
Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that has completed its drill campaign for 2023 and demobilized equipment from the Amelia Gold project in Camp McKinney near Rock Creek in southern BC. The outdoor temporary camp was disassembled and demobilized with the onset of winter conditions.
|
The Cariboo-Amelia mine was BC’s first dividend paying gold mine. Over its 68-year history, the mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).
The mine is part of a 4-kilometer long system of gold-quartz veins and historic workings. Ximen is planning to continue testing this system, working outwards from the mined area.
|
Longitudinal view of Amelia mine (looking North) showing vein blocks and 2023 drill holes
|
Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to announce initial assay results for its... READ MORE
Wallbridge Mining Company Limited (TSX: WM) (OTCQB:WLBMF) today announced the results for the first ... READ MORE
West Red Lake Gold Mines Ltd. (TSX-V: WRLG) (OTCQB: WRLGF) is pleased to report how learnings from... READ MORE
XXIX Metal Corp. (TSX-V: XXIX) (OTCQB: QCCUF) (FSE: 5LW0) is pleased to announce an updated Miner... READ MORE
Exploits Discovery Corp. (CSE: NFLD) (OTCQB: NFLDF) (FSE: 634) is pleased to announce that it has en... READ MORE