Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that has completed its drill campaign for 2023 and demobilized equipment from the Amelia Gold project in Camp McKinney near Rock Creek in southern BC. The outdoor temporary camp was disassembled and demobilized with the onset of winter conditions.
|
The Cariboo-Amelia mine was BC’s first dividend paying gold mine. Over its 68-year history, the mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).
The mine is part of a 4-kilometer long system of gold-quartz veins and historic workings. Ximen is planning to continue testing this system, working outwards from the mined area.
|
Longitudinal view of Amelia mine (looking North) showing vein blocks and 2023 drill holes
|
Appia Rare Earths & Uranium Corp. (CSE: API) (OTCQB: APAAF) (FSE: A0I0) (MUN: A0I0) (BER:... READ MORE
Empress Royalty Corp. (TSX-V: EMPR) (OTCQX: EMPYF) announces its financial and operating results for... READ MORE
Canuc Resources Corporation (TSX-V: CDA) (OTCQB: CNUCF) (WKN: A14ZX4) is pleased to announce results... READ MORE
IMDEX Limited (ASX: IMD) is pleased to announce it has entered into binding agreements to acquire 10... READ MORE
Thesis Gold Inc. (TSX-V: TAU) (WKN: A3EP87) (OTCQX: THSGF) is pleased to announce positive results f... READ MORE