CuEq² (0.50% Cu, 0.076% Mo, and 3.00 g/t Ag) from 1,257.5 m to 1,444.3 m depth (Figure 2). These deeper, higher-grade intervals are spatially associated with a large low-resistivity magnetotelluric geophysical anomaly that also coincides with the deep, higher-grade mineralization intersected in hole ELID037 (refer to news release – January 26, 2026). Together, these holes demonstrate continuity of the mineralized system at depth, highlighting the potential for Mineral Resource expansion in this area.

 

ELID042 was completed to a depth of 1,745.1 m (Table 1) and returned 805.8 m grading 0.36% CuEq² (0.28% Cu, 0.023% Mo, and 3.68 g/t Ag) from 123.7 m to 929.5 m, including 239.8 m grading 0.38% CuEq² (0.31% Cu, 0.019% Mo, and 4.34 g/t Ag) from 289.0 m to 528.8 m, and 308.7 m grading 0.43% CuEq² (0.33% Cu, 0.028% Mo, and 4.35 g/t Ag) from 620.8 m to 929.5 m (Table 2). These results extend the porphyry Cu-Mo-Ag mineralization more than 500 m beyond the current pit shell (Figure 3), highlighting the potential for Mineral Resource expansion in this area.

 

ELID043 was completed to a depth of 1,296.0 m (Table 1) and intersected multiple mineralized intervals, highlighting the potential for Mineral Resource expansion along the southern side of the deposit. The deepest of these intervals returned 343.8 m grading 0.30% CuEq² (0.23% Cu, 0.021% Mo, and 2.53 g/t Ag) from 952.2 m to the end of hole (Table 2). Drilling was terminated for operational reasons while still in porphyry-related alteration and mineralization, suggesting the system is open at depth and to the west toward Zone 4 (Figure 4).

 

Next Steps

 

Drilling continues to focus on expanding the near-surface, open-pit resources while also evaluating the potential for higher-grade mineralization at depth beyond the limits of the existing Mineral Resource Estimate¹.

 

Along the northwestern side of the deposit, drilling continues to target long, higher-grade intervals of mineralization to the north and west of holes ELID035 and ELID037. Drilling also supports the interpretation that the deeper higher-grade mineralization intersected in these holes extends westward toward Zone 4, where a strongly leached, phyllic-altered mineralized porphyry stock is emplaced along the contact between the Coastal Batholith and the Casma Group volcano-sedimentary rocks.

 

The Company continues to advance the new Permiso de Inicio de Actividades drill permit under its upgraded Declaración de Impacto Ambiental environmental certification. Recent revisions to the DIA environmental certification are expected to authorize up to 60 drill platforms over an additional five-year period, supporting expanded exploration beyond the existing Mineral Resource and evaluation of the broader hydrothermal alteration footprint of the Elida Cu-Mo-Ag porphyry system.

 

Metallurgical test work is ongoing to evaluate copper, molybdenum, and silver recoveries, characterize the principal ore types within the deposit, and assess concentrate quality, including the potential presence of deleterious elements. The results will support future Mineral Resource updates and provide the foundation for subsequent engineering and economic studies.

 

Analytical Quality Control & Quality Assurance

 

Elida Resources S.A.C., a wholly owned subsidiary of Element 29 Resources Inc., supervises drilling and carries out sampling of PQ, HQ and NQ core. Logging and sampling are completed at a secured Company facility situated near the Elida project site. Sample intervals are nominally 2 m long. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation by an independent transportation company to the ALS Peru S.A.C., an independent laboratory in Lima. Samples are analyzed for 34 elements using HF-HNO₃-HClO₄ acid digestion followed by an HCl leach (“Four-Acid Digestion”) with ICP-AES analysis (ME-ICP61). Samples reporting over-limit values are re-analyzed using the same digestion method with an ICP-AES finish (ME-OG62). ALS is an independent, accredited analytical laboratory operating in accordance with ISO/IEC 17025:2017 quality standards.

 

The analytical results for ELID035 were previously reported in the Company’s news release dated January 22, 2025. Samples were initially analyzed using Aqua Regia digestion with an ICP-AES finish (ME-ICP41), with over-limit samples re-analyzed using Aqua Regia digestion with an ICP-AES finish (ME-OG62). Pulp samples from the original analytical program were subsequently re-analyzed using the current analytical procedures and are reported together with results from the current drill program in table two. Element 29 employs an independent, internal quality assurance/quality control program that includes insertion of duplicate, blank, and certified reference samples at the field site. The Company is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data reported.

 

Qualified Person

 

The scientific and technical content of this news release has been reviewed and approved by Richard Osmond (P.Geo.), Element 29’s President and CEO, who is the “Qualified Person” as defined by National Instrument 43-101 Standards for Disclosure for Mineral Projects.

 

Table 1: Diamond drill hole collar locations and orientations (WGS84/Zone 18S).

 

Table 2: Length-weighed assay intervals for drill holes.

 

Figure 1: Plan map showing the reported drill holes (green) as well as the historical drill holes (black) from drilling programs at Elida. The figure also showing the Mineral Resource Estimate¹ and the other target zones.

 

Figure 2: An east-west oriented geological cross section along northing 8835335N containing drill hole ELID035. The section shows the length-weighted assay intervals of CuEq2 (%) geochemistry for ELID035 as well as for the historical drill holes. The section also shows a 2D vertical slice along the cross section through the existing pit-constrained Mineral Resource Estimate1.

 

Figure 3: An east-west oriented geological cross section along easting 259905E containing drill hole ELID042. The section shows the length-weighted assay intervals of CuEq2 (%) geochemistry for ELID042 as well as for the historical drill holes. The section also shows a 2D vertical slice along the cross section through the existing pit-constrained Mineral Resource Estimate1.

 

Figure 4: An east-west oriented geological cross section along northing 8834645N containing drill hole ELID043. The section shows the length-weighted assay intervals of CuEq2 (%) geochemistry for ELID043 as well as for the historical drill holes. The section also shows a 2D vertical slice along the cross section through the existing pit-constrained Mineral Resource Estimate1.

 

About Element 29 Resources Inc.

 

Element 29 is an emerging junior resource company with a highly experienced management team and board focused on exploring and potentially developing copper deposits in Perú, one of the lowest-cost, lowest-risk mining jurisdictions globally. The Company’s principal objectives are to expand resources and de-risk its Elida Porphyry Cu-Mo-Ag Deposit in west-central Perú which has an initial pit-constrained inferred Mineral Resource Estimate1 of 321.7 million tonnes grading 0.32% Cu, 0.03% Mo and 2.61 g/t Ag at a 0.2% Cu cutoff grade and a low 0.74:1 modeled strip ratio.

 

Alongside Elida, the Company has three (3) early stage, highly prospective porphyry Cu projects in Perú for more than 25,000 ha of titled concession. These include the Flor de Cobre porphyry Cu-Mo prospect situated in the Southern Perú Copper Belt, just 26 km from the Cerro Verde copper mine3 (Freeport-Buenaventura) as well as the Paka and Pahuay porphyry Cu skarn prospects related to potential tertiary-aged, mineralized porphyry complexes intruding along the eastern margin of the Peruvian Coastal Batholith. All projects are well located for future mine development and will benefit from nearby infrastructure including roads, powerlines, ports, water, and a skilled workforce.

 

Posted July 23, 2026

Share this news article

MORE or "UNCATEGORIZED"


Scorpio Gold Announces Closing of Public Offering for Gross Proceeds of $10,800,000

Scorpio Gold Corporation (TSX-V: SGN) (OTCQB: SRCRF) (FSE: RY9) i... READ MORE

July 23, 2026

Altamira Gold Expands Mineralized Porphyry System at Maria Bonita Gold Deposit, Cajueiro District, Brazil

Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is ... READ MORE

July 23, 2026

Osisko Gold Reports Final Results from its Lowhee Zone Infill Program at the Cariboo Gold Project

HIGHLIGHTS Completion of the infill drill program in the Lowhee Z... READ MORE

July 23, 2026

Troilus Drills 1.10 g/t AuEq Over 103 m as Z87 Optimization Program Continues to Strengthen Mine Planning

*1.10 G/T AUEQ (0.98 G/T AU, 0.54 G/T AG, 0.07 % CU) OVER 103 M &... READ MORE

July 23, 2026

Copyright 2026 The Prospector News