NexGen Expands High-Grade Subdomain Vertical Extent by 17% to 644 m and Intersects Continuous Strong Mineralization Across Patterson Corridor East (PCE) while Adding Fifth Drill to Advance Optimally

          Highlights: Vertical extent of high-grade subdomain increased by 94 m to 644 m with RK-26-293 intersecting cumulative 4.7 m of >10,000 cps, including 0.1 m of >61,000 cps at 930 m depth. Down plunge test …

Economic study demonstrates scale, grade, long life, growth potential and robust financial returns

          Green Bay Copper-Gold Project, Canada Preliminary Economic Assessment and Mineral Resource Update    KEY POINTS Preliminary Economic Assessment1 into the restart of production at the Green Bay Ming Mine Copper-Gold Project demonstrates a robust large-scale, …