The Prospector News

Vangold Mining: Robert Sedgemore Engaged as Director of Mill Commissioning

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Vangold Mining: Robert Sedgemore Engaged as Director of Mill Commissioning

 

 

 

 

 

Additional Team Leaders Added

VanGold Mining Corp. (TSX-V:VGLD) is pleased to announce that Robert Sedgemore has joined the VanGold team in Guanajuato, Mexico as Director of Mill Commissioning.

 

As VanGold moves swiftly to placing its recently purchased El Cubo mill back into production, the Company has identified and retained a number of key personnel who will help lead our team on the ground. These three important hires are just some examples that exemplify VanGold’s desire to attract top talent from all mining disciplines, with an emphasis on hiring locally wherever possible and appropriate.

 

Robert Sedgemore – Director of Mill Commissioning

 

Robert is a process engineer with 25-years of international experience in the mining industry involved in the design, construction, commissioning, and optimization of mineral processing plants in multiple jurisdictions worldwide including extensive experience in South America. He has held various senior management and technical roles with major mining companies and investment banking groups including BHP (Escondida), Placer Dome, Outokumpu, and IFC – The International Finance Corporation, a division of The World Bank.

 

Robert was introduced to VanGold by a potential financing group when he was chosen by them to evaluate our plans for restarting El Cubo. His excitement regarding putting the mill back online using material from both El Cubo and El Pinguico, as well as additional growth opportunities in the Guanajuato area fuelled his desire to join our team immediately.

 

James Anderson, VanGold Chairman and CEO said: “Rob has worked for some of the biggest and best companies and mine operations on the planet. He has chosen to relocate from his home in Chile to join our team in Guanajuato – and it cannot be overstated how excited we are about that prospect.”

 

Robert studied Instrument Engineering at the Haileybury School of Mines and has also been a Marine Engineer with the Royal Canadian Navy.

 

VanGold’s Advisor Tookie Angus commented: “VanGold’s ability to attract high quality mining talent to its El Cubo / El Pinguico recommissioning is very impressive. It’s the start-up of these operations that is so critical, and VanGold is well on its way to putting the people in place that can execute a seamless recommencement of mining operations.”

 

Monica Seleme – Environmental Services Manager

 

With a degree in Environmental Systems Engineering from the Universidad Politécnica de Durango, Monica joins VanGold after six years with First Majestic Silver Corp. There she was part of a team that managed all aspects of environmental strategy and compliance. Monica designed and implemented an environmental testing program that included air quality, water quality and tailings. Monica was also involved in plant wastewater operation and maintenance. Other recent activities were to prepare and execute an in-house environmental training program and to conduct reforestation projects, designing and executing plant and soil conservation programs. Monica will be instrumental in leading VanGold’s ongoing efforts to comply with and exceed all Mexican local, state, and federal environmental standards.

 

Pedro Delgado – Mine Manager – El Cubo

 

Pedro has a degree in Mining Engineering from the Faculty of Mines, Metallurgy and Geology at the University of Guanajuato. Pedro is a natural leader with an abundance of experience in both underground and open pit mining operations in different states within the Mexican Republic. Pedro is particularly expert in project commencement and the re-starting of operations. As an example, while in charge of the preparation and start-up of the El Castillo Mine in the state of Durango for Castle Gold Corp., Pedro lead teams of from 50 to 400 mine workers with different skills sets – effortlessly leading both unionized and non-unionised workers toward a successful mining operation.

 

Most recently, Pedro worked with Fresnillo PLC as the General Superintendent of their ‘New Guanajuato Project’ comprising their Las Torres, Peregrina, San Cosme and San Gregorio assets in the Guanajuato region, and including the rehabilitation of the Las Torres processing plant.

 

About VanGold Mining Corp.

 

VanGold Mining is an exploration and development company engaged in reactivating past producing silver and gold mines near the city of Guanajuato, Mexico. The Company’s El Cubo and El Pinguico projects are significant past producers of both silver and gold located in close proximity to Guanajuato city, and to each other. The Company is currently focused on refurbishing the El Cubo mill and commencing production from the combined El Cubo / El Pinguico operation, as well as delineating additional silver and gold resources through underground and surface drilling on its projects located in this 480-year-old mining camp.

 

Hernan Dorado Smith, a director of VanGold and a “qualified person” as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects, has approved the scientific and technical information contained in this news release.

 

Posted April 28, 2021

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News