The Prospector News

Usha Resources Confirms Presence of a Lithium-Cesium-Tantalum System at the Mead Lithium Pegmatite Project and Receives Drill Permit

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Usha Resources Confirms Presence of a Lithium-Cesium-Tantalum System at the Mead Lithium Pegmatite Project and Receives Drill Permit

 

 

 

 

 

Usha Resources Ltd.  (TSX-V: USHA) (OTCQB: USHAF) (FSE: JO0), a North American mineral acquisition and exploration company focused on the development of drill-ready battery metal projects, is pleased to announce that it has confirmed the presence of a fertile lithium-cesium-tantalum system at its Mead Project located 25 minutes south of Hearst, Ontario. The Company is also pleased to announce that it has received its exploration permit for the Mead Project from the Ontario Ministry of Mines.

 

Highlights:

  • A two day site visit has been completed which identified beryl-pegmatites confirming the presence of a lithium-cesium-tantalum system. The identification of beryl is a key finding that confirms the potential for Mead to contain highly evolved LCT-pegmatites that could bear spodumene, the key lithium-bearing mineral in pegmatites.
  • The project comprises 1,001 hectares located adjacent on both east/west boundaries to Brunswick Resources’ Hearst Project, where it has an on-going drill program to assess the spodumene-bearing Decoy pegmatite and other pegmatites along trend to the west/southwest towards the Mead Property up to 2 kilometres from the claim boundary.
  • An exploration permit has been approved for a five (5) hole drilling program.
  • The project was recently optioned for $5,000 and 50,000 shares and the Company has the right to earn 100% through a total payment of $62,500 and 412,500 shares over 3 years.

 

The Company completed a successful two day site visit where it identified numerous minerals that are indicative of an LCT-system including garnet, tourmaline and most importantly, beryl. Given Mead’s location within the same granite-sedimentary belt as Decoy, the identification of beryl is a key finding that confirms the potential for Mead to contain highly evolved LCT-pegmatites that could bear spodumene, the key lithium-bearing mineral in pegmatites.

 

The Mead Project comprises 1,001 hectares located adjacent on both east/west boundaries to Brunswick Resources’ Hearst Project, where it has an on-going drill program to assess the spodumene-bearing Decoy pegmatite and other pegmatites along trend to the west/southwest towards the Mead Property up to 2 kilometres from the claim boundary. The Mead Project was recently optioned for $5,000 and 50,000 shares and the Company has the right to earn 100% through a total payment of $62,500 and 412,500 shares over 3 years.

 

Based on its successful initial visit, the Company plans on making exploration at Mead a focus with a comprehensive range of fieldwork activities, including prospecting, mapping, soil and further visible outcrop sampling that will ultimately lead into its now permitted drill program.

 

“Due to snow cover, at the time, there was very limited exposure of pegmatite outcrops, so we are thrilled with the findings from our initial visit. This success validates our strategy and belief in building out our lithium pegmatite portfolio,” said Deepak Varshney, CEO of Usha Resources. “Our focus has always been to acquire quality projects at the right price and to be able to add an asset like Mead and turn it into a drill-ready lithium project this quickly is a testament to the quality of our technical team. We firmly believe every asset we acquire has the ability to be the next major discovery in Ontario’s growing lithium hotbed and we look forward to advancing this ourselves or as part of a potential partnership beneficial to our shareholders.”

 

Qualified person

 

The technical content of this news release has been reviewed and approved by Mr. Andrew Tims, P.Geo., a qualified person as defined by National Instrument 43-101.

 

About Usha Resources Ltd.

 

Usha Resources Ltd. is a North American mineral acquisition and exploration company focused on the development of quality battery and precious metal properties that are drill-ready with high-upside and expansion potential. Based in Vancouver, BC, Usha’s portfolio of strategic properties provides target-rich diversification and consist of Jackpot Lake, a lithium brine project in Nevada; White Willow, a lithium pegmatite project in Ontario that is the flagship among its growing portfolio of hard-rock lithium assets; and Lost Basin, a gold-copper project in Arizona. Usha trades on the TSX Venture Exchange under the symbol USHA, the OTC Exchange under the symbol USHAF and the Frankfurt Stock Exchange under the symbol JO0.

 

 


Figure 1 – The Mead Project comprises 1,001 hectares located adjacent on both east/west boundaries to Brunswick Resources’ Hearst Project, where it has an on-going drill program to assess the spodumene-bearing Decoy pegmatite and other pegmatites along trend to the west/southwest towards the Mead Property up to 2 kilometres from the claim boundary. (CNW Group/Usha Resources Ltd.)

 

Posted June 1, 2023

Share this news article

MORE or "UNCATEGORIZED"


Grid Metals Intersects High-Grade Lithium Values Including 4.7% Li2O At Maiden Falcon West Drill Program

Grid Metals Intersects High-Grade Lithium Values Including 4.7% L... READ MORE

April 29, 2024

GR Silver Mining Enhances Financial Position Through Marlin Gold Disposition

GR Silver Mining Ltd. (TSX-V: GRSL) (OTCQB: GRSLF) (FRANKFURT: G... READ MORE

April 29, 2024

Arizona Sonoran Drills 1,206 ft (368 m) of 0.56% CuT at MainSpring and Completes Initial MainSpring Inferred Drill Program

Arizona Sonoran Copper Company Inc. (TSX:ASCU) (OTCQX:ASCUF) rep... READ MORE

April 29, 2024

IsoEnergy and Ya'thi Néné Lands and Resources Announce Collaboration Agreement

IsoEnergy Ltd. (TSX-V: ISO) (OTCQX: ISENF) and the Ya’thi... READ MORE

April 29, 2024

Abitibi Metals Drills 19.75 Metres At 1.35% CuEq In Western Extension With 500 Metre Step-out At The B26 Polymetallic Deposit

Highlights: The Company has received results from drillholes 1274... READ MORE

April 29, 2024

Copyright 2024 The Prospector News