Independence Gold Intersects 11.00 Metres of 6.14 g/t Gold and 59.64 g/t Silver in the Ted-Mint Vein System at the 3Ts Project, BC

          Independence Gold Corp. (TSX-V: IGO) (OTCQB: IEGCF) is pleased to announce assay results from the Ted-Mint Vein System from the spring drill program carried out at its 100% owned 3Ts Project. The 3Ts Project is …

Goliath Intercepts The Highest Concentration Of Visible Gold To Date At Surebet Where 66% Of 2024 Drill Holes Contain Visible Gold, Discovers New Deep Mineralized Zone 1.2 Km Below Surface, Remains Open, And Significantly Expands Drilling To 36,000 Meters With 8 Rigs Turning

          Surebet Drill Highlights: Drill hole GD-24-260 has the highest concentration of Visible Gold drilled to date at the Surebet Discovery. This intercept suggests this structure is a principal conduit for gold-depositing fluids and is likely …

Avalon Completes PEA: Post-Tax C$4.1 Billion NPV (8%) and 48% IRR at its Thunder Bay Lithium Processing Facility, ON

          Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF), is pleased to announce the completion of a Preliminary Economic Assessment for its Lithium Hydroxide Processing Facility project in Thunder Bay, Ontario, Canada.   The PEA prepared by DRA Americas Inc. …