Wesdome Gold Mines Ltd. (TSX: WDO) (OTCQX: WDOFF) announced its financial results for the three and nine months ended September 30, 2026. Preliminary operating results for Q3 2026 were disclosed in the Company’s press release dated October 13, 2026.
Q3 2026 Highlights
Anthea Bath, President and Chief Executive Officer, commented: “We reiterate full-year production guidance and expect a strong fourth quarter, with both Eagle River and Kiena finishing within their respective guidance ranges, albeit below the midpoint. Higher throughput at Eagle River, additional mining fronts at Kiena and exploration success underpin our longer-term growth opportunity.
“At Eagle River, our fill-the-mill strategy delivered record quarterly throughput and a 19% reduction in production costs per tonne compared with Q2. Third-quarter grade was affected by lower than expected grade in one stope and incomplete mining of one sill. Key Q4 stopes are already drilled off, and high-grade ore continues to reconcile well with our reserve model, supporting our confidence in a stronger finish.
“At Kiena, seasonal workforce planning gaps reduced equipment utilization and productivity, delaying the mining sequence. Two higher-grade Kiena Deep stopes originally scheduled for Q3 are now planned for Q4, while lower-grade Presqu’île development ore represented a larger share of third-quarter mill feed. We have identified the resourcing planning gaps and have a plan in place to improve execution. Positive grade reconciliation and Presqu’île’s transition to stope production further support our Q4 outlook.
“Nearly $220 million in year-to-date free cash flow and $735 million in quarter-end liquidity give us the capacity to advance development and exploration while continuing to return capital to shareholders.”
Consolidated Financial and Operating Highlights
| In 000s, except per units and per share amounts | ||||
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |
| Financial results | ||||
| Revenues² | 250,588 | 230,284 | 817,145 | 626,450 |
| Cost of sales | 75,641 | 61,841 | 235,873 | 181,046 |
| Gross profit | 155,447 | 149,005 | 511,474 | 384,551 |
| Operating cash margin¹ | 174,947 | 168,443 | 581,272 | 445,404 |
| EBITDA¹ | 157,491 | 149,509 | 539,343 | 407,178 |
| Net income | 89,723 | 86,923 | 302,560 | 232,092 |
| Earnings per share | 0.62 | 0.58 | 2.06 | 1.54 |
| Adjusted net income¹ | 89,723 | 86,923 | 305,331 | 228,252 |
| Adjusted net income per share¹ | 0.62 | 0.58 | 2.07 | 1.52 |
| Net cash from operating activities | 102,347 | 118,168 | 351,650 | 299,155 |
| Operating cash flow per share³ | 0.71 | 0.78 | 2.39 | 1.99 |
| Net cash used in financing activities | (51,171) | (400) | (181,267) | (268) |
| Net cash used in investing activities | (62,169) | (39,439) | (144,314) | (156,091) |
| Free cash flow¹ | 51,548 | 78,919 | 219,126 | 179,258 |
| Free cash flow per share¹ | 0.36 | 0.52 | 1.49 | 1.19 |
| Average USD/CAD exchange rates | 1.3989 | 1.3775 | 1.3847 | 1.3989 |
| Operating results | ||||
| Gold produced (ounces) | 41,287 | 50,465 | 130,414 | 138,938 |
| Gold sold (ounces) | 41,800 | 47,400 | 131,500 | 138,600 |
| Per ounce of gold sold¹ | ||||
| Cost of sales⁴ ($/oz) | 1,810 | 1,305 | 1,794 | 1,306 |
| Cost of sales⁴ (US$/oz) | 1,294 | 947 | 1,295 | 934 |
| Cash costs¹ ($/oz) | 1,801 | 1,300 | 1,783 | 1,301 |
| Cash costs¹ (US$/oz) | 1,287 | 944 | 1,288 | 930 |
| AISC¹ ($/oz) | 2,503 | 1,954 | 2,420 | 2,009 |
| AISC¹ (US$/oz) | 1,789 | 1,419 | 1,748 | 1,436 |
| Average realized price¹ ($/oz) | 5,986 | 4,853 | 6,203 | 4,515 |
| Average realized price¹ (US$/oz) | 4,279 | 3,523 | 4,480 | 3,228 |
| Financial position | ||||
| Cash | 379,934 | 265,893 | 379,934 | 265,893 |
| Working capital⁵ | 410,298 | 274,495 | 410,298 | 274,495 |
| Total assets | 1,289,574 | 1,035,161 | 1,289,574 | 1,035,161 |
| Current liabilities | 65,821 | 72,371 | 65,821 | 72,371 |
| Total liabilities | 223,174 | 204,849 | 223,174 | 204,849 |
Eagle River (Ontario, Canada)
The Eagle River Mine, a wholly-owned subsidiary of Wesdome, is an underground operation situated on approximately 400 square kilometres in northern Ontario, approximately 50 kilometres west of Wawa within the Mishibishu Greenstone Belt. Built in 1995, Eagle River has produced more than two million ounces of gold since commissioning and has an 8-year reserve mine life as at December 31, 2025.
Operational and Financial Results
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |
| Ore milled (tonnes) | 79,820 | 71,575 | 223,990 | 180,208 |
| Head grade (g/t) | 10.1 | 15.3 | 10.7 | 15.9 |
| Average mill recoveries (%) | 95.9 | 97.3 | 96.3 | 96.8 |
| Gold production (oz) | 24,758 | 34,296 | 74,402 | 88,907 |
| Gold sold (ounces) | 24,500 | 32,700 | 74,150 | 87,400 |
| Production costs per tonne milled¹ ($) | 511 | 495 | 574 | 557 |
| Costs per oz of gold sold ($/oz) | ||||
| Operating cash margin¹ | 4,200 | 3,673 | 4,318 | 3,304 |
| Cost of sales | 1,807 | 1,181 | 1,883 | 1,238 |
| Cash costs¹ | 1,798 | 1,176 | 1,873 | 1,233 |
| All-in sustaining costs¹ | 2,578 | 1,657 | 2,507 | 1,824 |
| Costs per oz of gold sold (US$/oz) | ||||
| Operating cash margin¹ | 3,002 | 2,666 | 3,119 | 2,362 |
| Cost of sales | 1,292 | 857 | 1,361 | 885 |
| Cash costs¹ | 1,285 | 853 | 1,352 | 882 |
| All-in sustaining costs¹ | 1,843 | 1,203 | 1,810 | 1,304 |
| In $000s, except per unit and per share amounts | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 |
| Gold revenue from mining operation | 146,941 | 158,539 | 459,113 | 396,540 |
| Cost of sales | ||||
| Mining | 19,157 | 16,242 | 57,226 | 49,333 |
| Processing | 7,545 | 6,334 | 22,604 | 19,264 |
| Site administration and camp costs | 14,360 | 12,920 | 45,331 | 37,042 |
| Change in inventories | (287) | (71) | 3,341 | (5,212) |
| Royalties | 3,497 | 3,185 | 11,098 | 7,780 |
| 44,272 | 38,610 | 139,600 | 108,207 | |
| Silver revenue | (230) | (169) | (701) | (424) |
| Total cash costs | 44,042 | 38,441 | 138,899 | 107,783 |
| Cost of sales per ounce of gold sold | 1,807 | 1,181 | 1,883 | 1,238 |
| Cash cost per ounce of gold sold1 | 1,798 | 1,176 | 1,873 | 1,233 |
| Operating cash margin1 | 102,899 | 120,098 | 320,214 | 288,757 |
| All-in sustaining costs1 | ||||
| Sustaining mine exploration and development | 9,792 | 8,370 | 24,512 | 24,787 |
| Sustaining mine capital equipment | 6,193 | 3,360 | 12,981 | 15,071 |
| Sustaining tailings management facility | (47) | 469 | 102 | 1,093 |
| Corporate and general allocation | 3,054 | 3,435 | 8,975 | 9,998 |
| Payment of sustaining lease liabilities | 139 | 107 | 392 | 676 |
| 63,173 | 54,182 | 185,861 | 159,408 | |
| All-in sustaining costs per ounce of gold1 | 2,578 | 1,657 | 2,507 | 1,824 |
| Cost of sales per tonne milled1 | 555 | 539 | 623 | 600 |
| Production costs per tonne milled1 | 511 | 495 | 574 | 557 |
| Total capital expenditures | 21,010 | 12,836 | 48,021 | 41,950 |
Operating Highlights
Eagle River gold production decreased by 28% to 24,758 ounces in Q3 2026 from 34,296 ounces in Q3 2025, reflecting the initial phase of the mine’s transition to a longer-life higher tonnage mine operating model as part of its fill-the-mill strategy. Tonnes increased 12%, setting a new quarterly record. Higher throughput was more than offset by a 34% decrease in average head grade, which reflects the mining sequence and the updated reserve plan. That plan brings lower-grade stopes and incremental-cut-off development ore into the mill feed alongside high-grade production. Mined grades continue to reconcile well with the reserve model.
In the first three quarters of 2026, Eagle River produced 74,402 ounces, a 16% decrease from 88,907 ounces in the same period of 2025. Tonnes processed increased 24% and grade decreased 33%.
Mill throughput of 79,820 tonnes in Q3 2026 was 12% higher than Q3 2025, reflecting improved mine and mill availability. Year-to-date throughput of 223,990 tonnes was 24% higher than in the same period in 2025, as productivity initiatives deliver more consistent tonnage to the mill.
Despite a 12% increase in tonnes processed in Q3 2026, production costs increased slightly to $511 per tonne from $495 per tonne in Q3 2025 due to inflationary pressure on wages, supplies, fuel, and insurance that have been broadly felt across the industry as well as advancing production drilling to create stope inventory, offsetting fixed cost leverage. Production costs per tonne in the first three quarters of 2026 increased by 3% to $574 per tonne compared to $557 per tonne in the first three quarters of 2025, reflecting similar factors and increased focus on maintenance in both the mine and the mill to improve availability. Production costs per tonne declined by 19% from Q2 2026 due to the increased productivity and removal of one-off items. As throughput continues to increase, we expect higher volumes to further reduce production costs per tonne.
Financial Highlights
In Q3 2026, Eagle River’s gold revenue decreased by 7% to $146.9 million from $158.5 million in Q3 2025 due to a 25% decrease in ounces sold, offset by the higher average realized price of gold. During the first three quarters of 2026, Eagle River’s gold revenue increased by 16% to $459.1 million from $396.5 million in the same period in 2025 due to the increase in the average realized price of gold sold, partly offset by a 15% decrease in ounces sold.
Cost of sales in Q3 2026 was $44.3 million, an increase of 15% relative to the comparative period in 2025 primarily due to a $4.1 million increase in volume-driven costs in the mine and mill operating costs, inflationary impacts, contractors and maintenance costs, costs associated with increased royalties mainly due to higher average gold price, partially offset by a change in inventory levels of $0.2 million.
Cost of sales for the first three quarters of 2026 totaled $139.6 million, a 29% increase compared to the same period in 2025. This was principally driven by an $11.2 million increase in mine and mill operating costs due to similar factors described above and increased royalties from higher gold prices, further elevated by an $8.6 million change in inventory levels.
Cash costs per ounce of gold sold increased by 53% to $1,798 (US$1,285) per ounce sold in Q3 2026 from $1,176 (US$853) per ounce sold in Q3 2025 largely due to a 25% decrease in ounces sold, inflationary impacts, contractors and maintenance costs. Similarly, cash costs per ounce of gold sold increased by 52% to $1,873 (US$1,352) per ounce sold in the first three quarters of 2026 from $1,233 (US$882) per ounce sold in the comparative period in 2025 due to increased cost of sales and a 15% decrease in ounces sold.
In Q3 2026, AISC per ounce of gold sold increased by 56% to $2,578 (US$1,843) from $1,657 (US$1,203) in Q3 2025, due to higher cash costs per ounce sold, a 31% increase in sustaining capital expenditures, and a 25% decrease in ounces sold.
During the first three quarters of 2026, AISC per ounce of gold sold increased by 37% to $2,507 (US$1,810) per ounce sold from $1,824 (US$1,304) per ounce sold in the same period in 2025, due to higher cash cost per ounce sold and a 15% decrease in ounces sold, partially offset by an 8% reduction in sustaining capital expenditures. Capital expenditures are expected to remain elevated in Q4 2026 as Eagle River advances deferred development and capital projects. Higher gold production in Q4 2026 is expected to partially offset the continued sustaining capital expenditures, resulting in lower AISC per ounce sold. Eagle River’s full-year AISC per ounce sold is expected to remain within its guidance range of US$1,525 – US$1,675.
Exploration Update
Expanding the 6 Central Zone
The 6 Central Zone continues to be a priority exploration area given its intermediate depth, proximity to existing mine infrastructure and geological similarities to the 300 Zone at comparable elevations. Drilling during the third quarter continued testing down-plunge opportunities, with recent results supporting the interpretation that the high-grade trend extends at depth. Infill and conversion drilling within existing block model domains was also completed in preparation for the Company’s year-end resource model updates.
Growing the 720 Falcon Zone
The 720 Falcon Zone remains a key area of focus given its shallow depth, proximity to existing mine infrastructure, down-plunge potential and opportunity for continuation further west where surface IP surveys have highlighted resistivity and chargeability anomalies. Infill and conversion drilling within existing block model domains was completed during the third quarter and are expected to be included in the Company’s year-end resource model updates.
Targeting Up-Plunge Continuity at the 800 Zone
Assay results from infill drilling targeting a gap in the interpreted up-plunge continuity of mineralization support the geological interpretation and potential continuity of the 800 Zone. These results, together with higher-grade intercepts from holes testing down-plunge extensions, have further highlighted the exploration potential of the 800 Zone and increased its priority within the exploration program. Follow-up drilling is planned for the fourth quarter to further evaluate the extent and continuity of mineralization.
Growth Drilling in the 700 Zone
Assay results from growth drilling in the shallow parts of the mine continued to demonstrate thickness and grades, confirming continuation of the mineralization. Infill drilling as part of conversion has commenced and will continue for the balance of the year.
Global Model and the 300 Zone
The global model is an important component of the mine’s exploration strategy, identifying opportunities to extend known mineralized zones, improve geological confidence and support future mineral resource growth and conversion. The global model is continuously updated as new geological, drilling, and other technical information becomes available. New prospective areas are added for both conversion and growth as the geological understanding of the Eagle River system evolves, while areas that have been sufficiently drill tested, or are no longer considered priorities based on technical or geological considerations, are reprioritized.
Global model targets are integrated into Eagle River’s ongoing underground drilling programs, with typically three to four of the mine’s five underground exploration drill rigs testing these areas. During the quarter, drilling continued across several global model targets in the deeper portions of the 300 Zone.
Surface Exploration
At the Eagle River Mine area, surface holes continued testing an area of mineralization to the east of No Name Lake, where historic widely spaced drill holes intersected mineralization. The surface holes were designed to infill and confirm continuation of No Name Lake mineralization. Results will be reported in the next quarter.
At 200 Zone, surface holes commenced a program testing the potential continuation of high-grade mineralization to the west and down plunge. Results will be reported next quarter.
At Dorset Main, Dorset West, and Cameron Iron Formation, drilling for geometallurgical sampling for leach and recovery test work, and deportment studies, was completed, with test work planned for next quarter.
Surface drilling continued at Mishi open pit, evaluating the down-plunge potential of mineralization, and expanding the continuation of near-surface mineralization as part of overall resource evaluation. Results are expected to be reported in Q4 2026.
Partial results were received from helicopter-supported scout holes drilled at Magnacon East to evaluate the sub-surface potential of quartz veins that returned high-grade assays from rock chip samples collected during semi-regional structural mapping. The assays to date support surface results, with full results to be reported next quarter.
Assay results are pending for helicopter-supported scout holes drilled at Feather River, located approximately 8 kilometres east of the Magnacon Mine, to evaluate the continuation of quartz veins and sulphide-rich horizons highlighted by previous work which included geologic mapping, local IP surveys, and scout drilling which returned anomalous intercepts.
The Mishi Deposit, Magnacon Deposit, Magnacon East target, and Feather River target are all located along the Mishibishu Deformation Zone, a 10 kilometre long under explored structural trend that remains prospective for hosting mineralization.
Kiena (Quebec, Canada)
Kiena is a high-grade underground gold mine located in Val-d’Or within the prolific Abitibi Greenstone Belt of northwestern Quebec. The operation is 100% owned and operated by Wesdome Gold Mines Ltd. and features a fully permitted processing mill with a capacity of approximately 2,040 tonnes per day.
Operational and Financial Results
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |
| Ore milled (tonnes) | 63,797 | 50,147 | 180,962 | 149,136 |
| Head grade (g/t) | 8.2 | 10.2 | 9.8 | 10.6 |
| Average mill recoveries (%) | 98.5 | 98.7 | 98.7 | 98.8 |
| Gold production (oz) | 16,529 | 16,169 | 56,012 | 50,031 |
| Gold sold (oz) | 17,300 | 14,700 | 57,350 | 51,200 |
| Production costs per tonne milled1 ($) | 492 | 463 | 532 | 488 |
| Costs per oz of gold sold ($/oz) | ||||
| Operating cash margin1 | 4,165 | 3,289 | 4,552 | 3,060 |
| Cost of sales | 1,813 | 1,580 | 1,679 | 1,423 |
| Cash costs1 | 1,805 | 1,576 | 1,666 | 1,418 |
| All-in sustaining costs1 | 2,396 | 2,615 | 2,309 | 2,326 |
| Costs per oz of gold sold (US$/oz) | ||||
| Operating cash margin1 | 2,977 | 2,387 | 3,287 | 2,187 |
| Cost of sales | 1,296 | 1,147 | 1,212 | 1,017 |
| Cash costs1 | 1,290 | 1,144 | 1,204 | 1,014 |
| All-in sustaining costs1 | 1,713 | 1,899 | 1,667 | 1,663 |
| In $000s, except per unit and per share amounts | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 |
| Gold revenue from mining operation | 103,277 | 71,512 | 356,631 | 229,241 |
| Cost of sales | ||||
| Mining | 18,672 | 16,140 | 60,179 | 46,932 |
| Processing | 4,286 | 3,686 | 12,932 | 11,037 |
| Site administration | 7,413 | 5,767 | 22,159 | 16,441 |
| Change in inventories | 998 | (2,362) | 1,003 | (1,571) |
| 31,369 | 23,231 | 96,273 | 72,839 | |
| Silver revenue | (140) | (64) | (700) | (245) |
| Total cash costs | 31,229 | 23,167 | 95,573 | 72,594 |
| Cost of sales per ounce of gold sold | 1,813 | 1,580 | 1,679 | 1,423 |
| Cash cost per ounce of gold sold1 | 1,805 | 1,576 | 1,666 | 1,418 |
| Operating cash margin1 | 72,048 | 48,345 | 261,058 | 156,647 |
| All-in sustaining costs1 | ||||
| Sustaining mine exploration and development | 6,214 | 7,052 | 19,805 | 20,600 |
| Sustaining mine capital equipment | 891 | 3,294 | 4,984 | 13,559 |
| Sustaining tailings management facility | – | 1,498 | 456 | 2,326 |
| Corporate and general allocation | 3,060 | 3,435 | 11,460 | 9,998 |
| Payment of lease liabilities | 58 | – | 142 | – |
| 41,452 | 38,446 | 132,420 | 119,077 | |
| All-in sustaining costs per ounce of gold1 | 2,396 | 2,615 | 2,309 | 2,326 |
| Cost of sales per tonne milled | 492 | 463 | 532 | 488 |
| Production costs per tonne milled1 | 492 | 463 | 532 | 488 |
| Capital expenditures | 29,210 | 26,306 | 83,661 | 77,414 |
Operating Highlights
In Q3 2026, Kiena produced 16,529 ounces, a 2% increase from 16,169 ounces in Q3 2025. Ore milled increased by 27%, reflecting additional tonnes from Presqu’île, which mined its first stope in July 2026, partially offset by lower Kiena Deep production due to the impact of seasonal workforce availability on operations in the quarter. The increase in tonnage was partially offset by a 20% decrease in average grade compared with Q3 2025 reflecting the addition of development ore from Presqu’île and the deferral of two higher-grade stopes into Q4 2026. Grade continues to reconcile well at Kiena and the Presqu’île Zone is expected to ramp up through Q4 2026, with commercial production anticipated in Q1 2027. Kiena remains focused on adherence to the mining sequence, implementing its operating model and addressing maintenance performance and workforce availability to ramp up production in Q4 2026.
Production in the first three quarters of 2026 totaled 56,012 ounces compared to 50,031 ounces in the first three quarters of 2025, reflecting contributions from Presqu’île together with increased mine sequencing flexibility at Kiena Deep from the addition of a new mining horizon. With the flexibility provided by mining two zones in Kiena Deep, the addition of Presqu’île stope ore augmented by two stopes deferred from Q3 to Q4 2026, Kiena is expected to have a strong fourth quarter.
Production costs per tonne increased to $492 in Q3 2026 from $463 in Q3 2025, due to inflationary pressure on wages, supplies, fuel, and insurance that have been broadly felt across the industry, as well as higher maintenance and contractor costs. Production costs per tonne increased to $532 in the first three quarters of 2026 from $488 in the comparative prior year period, primarily driven by similar factors, partially offset by higher tonnage throughput.
Financial Highlights
In Q3 2026, Kiena’s gold revenue increased by 44% to $103.3 million from $71.5 million in Q3 2025, primarily due to a higher average realized price per ounce of gold sold and an 18% increase in ounces of gold sold. In the first three quarters of 2026, Kiena’s gold revenue increased by 56% to $356.6 million from $229.2 million in the comparative period in 2025, due to the higher average realized price of gold and a 12% increase in ounces sold.
Cost of sales in Q3 2026 was $31.4 million, an increase of 35% over the comparative period in 2025 primarily due to a $3.1 million increase in volume related mine operating costs, higher maintenance and contractor costs, and inflationary pressures. Cost of sales in the first three quarters of 2026 was $96.3 million, an increase of 32% over the comparative period in 2025 primarily due to a $15.1 million increase resulting from similar factors.
Cash costs per ounce of gold sold in Q3 2026 were $1,805 (US$1,290), an increase of 15% compared to $1,576 (US$1,144) in Q3 2025 primarily due to similar factors noted in cost of sales. Cash costs per ounce of gold sold in the first three quarters of 2026 were $1,666 (US$1,204), an increase of 18% compared to $1,418 (US$1,014) in the comparative period in 2025 primarily due to higher mine unit operating costs impacted by higher maintenance and contractor costs.
AISC per ounce of gold sold decreased by 8% in Q3 2026 to $2,396 (US$1,713) from $2,615 (US$1,899) in Q3 2025 due to a 40% decrease in sustaining capital expenditures due to timing and higher ounces sold. AISC per ounce of gold sold decreased by 1% in the first three quarters of 2026 to $2,309 (US$1,667) from $2,326 (US$1,663) in the first three quarters of 2025 due to a 12% increase in ounces sold and a decrease in sustaining capital expenditures, partially offset by higher operating costs. Sustaining capital is expected to remain elevated in Q4 2026 as additional development and key projects continue to advance alongside planned production ramp-up, with full-year 2026 guidance remaining on track.
Progress at Presqu’île Zone
Development at the Presqu’île Zone progressed as anticipated during Q3 2026, with the first stope blasted in mid-July and production ramping up throughout the quarter. The production ramp-up is expected to continue through Q4 2026, with commercial production anticipated in Q1 2027.
Ramp Breakthrough
Kiena achieved a major milestone in Q2 2026 with the breakthrough of the new ramp to surface, establishing continuous ramp access and providing greater flexibility for underground material and equipment movement as mining activity increases. Completion of the ramp enables the ongoing ventilation expansion project, which is expected to double mine ventilation capacity and support increased mining activity and future productivity improvements.
Exploration Update
134 Level
Growth drilling from the 134-level exploration drift continued to evaluate the recently discovered Norbenite Footwall mineralized zone, with drill holes designed to better define its geometry, assess the continuity of mineralization and guide future drilling. Assay results are expected to be reported in the next quarter.
A combination of conversion and growth drilling from the 134-level, with two rigs targeting the ZA lenses at the top of the Footwall Zone lenses, as well as deeper inferred high-grade resource conversion. The program is focused on improving geological confidence in known mineralized zones to support potential Mineral Resource conversion, while also testing opportunities for further extensions. Results will be reported in the next quarter.
109-Level Exploration Drift
Exploration drilling from the 109-level continued to advance the VC Zone and the recently reported VZ Zone and evaluate the broader mineralized potential of this area. The rig was relocated down to the 134-level at the end of the quarter to continue the Norbenite Footwall drilling program. All Q3 assay results for the VC and VZ Zones have been received, with the most significant intercepts included in the September press release. An additional rig is planned to be mobilized back to the 109-level in early Q4 2026 to resume the VC and VZ growth and conversion drilling program.
33-Level Exploration Drift
Drilling on 33-Level was significantly slowed down during the quarter, as crews were re-tasked to other rigs as part of seasonal leave schedules. Drilling recommenced late in the quarter, and results will be reported in Q4 2026. For next quarter, the rig will be moved toward Shawkey 22 for a growth focused drill program to increase mineral inventory.
Presqu’île
Drilling shifted from delineation to growth drilling late in Q3. The current program aims to test extensions of the main PI2 lens within the 60-to-100-metre depth tranche below surface, testing the up-dip continuation of the mineralized lenses in an area that is currently outside of mineral reserve.
Surface Exploration
Barge drilling programs at Dubuisson, Tarmac/Siscoe, Northwest, and Wesdome are expected to be completed in early Q4 2026 prior to lake freeze-up. Results are expected to be reported in Q1 2027.
Following the completion of the Tarmac drill program, the barge rig was moved northwest of Siscoe Island to complete the first hole beneath the historical Siscoe Mine trend.
Drilling with a land-based rig continued at Shawkey South/Shawkey 10, evaluating the bulk tonnage style of mineralization at depth. Initial holes were successful with results recently reported. Further drilling is in progress, and a further two rigs will join and expand the drill program in Q4 2026 to expedite the delineation of the geometry and scale of the mineralized potential.
Outlook
2026 Consolidated Guidance Commentary
The following updates the Company’s 2026 guidance as of the date of this document.
Consolidated Gold Production: 180,000 to 205,000 ounces (midpoint 192,500 ounces)
Depreciation and Depletion: $100 million (previously $130 million)
Corporate and General
Cash Costs Per Ounce Sold: US$1,050 to US$1,150 (midpoint: US$1,100)
All-in Sustaining Costs Per Ounce Sold: US$1,525 to US$1,700 (midpoint: US$1,613)
Total Capital Investments: $205 million
The following table outlines Wesdome’s updated 2026 guidance compared to its initial guidance set forth in the Company’s press release dated January 20, 2026:
| 2026 Guidance | Eagle River | Kiena | Consolidated Guidance | |||||||
| Previous Jan 20, 2026 | Updated Aug 13, 2026 | Previous Jan 20, 2026 | Updated Aug 13, 2026 | Previous Jan 20, 2026 | Updated Aug 13, 2026 | |||||
| Production | ||||||||||
| Head grade | (g/t) | 13.0 – 14.0 | 11.5 – 12. | 8 | 8.0 – 9.5 | 10.0 – 12.0 | 10.0 – 11.0 | |||
| Gold production | (oz) | 105,000 – 115,000 | 105,000 – 115,000 | 75,000 – 90,000 | 75,000 – 90,000 | 180,000 – 205,000 | 180,000 – 205,000 | |||
| Operating Costs | ||||||||||
| Depreciation and depletion | ($M) | $55 | $40 | $75 | $60 | $130 | $100 | |||
| Corporate and general1 | ($M) | $15 | $15 | $15 | $15 | $30 | $30 | |||
| Exploration and evaluation2 | ($M) | $15 | $15 | $15 | $15 | $30 | $30 | |||
| Cash costs3,4 | (US$/oz) | $1,050 – $1,150 | $1,050 – $1,150 | $1,025 – $1,175 | $1,025 – $1,175 | $1,050 – $1,150 | $1,050 – $1,150 | |||
| All-in sustaining costs3,4 | (US$/oz) | $1,525 – $1,675 | $1,525 – $1,675 | $1,525 – $1,750 | $1,525 – $1,750 | $1,525 – $1,700 | $1,525 – $1,700 | |||
| Capital Investment3 | ||||||||||
| Sustaining capital3 | ($M) | $60 | $60 | $50 | $50 | $110 | $110 | |||
| Growth capital3 | ($M) | $45 | $45 | $50 | $50 | $95 | $95 | |||
| Total capital investment | ($M) | $105 | $105 | $100 | $100 | $205 | $205 | |||
Consolidated Three-Year Outlook
| 2026 | 2027 | 2028 | |
| Gold Production (ounces) | |||
| Eagle River | 105,000 – 115,000 | 100,000 – 120,000 | 100,000 – 120,000 |
| Kiena | 75,000 – 90,000 | 85,000 – 100,000 | 85,000 – 110,000 |
| Total Gold Production | 180,000 – 205,000 | 185,000 – 220,000 | 185,000 – 230,000 |
| All-in Sustaining Costs (US$/oz) | 1,525 – 1,700 | 1,600 – 1,750 | |
Gold Production: Consolidated gold production is expected to increase from 180,000 to 205,000 ounces in 2026 to 185,000 to 230,000 ounces in 2028, reflecting stable production at Eagle River and growing contribution from Kiena.
At Eagle River, production is expected to be 100,000 to 120,000 ounces per year in 2027 and 2028, supported by increased mill utilization and a more consistent grade profile, with additional potential upside from material not included in the reserve-based mine plan.
At Kiena, production is expected to increase to 85,000 to 110,000 ounces by 2028, supported by improved execution at Kiena Deep, greater flexibility across multiple mining levels, including the Presqu’île Zone.
Margin Resilience: Consolidated AISC per ounce of gold sold is expected to be US$1,600 to US$1,750 per ounce sold in 2027 and 2028, inclusive of expected capitalized sustaining exploration, study costs, corporate G&A, and other corporate-level adjustments not included in the reserve-based site-level cost profiles presented in the technical reports.
About Wesdome
Wesdome is a Canadian-focused gold producer with two high-grade underground assets, the Eagle River mine in Ontario and the Kiena mine in Québec. The Company’s primary goal is to responsibly leverage its operating platform and high-quality brownfield and greenfield exploration pipeline to build a growing value-driven gold producer.
Technical Disclosure
The technical and geoscientific content of this press release have been reviewed, and approved by Peter Gula, P. Eng and General Manager of Eagle River Mine (wholly owned by Wesdome), a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
76m at 1.00% Cu and 32m at 1.48% Cu within 212m at 0.50% Cu from ... READ MORE
Fortuna Delivers Free Cash Flow From Operations of $90.8 million ... READ MORE
Gold Royalty Corp. (NYSE American: GROY) is pleased to announce t... READ MORE
Record Production and Earnings Drive Continued Significant Shareholder R... READ MORE