The Prospector News

Uranium Energy Corp Intersects 11.4% eU3O8 over 2.4 metres at Roughrider North Discovery, 850 meters Northeast of the Roughrider deposit

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Uranium Energy Corp Intersects 11.4% eU3O8 over 2.4 metres at Roughrider North Discovery, 850 meters Northeast of the Roughrider deposit

 

 

 

 

 

Uranium Energy Corp (NYSE American: UEC) is pleased to report results from the ongoing drill campaign at its Roughrider Project located in Northern Saskatchewan, Canada.

 

Drilling 850 metres northeast of the Roughrider Project Deposit has intersected additional high-grade uranium mineralization:

 

  • Drill hole RR-961 grades 11.4% eU3O8 over 2.4 metres with a high-grade sub interval that is 24.9% eU3O8 over 1.0 metres.
  • RR-961 followed-up RR-940 that was reported on August 20, 2024 and graded 12.7% eU3O8 over 7.2 metres(1). RR-961 is 15 metres along strike to the east of RR-940.
  • An additional 20 drill holes remain in the drill program and further results will be forthcoming as the program progresses.

 

UEC’s ongoing drill program on the Project continues to explore along the north trend. To date uranium mineralization at Roughrider North has been encountered along ~200 metres of strike length, with the high-grade core of the area now measuring ~55 metres of strike with this most recent intersection. The high-grade uranium mineralization at Roughrider North remains open to the east and west.

 

About Roughrider North

 

The Roughrider North discovery has been identified along an exploration trend that is parallel to the Roughrider Project. The uranium mineralization thus far at the Roughrider North Discovery is entirely in the basement about 250 metres below the surface.

 

Chris Hamel, Vice President Exploration, Canada, stated: “The on-going drill campaign at Roughrider North has successfully identified additional high-grade mineralization along strike of what was reported in August. The current drill campaign has about 20 drill holes remaining and can be extended further into the fall if necessary to continue the delineation of this uranium mineralization. Drill hole RR-961 expands the high-grade core of this discovery and should help guide the field team to further success in the area.”

 

Table 1, outlined below, details the equivalent uranium intersections (“eU3O8″) from select drill holes from the 2024 summer campaign. Figure 1 shows the immediate Roughrider Project area in the Northern part of Athabasca Basin, and Figure 2 illustrates a wider picture of where the Roughrider Project is located within the Athabasca Basin.

 

Table 1: Roughrider Summer Drilling Program Equivalent Grades

 
From
(m)
To (m) Width
(m)
Avg.
Grade
(eU3O8)
Cut-off
Grade
(eU3O8)
GT
RR-909 244.3 264.8 20.6 0.07 0.05 1.4
RR-910 250.3 305.5 55.2 0.52 0.05 28.8
incl. 250.3 255.4 5.1 1.63 0.05 8.3
incl. 297.6 305.5 7.9 2.53 0.05 20.0
RR-913 262.8 310.3 47.5 0.47 0.05 22.1
incl. 307.8 309.9 2.1 6.81 1.00 14.3
RR-919 304.1 307.1 3.0 2.23 0.05 6.7
incl. 304.4 306.2 1.8 3.51 1.00 6.3
RR-925 239.8 313.0 73.3 0.11 0.05 7.8
incl. 244.3 246.1 1.9 1.83 1.00 3.5
RR-929 291.1 300.2 9.1 0.79 0.05 7.2
incl. 291.5 292.3 0.8 1.38 1.00 1.1
incl. 294.2 295.0 0.8 2.76 1.00 2.2
RR-930 282.8 288.4 5.6 0.18 0.05 1.0
RR-933 242.2 244.7 2.5 0.0936 0.05 0.2
230.6 231.1 0.5 0.08 0.05 0.0
249.9 264.2 14.3 3.00 0.05 42.8
incl. 251.9 262.2 10.3 4.06 1.00 41.8
incl. 260.4 260.8 0.4 14.68 10.00 5.9
RR-934 316.2 318.1 1.9 0.22 0.05 0.4
327.1 328.4 1.3 0.07 0.05 0.1
RR-935 319.1 320.2 1.1 0.05 0.05 0.1
324.1 327.9 3.8 0.10 0.05 0.4
RR-937 313.8 315.7 1.9 0.64 0.05 1.2
incl. 314.8 315.4 0.6 1.44 1.00 0.9
RR-938 322.4 323.2 0.8 0.32 0.05 0.3
RR-940 271.1 284.6 13.5 6.96 0.05 93.9
incl. 271.2 283.4 12.2 7.69 0.10 93.8
incl. 273.2 280.4 7.2 12.71 1.00 91.5
incl. 281.9 282.5 0.6 1.99 1.00 1.2
RR-945 270.8 281.3 10.5 3.17 0.05 33.2
incl. 271.7 280.8 9.1 3.61 1.00 32.9
incl. 273.6 273.9 0.3 10.62 10.00 3.2
incl. 277.6 278.2 0.6 15.18 10.00 9.1
RR-948 292.4 293.5 1.1 0.62 0.05 0.7
incl. 292.9 293.1 0.2 1.10 1.00 0.2
RR-949-1 255.6 261.6 6.0 0.14 0.05 0.8
incl. 255.6 257.3 1.7 0.14 0.05 0.2
incl. 259.8 261.6 1.8 0.33 0.05 0.6
RR-950 266.7 268.1 1.4 0.27 0.05 0.4
RR-954 228.0 228.7 0.7 0.05 0.05 0.0
278.5 280.1 1.6 0.18 0.05 0.3
294.8 296.9 2.1 0.45 0.05 0.9
RR-958 266.9 269.5 2.6 0.20 0.05 0.5
RR-961 330.1 332.5 2.4 11.40 0.05 27.3
incl. 330.5 332.1 1.6 16.93 1.00 27.1
incl. 330.8 331.8 1.0 24.88 10.00 24.9
*Due to the preliminary nature of these results, true thicknesses have not yet been estimated.

 

About Canada’s Athabasca Basin

 

The Athabasca Basin is a world-class uranium district in the northern portion of the provinces of Saskatchewan and Alberta in Canada, occupying an area of about 100,000 square kilometres. The unique geology of the Athabasca Basin often results in deposit grades that exceed the world average of uranium deposits of 0.2% U3O8 by up to 100 times.

 

All of Canada’s current uranium production occurs from the mines located in the Athabasca Basin. According to the World Nuclear Association, the Athabasca Basin was responsible for producing 15% of the world’s uranium production in 2022.

 

Uranium mineralization in the Athabasca Basin occurs in fault structures that penetrate the interface between the sandstone and underlying basement rocks. Uranium can be found at the interface, known as the unconformity, or up to several hundreds of metres below the unconformity surface in the underlying basement rock and fault structures.

 

The uranium concentrations in the holes presented above from the radiometric equivalent uranium grade denoted as eU3O8, were determined in-situ within the drill hole. For more information on REGs please see the “About Radiometric Equivalent Grades” section below.

 

About Radiometric Equivalent Grades

 

The eU3O8 grades were estimated in-situ within the drill holes using calibrated down-hole radiometric gamma probes lowered down into the hole. This is a measuring method commonly used by uranium explorers and miners in the Athabasca Basin. The probe records the amount of radioactivity present in the rock adjacent to the probe as it moves up and down the hole.

 

The standard and shielded probes were calibrated prior to the commencement of the current drill program at the Saskatchewan Research Council’s test pit facility in Saskatoon, Saskatchewan, and the Hi-Flux probes are calibrated at Alpha Nuclear in Saskatoon. Using down-hole probes to calculate radiometric equivalent grades is a common practice used by uranium mining companies in the Athabasca Basin. Down-hole probes can accurately measure uranium concentration by measuring the light flashes that occur every time the probe’s scintillator is struck by a gamma radiation particle emitted from uranium crystals. The number of light flashes are ‘counted’ by a photomultiplier tube. Due to a process called ‘saturation’ that occurs when light emitted by the probe’s scintillator overwhelms the photomultiplier tube’s ability to ‘count’ individual light flashes, it can sometimes be difficult to accurately determine radiometric equivalent grades in high-grade intervals.

 

Samples from all holes have been collected for assay analysis to confirm these equivalent grades. The samples will be analyzed at SRC’s Geoanalytical Laboratory in Saskatoon, with results expected in the coming weeks.

 

About the Roughrider Uranium Project

 

The Roughrider Project is a uranium project located in the eastern Athabasca Basin of northern Saskatchewan, Canada; one of the world’s premier uranium mining jurisdictions. The Project is located approximately 13 kilometres west of Orano’s McClean Lake Mill, near UEC’s existing Athabasca Basin properties. The depth to mineralization at the project is approximately 200 metres and hosted primarily in the basement rocks below the unconformity.

 

Qualified Persons and Data Acquisition

 

The technical information in this news release has been reviewed and approved by Chris Hamel, P.Geo., UEC’s Vice President Exploration, Canada, who is a Qualified Person for the purposes of SEC Regulation S-K 1300.

 

About Uranium Energy Corp

 

Uranium Energy Corp is the fastest growing supplier of fuel for the green energy transition to a low carbon future. UEC is the largest, diversified North American focused uranium company, advancing the next generation of low-cost, environmentally friendly In-Situ Recovery uranium projects in the United States and high-grade conventional projects in Canada. The Company has one producing ISR production hub and spoke platform in Wyoming and one ISR production-ready ISR hub and spoke platform located in South Texas. These two production platforms are anchored by fully operational central processing plants and served by seven U.S. ISR uranium projects with all their major licenses and permits in place. Additionally, the Company has diversified uranium holdings including: one of the largest physical uranium portfolios of North American warehoused U3O8; a major equity stake in Uranium Royalty Corp., the only royalty company in the sector; and (3) a Western Hemisphere pipeline of resource stage uranium projects. The Company’s operations are managed by professionals with decades of hands-on experience in the key facets of uranium exploration, development and mining.

 

1. Press Release: Uranium Energy Corp Intersects 12.7% eU3O8 over 7.2 metres, 850 m northeast of Roughrider Deposit https://www.sec.gov/Archives/edgar/data/1334933/000143774924027381/ex_716280.htm

Figure 1: Roughrider Location Map (CNW Group/Uranium Energy Corp)

 

Figure 2: Athabasca Project Map (CNW Group/Uranium Energy Corp)

 

Posted September 16, 2024

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News