Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

          HIGHLIGHTS   8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo …

First Majestic Reports Q2 2026 Production Results; Announces Updated 2026 Production and Cost Guidance

          First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) announces that total production in the second quarter of 2026 from the Company’s four producing underground mines in Mexico, namely, the Santa Elena Silver/Gold Mine, …

Teck, Canada Growth Fund and Canada Critical Minerals Accelerator sign Agreement to Support Strategic Metals Production at Trail Smelter

          Teck Resources Limited, Canada Growth Fund Inc.  and Natural Resources Canada’s Canada Critical Minerals Accelerator announced that they have signed a Strategic Investment Agreement to support expanding production capacity for germanium, gallium, and antimony at …

North Peak Secures On-Site Water Supply and Installs Pump, Clearing the Way for Diamond Drilling of the Prospect Mountain Sulphide Anomaly

          North Peak Resources Ltd. (TSX-V: NPR) (OTCQB: NPRLF) is pleased to announce that it has installed a water supply pump at its 100%-owned Prospect Mountain Mine Complex in Eureka County, Nevada, securing a reliable on-site …