Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that has completed its drill campaign for 2023 and demobilized equipment from the Amelia Gold project in Camp McKinney near Rock Creek in southern BC. The outdoor temporary camp was disassembled and demobilized with the onset of winter conditions.
|
The Cariboo-Amelia mine was BC’s first dividend paying gold mine. Over its 68-year history, the mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).
The mine is part of a 4-kilometer long system of gold-quartz veins and historic workings. Ximen is planning to continue testing this system, working outwards from the mined area.
|
Longitudinal view of Amelia mine (looking North) showing vein blocks and 2023 drill holes
|
Delta Resources Limited (TSX-V:DLTA) (OTC Pink: DTARF) (FRANKFURT:6GO1) is pleased t... READ MORE
Chibougamau Independent Mines Inc. (TSX-V: CBG) (Frankfurt: CLL1) (OTC: CMAUF), herein called Chibou... READ MORE
OR Royalties Inc. (TSX: OR) (NYSE: OR) is pleased to announce that it has acquired an additional 1.0... READ MORE
Silver One Resources Inc. (TSX-V: SVE) (OTCQX: SLVRF) (FSE: BRK1) is pleased to announce that... READ MORE
Gold X2 Mining Inc. (TSX-V: AUXX) (OTCQB: GSHRF) (FWB: DF8), is pleased to announce the fourth and f... READ MORE