The Prospector News

XIMEN MINING DRILLING UPDATE AMELIA GOLD PROJECT

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

XIMEN MINING DRILLING UPDATE AMELIA GOLD PROJECT

 

 

 

 

 

CAMP MCKINNEY BC

 

 

Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that it is in full swing with its drill program at the Amelia project in Camp McKinney near Rock Creek in southern BC.

 

Active drilling at Amelia Property in September 2023

 

“The Amelia Gold Mine, located in Camp McKinney, British Columbia, holds historical significance as one of the first dividend-paying gold mines in the region. Today, Ximen Mining Corp owns 100% of the camp, offering us a unique opportunity to expand the current high-grade gold vein system. This expansion was previously hindered due to ownership constraints, which have now been overcome under Ximen’s ownership,” states Anderson, CEO of Ximen Mining Corp.

 

3D model of Cariboo mine (looking North) showing vein blocks
and current drill holes

 

Drilling at the Amelia property is now underway to test for extensions to the historic Cariboo-Amelia gold mine in Camp McKinney in the Greenwood Mining Division, BC. Over its 68-year history, the Cariboo-Amelia mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).  The mine is part of a 4-kilometer system of gold-quartz veins and historic workings.

 

Core box with mineralized quartz vein intercept in hole AM23-01

 

Current drilling is targeting the main Cariboo or McKinney vein beneath the eastern end of the historic mine.  Two holes have been completed so far (total 533 meters) and a third hole is being drilled.  The target vein was intersected in hole AM23-01 at about 30 meters below the mine and consisted of 0.61 meters of banded quartz containing pyrite, sphalerite, galena and chalcopyrite, a sulphide mineral assemblage that is typical of the vein that was mined.  The drill results prove that the vein extends below the mine. The core has been sampled and will be sent for analysis in due course.

 

Close-up photo of disseminated sulphide mineralization
in quartz vein in hole AM23-01

 

Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.

Posted September 30, 2023

Share this news article

MORE or "UNCATEGORIZED"


NEW GOLD COMPLETES US$173 MILLION BOUGHT DEAL FINANCING

New Gold Inc. (TSX: NGD) (NYSE American: NGD) is pleased to annou... READ MORE

May 17, 2024

SILVER VIPER CLOSES LIFE OFFERING

Silver Viper Minerals Corp. (TSX-V: VIPR) (OTC: VIPRF) announces... READ MORE

May 17, 2024

MAX Power Closes $1.9 Million Private Placement

MAX Power Mining Corp. (CSE: MAXX) (OTC: MAXXF) (FRANKFURT: 89N) ... READ MORE

May 17, 2024

McEwen Copper Announces Completion of the Feasibility Drilling Program

70,000 meters completed, highlights include:   349.0 m of 0.77... READ MORE

May 17, 2024

Rupert Resources Reports Results From Project Drilling Including 120m at 6.2g/t Gold

Rupert Resources Ltd. (TSX:RUP) reports assay results from projec... READ MORE

May 16, 2024

Copyright 2024 The Prospector News