
ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0) reported assay results from the Salvador Target as part of the 2023 Phase 1 drill program at ValOre’s 100%-owned Pedra Branca Platinum Group Elements Project in northeastern Brazil.
“PGE assays from all four core holes received to date at Salvador confirm consistent, near-surface, high-grade PGE mineralization at this new discovery,” stated Thiago Diniz, Exploration Manager, ValOre Metals Corp. “The evolution of Salvador from concept to discovery demonstrates ValOre’s proven exploration methodology and the team’s ability to identify and advance significant resource targets property-wide. We look forward to continuing to grow Salvador through drilling for potential inclusion in our next mineral resource update.”
Salvador PGE Target Highlights
Table 1: Core Assay Highlights (g/t 2PGE+Au) Reported Today
Target | Hole ID | From (m) | To (m) | Length (m)* | 2PGE+Au (g/t) |
Salvador | DD23MES02 | 64.00 | 142.95 | 78.95 | 0.96 |
64.50 | 106.00 | 41.50 | 1.34 | ||
Salvador | DD23MES03 | 47.15 | 96.75 | 49.60 | 1.25 |
55.20 | 71.00 | 15.80 | 2.22 | ||
Salvador | DD23MES04 | 77.15 | 123.20 | 46.05 | 1.96 |
79.90 | 81.45 | 1.55 | 5.23 | ||
88.65 | 98.65 | 10.00 | 5.02 |
*Reported core assay interval lengths are estimated to represent 95-100% of true width for the angled hole DD23MES03 and 65 and 80% for the vertical holes DD23MES02 and DD23MES04, respectively.
2023 Pedra Branca Drill Program Summary
Table 2: 2023 Pedra Branca Drilling Totals and Assay Status by Zone
Target | Total Drilled (m) | # Holes | # Holes w/ UMs | Total UMs (m) | Core Samples | Assays Received | Assays Pending |
Galante | 790 | 11 | 11 | 190 | 384 | 384 | 0 |
Tróia | 1,029 | 9 | 6 | 72 | 188 | 188 | 0 |
Nambi | 665 | 6 | 6 | 74 | 203 | 185 | 18 |
Ipueiras | 228 | 4 | 3 | 27 | 83 | 34 | 49 |
Massapê | 380 | 4 | 3 | 19 | 48 | 48 | 0 |
Cedro | 545 | 2 | 1 | 4 | 14 | 14 | 0 |
Trapiá 1 | 1,326 | 4 | 4 | 175 | 272 | 95 | 177 |
Trapiá South | 133 | 1 | 1 | 4 | 36 | 36 | 0 |
Salvador | 1,056 | 8 | 7 | 265 | 397 | 310 | 87 |
Total | 6,152 | 49 | 42 | 830 | 1,625 | 1,294 | 331 |
Figure 1: Pedra Branca project property map, highlighting locations of the 2023 drill targets and current resource zones.
Figure 2: Plan map and cross sections along the main zone at Salvador. Assays reported for four of seven UM-bearing holes drilled. Highlights reported here include drill holes DD23MES02, DD23MES03 and DD23MES04, and trenches TR23MES03 and TR23MES04. Assays pending for the remaining holes.
Figure 3: Core photographs of PGE-bearing chromitites and peridotites intersected at Salvador. Photo on the left showing a PGE-rich chromitite portion of the high-grade interval at DD23MES04 (10 m at 5.02 g/t 2PGE+Au from 88.65 m).
Quality Assurance/Quality Control
CLICK HERE for a summary of ValOre’s policies and procedures related to QA/QC and grade interval reporting.
Qualified Person
The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Thiago Diniz, P.Geo., ValOre’s QP and Exploration Manager.
About ValOre Metals Corp.
ValOre Metals Corp. is a Canadian company with a team aiming to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration and innovation.
ValOre’s Pedra Branca Platinum Group Elements Project comprises 52 exploration licenses covering a total area of 56,852 hectares (140,484 acres) in northeastern Brazil. At Pedra Branca, 7 distinct PGE+Au deposit areas host, in aggregate, a 2022 NI 43-101 inferred resource of 2.198 Moz 2PGE+Au contained in 63.6 Mt grading 1.08 g/t 2PGE+Au. ValOre’s team believes the Pedra Branca project has significant exploration discovery and resource expansion potential. (CLICK HERE to download 2022 technical report* and CLICK HERE for news release dated March 24, 2022).
*The 2022 Technical Report is entitled “Independent Technical Report –Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil” was prepared as a National Instrument 43-101 Technical Report on behalf of ValOre Metals Corp. with an effective date of March 08, 2022. The 2022 Technical Report by Independent qualified persons, Fábio Valério (P.Geo.) and Porfirio Cabaleiro (P.Eng.), of GE21, commissioned to complete the mineral resource estimate while Chris Kaye of Mine and Quarry Engineering Services Inc. (MQes), was commissioned to review the metallurgical information
Commerce Resources Corp. (TSX-V: CCE) (FSE: D7H0) is pleased to... READ MORE
North Bay Resources, Inc. (OTC: NBRI) is pleased to announce a re... READ MORE
NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE
G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to annou... READ MORE
Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE