The Prospector News

XIMEN MINING CORP ANNOUNCES A CLEAN ELECTRICITY AGREEMENT WITH ENERGY PLUG TECHNOLOGIES CORP

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

XIMEN MINING CORP ANNOUNCES A CLEAN ELECTRICITY AGREEMENT WITH ENERGY PLUG TECHNOLOGIES CORP

 

 

 

 

 

Ximen Mining (TSX-V: XIM) is pleased to announce an agreement for a two phase clean electricity generation project with Energy Plug Technologies Corp (CSE: PLUG), Vancouver, BC,  and Renewable Energy Power to design, power and generate the Kenville Gold Mine in Nelson BC to progress towards meeting  their zero emission targets. Phase one includes the installation of three 10kW Lithium-Iron Phosphate storage batteries connected to solar panels that will provide power to three mine buildings. Phase two will include a 1MW Battery Storage System (BESS) designed to accommodate large compressors, ventilation and lighting for the mine site that will also include a 20kW turbine on the river to generate power. This solar and water clean electricity supply will provide renewable energy at a lower cost with a targeted three year (ROI) return on investment while also taking advantage of the Clean Electricity and Clean Energy Tax Credit.

40 foot Containers used for Large Battery Storage Systems, external cooling for climate

40 foot Containers used for Large Battery Storage Systems, external cooling for climate

The BESS project will enable Ximen Mining to charge the system during off-peak hours and feed this energy back into the grid during peak load periods, typically around the dinner hours of 5:00 – 7:00 pm.  The system will operate year-round; however, it will be particularly important during extreme cold periods like those experienced in December through February.  The BESS will assist in smoothing out these peaks and reduce the cost of purchased power, helping to keep rates lower.

“Ximen Mining Corp is thrilled to announce a groundbreaking clean electricity partnership with Energy Plug Technologies Corp and Renewable Energy Power. Our two-phase initiative at the Kenville Gold Mine demonstrates our commitment to sustainable mining, utilizing solar panels, lithium-iron phosphate batteries, and a 1MW Battery Storage System. This forward-thinking project aligns with our zero-emission goals, ensuring operational efficiency and lower costs while setting a new standard for responsible resource extraction.” stated Christopher Anderson, CEO of Ximen Mining Corp.

Ending 2023 with an agreement with Ximen Mining continues the momentum for Energy Plug as we further our commitment to helping businesses embrace BESS units for the benefit of the environment and their bottom line stated Broderick Gunning – President, CEO of Energy Plug Corp.

Posted January 2, 2024

Share this news article

MORE or "UNCATEGORIZED"


URANIUM ENERGY CORP ANNOUNCES THE CLOSING OF $203 MILLION PUBLIC OFFERING

Proceeds to be Used to Accelerate the Development of the United ... READ MORE

October 6, 2025

Barrick Announces Sale of Interest in Tongon for Up To $305 Million

Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE

October 6, 2025

Aquitaine Metals Drills Broad High-Grade Gold Mineralization: 16.45 g/t gold over 20.00 metres at Limousin Project

Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE

October 6, 2025

B2Gold Achieves Commercial Production at the Goose Mine

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE

October 6, 2025

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters

HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE

October 6, 2025

Copyright 2025 The Prospector News