The Prospector News

XIMEN MINING DRILLING UPDATE AMELIA GOLD PROJECT

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

XIMEN MINING DRILLING UPDATE AMELIA GOLD PROJECT

 

 

 

 

 

CAMP MCKINNEY BC

 

 

Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that it is in full swing with its drill program at the Amelia project in Camp McKinney near Rock Creek in southern BC.

 

Active drilling at Amelia Property in September 2023

 

“The Amelia Gold Mine, located in Camp McKinney, British Columbia, holds historical significance as one of the first dividend-paying gold mines in the region. Today, Ximen Mining Corp owns 100% of the camp, offering us a unique opportunity to expand the current high-grade gold vein system. This expansion was previously hindered due to ownership constraints, which have now been overcome under Ximen’s ownership,” states Anderson, CEO of Ximen Mining Corp.

 

3D model of Cariboo mine (looking North) showing vein blocks
and current drill holes

 

Drilling at the Amelia property is now underway to test for extensions to the historic Cariboo-Amelia gold mine in Camp McKinney in the Greenwood Mining Division, BC. Over its 68-year history, the Cariboo-Amelia mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).  The mine is part of a 4-kilometer system of gold-quartz veins and historic workings.

 

Core box with mineralized quartz vein intercept in hole AM23-01

 

Current drilling is targeting the main Cariboo or McKinney vein beneath the eastern end of the historic mine.  Two holes have been completed so far (total 533 meters) and a third hole is being drilled.  The target vein was intersected in hole AM23-01 at about 30 meters below the mine and consisted of 0.61 meters of banded quartz containing pyrite, sphalerite, galena and chalcopyrite, a sulphide mineral assemblage that is typical of the vein that was mined.  The drill results prove that the vein extends below the mine. The core has been sampled and will be sent for analysis in due course.

 

Close-up photo of disseminated sulphide mineralization
in quartz vein in hole AM23-01

 

Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.

Posted September 30, 2023

Share this news article

MORE or "UNCATEGORIZED"


Namibia Critical Metals Announces Completion of Japan's C$23 Million Earn-In and Formation of Strategic Joint Venture Company for the Lofdal Heavy Rare Earth Project

Namibia Critical Metals Inc. (TSX-V: NMI) (OTCQB: NMREF) is pleased to announce that Japan Organizat... READ MORE

July 31, 2026

Eldorado Gold Reports Solid Q2 2026 Financial and Operational Results; Skouries On Track for Q3 2026

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

July 31, 2026

DPM Metals Reports Record Q2 2026 Free Cash Flow and Earnings; Vareš On-Track to Achieve Full Production by Year-end 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) announced its operating and financial results for the second q... READ MORE

July 31, 2026

IMC Rare Earths Ltd Announces Closing of $20 Million Initial Public Offering

IMC Rare Earths Ltd, a company focused on the mineral exploration and development of magnet rare ear... READ MORE

July 31, 2026

Fairchild Gold Announces Closing of Private Placement Financing and Early Warning Report

Fairchild Gold Corp. (TSX-V: FAIR), is pleased to announce the closing, on July 29, 2026, of its pre... READ MORE

July 31, 2026

Copyright 2026 The Prospector News