Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is pleased to announce the following exploration and infill diamond drill results from the Bench Target, at the Company’s flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.
Highlights:
TM26-215 was an exploration hole drilled from west to east from the same pad and directly under TM26-212.
TM26-218 was drilled from east to west across the main Bench-3738-Ellen trend (Reference Table 1.0 and Figure 1.0).
Wes Hanson, President and CEO states, “TM26-218 is the seventh consecutive infill hole to intersect, homogenous, continuous mineralization from the contact of the B-E trend to the end-of-hole. As with all our drilling to date, grades are very consistent, varying from 0.10 to 3.00 g/t Au within the B-E target and rarely exceeding 5.0 g/t Au. From the contact, TM26-218 intersected 298.5 metres averaging 0.409 g/t Au with the highest grade and continuity observed in the last 100 metres of the hole, approximately 300 metres from the current topographic surface (Reference Table 4.0 and Figure 2.0).”
“All seven infill holes completed to date have targeted Inferred resource blocks within the 2026 Mineral Resource Estimate with the objective of converting Inferred resources to the Indicated resource classification. Actual grades are trending higher than modeled grades, suggesting the opportunity to increase the average grade of the resource through continued drilling. We also believe the additional drilling will define continuity of both higher-grade shoots and barren, late, intrusive dikes within the B-E trend that are currently poorly understood due to a lack of drill density.”
Table 1.0 provides the location and orientation of the reported holes. Figure 1.0 is a plan view showing the location of the drill holes reported in this news release.
Table 1.0 – B-E Target – Drill Hole Location Bearing and Dip
| Hole ID | Easting | Northing | Elevation | Bearing | Dip | TD |
| TM26-215 | 300669.0 | 5377168.0 | 502.0 | 40.0 | -70 | 402.0 |
| TM26-218 | 300945.0 | 5377658.0 | 493.0 | 220.0 | -54.4 | 399.0 |
Figure 1.0 Bench Target Diamond Drill Plan – October 5, 2026
TM26-215
TM26-215 was an exploration hole targeting waste rock southwest of the B-E contact. It was collared from the same pad and directly under TM26-212 (Reference Figure 2.0) where moderate to strong albite alteration was observed in the upper 200 metres of TM26-212. TM26-215 was designed to intersect the same albite alteration 100 metres under that observed in TM26-212.
TM26-215 intersected the targeted alteration returning scattered gold grade throughout the hole, often proximal to albite altered intervals. This is identical to the results in TM26-212 and supports the view that sub-vertical continuity persists outside the established B-E contacts.
TM26-215 terminated as planned, prior to the interpreted south contact of the B-E target (Reference Figure 2.0).
As with all the recent drill holes at Tower Mountain, both TM26-212 and TM26-215 can be extended later.
TM26-218
TM26-218 targeted the main B-E target midway between TM26-210 (661.5 metres averaging 0.554 g/t Au) and TM26-214 (409.5 metres averaging 0.307 g/t Au). Collectively, these three holes represent 100 metre step out holes across the middle portion of the B-E target.
TM26-218 intersected the north contact where expected and remained in continuous gold mineralization to the end of the hole, intersecting 298.5 metres averaging 0.409 g/t Au from 100.5 metres downhole (Reference Table 2.0). Approximately ten percent (10%) of this interval assayed less than 0.100 g/t Au (Reference Table 3.0). The observed consistency and lack of extreme outlier values is typical within the B-E target.
Table 2.0 – TM26-215 and TM26-218 Significant Results
| Hole ID | From | To | Length | Grade | True Width |
| (m) | (m) | (m) | (Au g/t) | (m) | |
| TM26-215 | 7.1 | 123.0 | 115.9 | 0.041 | Unknown |
| and | 123.0 | 130.5 | 7.5 | 0.226 | Unknown |
| and | 130.5 | 193.5 | 63.0 | 0.071 | Unknown |
| and | 193.5 | 211.5 | 18.0 | 0.128 | Unknown |
| and | 211.5 | 241.5 | 30.0 | 0.030 | Unknown |
| and | 241.5 | 253.5 | 12.0 | 0.185 | Unknown |
| and | 253.5 | 385.5 | 132.0 | 0.051 | Unknown |
| and | 385.5 | 393.0 | 7.5 | 0.737 | Unknown |
| and | 393.0 | 402.0 | 9.0 | 0.070 | Unknown |
| TM26-218 | 0.7 | 399.0 | 398.3 | 0.331 | Unknown |
| includes | 0.7 | 100.5 | 99.8 | 0.097 | Unknown |
| and | 100.5 | 399.0 | 298.5 | 0.409 | Unknown |
| includes | 100.5 | 132.0 | 31.5 | 0.464 | Unknown |
| and | 132.0 | 139.5 | 7.5 | 0.118 | Unknown |
| and | 139.5 | 187.5 | 48.0 | 0.387 | Unknown |
| and | 187.5 | 223.5 | 36.0 | 0.168 | Unknown |
| and | 223.5 | 258.0 | 34.5 | 0.323 | Unknown |
| and | 258.0 | 399.0 | 141.0 | 0.503 | Unknown |
| includes | 351.0 | 399.0 | 48.0 | 0.622 | Unknown |
| includes | 363.0 | 399.0 | 36.0 | 0.715 | Unknown |
| includes | 372.0 | 399.0 | 27.0 | 0.772 | Unknown |
True Width cannot be estimated at this time due to lack of data
Figure 2.0 – Cross Section TM26-215 AND TM26-218 (Looking SE) 75 metre Influence
Table 3.0 -TM26-218 Complete Results
| From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | ||
| 0.7 | 1.7 | 0.115 | 60.0 | 61.5 | 0.023 | 120.0 | 121.5 | 0.111 | ||
| 1.7 | 3.0 | 0.018 | 61.5 | 63.0 | 0.054 | 121.5 | 123.0 | 0.314 | ||
| 3.0 | 4.5 | 0.054 | 63.0 | 64.5 | 0.039 | 123.0 | 124.5 | 0.205 | ||
| 4.5 | 6.0 | 0.035 | 64.5 | 66.0 | 0.026 | 124.5 | 126.0 | 0.412 | ||
| 6.0 | 7.5 | 0.016 | 66.0 | 67.5 | 0.142 | 126.0 | 127.5 | 0.432 | ||
| 7.5 | 9.0 | 0.156 | 67.5 | 69.0 | 0.070 | 127.5 | 129.0 | 0.665 | ||
| 9.0 | 10.5 | 0.066 | 69.0 | 70.5 | 0.079 | 129.0 | 130.5 | 0.420 | ||
| 10.5 | 12.0 | 0.277 | 70.5 | 72.0 | 0.043 | 130.5 | 132.0 | 0.232 | ||
| 12.0 | 13.5 | 0.558 | 72.0 | 73.5 | 0.079 | 132.0 | 133.5 | 0.148 | ||
| 13.5 | 15.0 | 0.212 | 73.5 | 75.0 | 0.020 | 133.5 | 135.0 | 0.106 | ||
| 15.0 | 16.5 | 0.021 | 75.0 | 76.5 | 0.003 | 135.0 | 136.5 | 0.125 | ||
| 16.5 | 18.0 | 0.015 | 76.5 | 78.0 | 0.007 | 136.5 | 138.0 | 0.123 | ||
| 18.0 | 19.5 | 0.056 | 78.0 | 79.5 | 0.003 | 138.0 | 139.5 | 0.088 | ||
| 19.5 | 21.0 | 0.140 | 79.5 | 81.0 | 0.034 | 139.5 | 141.0 | 0.252 | ||
| 21.0 | 22.5 | 0.177 | 81.0 | 82.5 | 0.044 | 141.0 | 142.5 | 0.160 | ||
| 22.5 | 24.0 | 0.026 | 82.5 | 84.0 | 0.020 | 142.5 | 144.0 | 0.254 | ||
| 24.0 | 25.5 | 0.079 | 84.0 | 85.5 | 0.038 | 144.0 | 145.5 | 0.551 | ||
| 25.5 | 27.0 | 0.039 | 85.5 | 87.0 | 0.271 | 145.5 | 147.0 | 1.190 | ||
| 27.0 | 28.5 | 0.132 | 87.0 | 88.5 | 0.064 | 147.0 | 148.5 | 1.010 | ||
| 28.5 | 30.0 | 0.044 | 88.5 | 90.0 | 0.052 | 148.5 | 150.0 | 0.283 | ||
| 30.0 | 31.5 | 0.503 | 90.0 | 91.5 | 0.296 | 150.0 | 151.5 | 0.667 | ||
| 31.5 | 33.0 | 0.163 | 91.5 | 93.0 | 0.052 | 151.5 | 153.0 | 0.156 | ||
| 33.0 | 34.5 | 0.060 | 93.0 | 94.5 | 0.050 | 153.0 | 154.5 | 0.534 | ||
| 34.5 | 36.0 | 0.043 | 94.5 | 96.0 | 0.047 | 154.5 | 156.0 | 0.225 | ||
| 36.0 | 37.5 | 0.036 | 96.0 | 97.5 | 0.028 | 156.0 | 157.5 | 0.256 | ||
| 37.5 | 39.0 | 0.048 | 97.5 | 99.0 | 0.084 | 157.5 | 159.0 | 0.369 | ||
| 39.0 | 40.5 | 0.109 | 99.0 | 100.5 | 0.098 | 159.0 | 160.5 | 0.546 | ||
| 40.5 | 42.0 | 0.074 | 100.5 | 102.0 | 0.118 | 160.5 | 162.0 | 0.361 | ||
| 42.0 | 43.5 | 0.055 | 102.0 | 103.5 | 0.388 | 162.0 | 163.5 | 0.298 | ||
| 43.5 | 45.0 | 0.153 | 103.5 | 105.0 | 0.191 | 163.5 | 165.0 | 0.215 | ||
| 45.0 | 46.5 | 0.684 | 105.0 | 106.5 | 3.970 | 165.0 | 166.5 | 0.392 | ||
| 46.5 | 48.0 | 0.144 | 106.5 | 108.0 | 0.365 | 166.5 | 168.0 | 0.505 | ||
| 48.0 | 49.5 | 0.047 | 108.0 | 109.5 | 0.269 | 168.0 | 169.5 | 0.440 | ||
| 49.5 | 51.0 | 0.025 | 109.5 | 111.0 | 0.341 | 169.5 | 171.0 | 0.418 | ||
| 51.0 | 52.5 | 0.043 | 111.0 | 112.5 | 0.338 | 171.0 | 172.5 | 0.344 | ||
| 52.5 | 54.0 | 0.042 | 112.5 | 114.0 | 0.061 | 172.5 | 174.0 | 0.156 | ||
| 54.0 | 55.5 | 0.061 | 114.0 | 115.5 | 0.412 | 174.0 | 175.5 | 0.404 | ||
| 55.5 | 57.0 | 0.052 | 115.5 | 117.0 | 0.217 | 175.5 | 177.0 | 0.509 | ||
| 57.0 | 58.5 | 0.083 | 117.0 | 118.5 | 0.072 | 177.0 | 178.5 | 0.342 | ||
| 58.5 | 60.0 | 0.062 | 118.5 | 120.0 | 0.205 | 178.5 | 180.0 | 0.103 |
Table 3.0 -TM26-218 Complete Results (continued)
| From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | ||
| 180.0 | 181.5 | 0.158 | 240.0 | 241.5 | 0.138 | 300.0 | 301.5 | 0.689 | ||
| 181.5 | 183.0 | 0.275 | 241.5 | 243.0 | 0.559 | 301.5 | 303.0 | 0.059 | ||
| 183.0 | 184.5 | 0.484 | 243.0 | 244.5 | 0.512 | 303.0 | 304.5 | 0.110 | ||
| 184.5 | 186.0 | 0.146 | 244.5 | 246.0 | 0.275 | 304.5 | 306.0 | 0.346 | ||
| 186.0 | 187.5 | 0.377 | 246.0 | 247.5 | 0.126 | 306.0 | 307.5 | 2.850 | ||
| 187.5 | 189.0 | 0.152 | 247.5 | 249.0 | 0.127 | 307.5 | 309.0 | 0.300 | ||
| 189.0 | 190.5 | 0.147 | 249.0 | 250.5 | 0.801 | 309.0 | 310.5 | 0.178 | ||
| 190.5 | 192.0 | 0.059 | 250.5 | 252.0 | 0.322 | 310.5 | 312.0 | 0.321 | ||
| 192.0 | 193.5 | 0.134 | 252.0 | 253.5 | 0.057 | 312.0 | 313.5 | 1.580 | ||
| 193.5 | 195.0 | 0.092 | 253.5 | 255.0 | 0.075 | 313.5 | 315.0 | 0.290 | ||
| 195.0 | 196.5 | 0.146 | 255.0 | 256.5 | 0.192 | 315.0 | 316.5 | 0.123 | ||
| 196.5 | 198.0 | 0.222 | 256.5 | 258.0 | 0.167 | 316.5 | 318.0 | 0.007 | ||
| 198.0 | 199.5 | 0.288 | 258.0 | 259.5 | 0.331 | 318.0 | 319.5 | 0.003 | ||
| 199.5 | 201.0 | 0.374 | 259.5 | 261.0 | 0.602 | 319.5 | 321.0 | 0.397 | ||
| 201.0 | 202.5 | 0.678 | 261.0 | 262.5 | 0.268 | 321.0 | 322.5 | 0.297 | ||
| 202.5 | 204.0 | 0.199 | 262.5 | 264.0 | 0.332 | 322.5 | 324.0 | 1.600 | ||
| 204.0 | 205.5 | 0.130 | 264.0 | 265.5 | 0.584 | 324.0 | 325.5 | 1.460 | ||
| 205.5 | 207.0 | 0.165 | 265.5 | 267.0 | 0.174 | 325.5 | 327.0 | 0.256 | ||
| 207.0 | 208.5 | 0.185 | 267.0 | 268.5 | 0.218 | 327.0 | 328.5 | 0.297 | ||
| 208.5 | 210.0 | 0.026 | 268.5 | 270.0 | 1.360 | 328.5 | 330.0 | 0.135 | ||
| 210.0 | 211.5 | 0.114 | 270.0 | 271.5 | 0.548 | 330.0 | 331.5 | 0.180 | ||
| 211.5 | 213.0 | 0.137 | 271.5 | 273.0 | 1.070 | 331.5 | 333.0 | 1.120 | ||
| 213.0 | 214.5 | 0.162 | 273.0 | 274.5 | 1.180 | 333.0 | 334.5 | 0.228 | ||
| 214.5 | 216.0 | 0.140 | 274.5 | 276.0 | 0.262 | 334.5 | 336.0 | 0.171 | ||
| 216.0 | 217.5 | 0.092 | 276.0 | 277.5 | 0.100 | 336.0 | 337.5 | 0.365 | ||
| 217.5 | 219.0 | 0.044 | 277.5 | 279.0 | 0.042 | 337.5 | 339.0 | 0.171 | ||
| 219.0 | 220.5 | 0.081 | 279.0 | 280.5 | 0.169 | 339.0 | 340.5 | 0.310 | ||
| 220.5 | 222.0 | 0.072 | 280.5 | 282.0 | 0.367 | 340.5 | 342.0 | 0.497 | ||
| 222.0 | 223.5 | 0.198 | 282.0 | 283.5 | 0.052 | 342.0 | 343.5 | 0.274 | ||
| 223.5 | 225.0 | 0.341 | 283.5 | 285.0 | 0.133 | 343.5 | 345.0 | 0.759 | ||
| 225.0 | 226.5 | 0.848 | 285.0 | 286.5 | 0.298 | 345.0 | 346.5 | 0.179 | ||
| 226.5 | 228.0 | 0.123 | 286.5 | 288.0 | 0.311 | 346.5 | 348.0 | 0.093 | ||
| 228.0 | 229.5 | 0.274 | 288.0 | 289.5 | 0.222 | 348.0 | 349.5 | 0.064 | ||
| 229.5 | 231.0 | 0.358 | 289.5 | 291.0 | 0.618 | 349.5 | 351.0 | 0.178 | ||
| 231.0 | 232.5 | 0.161 | 291.0 | 292.5 | 0.691 | 351.0 | 352.5 | 0.410 | ||
| 232.5 | 234.0 | 0.042 | 292.5 | 294.0 | 0.184 | 352.5 | 354.0 | 0.362 | ||
| 234.0 | 235.5 | 0.212 | 294.0 | 295.5 | 0.390 | 354.0 | 355.5 | 0.497 | ||
| 235.5 | 237.0 | 0.566 | 295.5 | 297.0 | 0.222 | 355.5 | 357.0 | 0.411 | ||
| 237.0 | 238.5 | 0.855 | 297.0 | 298.5 | 0.254 | 357.0 | 358.5 | 0.305 | ||
| 238.5 | 240.0 | 0.300 | 298.5 | 300.0 | 0.462 | 358.5 | 360.0 | 0.181 |
Table 3.0 -TM26-218 Complete Results (continued)
| From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | From (m) | To (m) | Au g/t | ||
| 360.0 | 361.5 | 0.354 | ||||||||
| 361.5 | 363.0 | 0.216 | ||||||||
| 363.0 | 364.5 | 0.520 | ||||||||
| 364.5 | 366.0 | 0.704 | ||||||||
| 366.0 | 367.5 | 0.334 | ||||||||
| 367.5 | 369.0 | 0.548 | ||||||||
| 369.0 | 370.5 | 0.673 | ||||||||
| 370.5 | 372.0 | 0.496 | ||||||||
| 372.0 | 373.5 | 1.870 | ||||||||
| 373.5 | 375.0 | 0.369 | ||||||||
| 375.0 | 376.5 | 0.283 | ||||||||
| 376.5 | 378.0 | 0.340 | ||||||||
| 378.0 | 379.5 | 1.300 | ||||||||
| 379.5 | 381.0 | 0.795 | ||||||||
| 381.0 | 382.5 | 0.343 | ||||||||
| 382.5 | 384.0 | 0.329 | ||||||||
| 384.0 | 385.5 | 0.327 | ||||||||
| 385.5 | 387.0 | 0.663 | ||||||||
| 387.0 | 388.5 | 1.780 | ||||||||
| 388.5 | 390.0 | 1.500 | ||||||||
| 390.0 | 391.5 | 1.420 | ||||||||
| 391.5 | 393.0 | 0.794 | ||||||||
| 393.0 | 394.5 | 0.243 | ||||||||
| 394.5 | 396.0 | 0.203 | ||||||||
| 396.0 | 397.5 | 0.798 | ||||||||
| 397.5 | 399.0 | 0.542 |
MRE Reconciliation
Reconciliation of drill results to date for the Bench Target relative to the 2026 MRE model suggest an overall grade increase relative to model-predicted grades. Figure 3.0 presents a summary of model-predicted grades compared to actual drilled grade for the seven (7) infill holes completed to date. All seven holes post-date the 2026 MRE model and therefore can be compared directly to model-predicted grades to measure the predictive accuracy of the model.
The results indicate significant variation on a hole-by-hole basis, ranging from a low of -38% (TM26-214) to a high of 100% (TM26-210). This is typical and within expected tolerances. On a weighted average basis, the comparison suggests that actual drilled grades are ~10% higher than the predicted modeled grade.
Similar results are observed for the project to date drilling which includes the exploration holes completed at the UV Target and the holes drilled along the eastern margin of the 2026 MRE optimized pit limit, targeting the large un-estimated portion of the model (Reference Figure 4.0). This data set also suggests that drilled grades are returning higher values than what is currently predicted by the 2026 MRE.
Both analyses exclude mineralization intersected outside the 2026 MRE model limit, specifically, the high-grade results intersected in holes TM26-210 and TM23-137X that extend beyond the base of the 2026 MRE model.
Figure 3.0 – Model Estimated Versus Actual Drilled Grade – Resource Conversion Drilling
Figure 4.0 – Model Estimated Versus Actual Drilled Grade – All Drill Holes 2026
Quality Assurance and Quality Control
Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.
Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream. Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses.
Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider.
AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.
Samples are received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction.
Qualified Person
Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101.
About the Tower Mountain Gold Property
The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex. Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion representing approximately 25% of the TMIC halo.
The MRE has an effective date of January 19, 2026. A Technical Report titled “NI 43-101 Technical Report for the 2026 Mineral Resource Estimate on the Tower Mountain Project, Ontario, Canada.” is available on the Company’s website at www.thundergoldcorp.com and on SEDAR+ (www.sedarplus.ca) under the Company’s Issuer profile.
The Report was prepared by Charley Murahwi, P.Geo., FAusIMM.; William Lewis, P.Geo., Tudorel Ciuculescu, P.Geo., and Richard Gowans, P.Eng., all of Micon International Limited, Toronto, Ontario, Canada. The Report was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and CIM Definition Standards of Mineral Resources and Mineral Reserves.
The MRE is summarized as follows:
Tower Mountain Mineral Resource Estimate – January 19, 2026
| Category | Tonnage (Mt) |
Grade (g/t Au) |
Contained Metal (‘000 oz gold) |
| Indicated | 34.5 | 0.46 | 514 |
| Inferred | 211.1 | 0.45 | 3,053 |
Notes:
The remaining 75% of the TMIC halo demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling.
A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling.
About Thunder Gold Corp.
Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. — an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth.
At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada’s mining industry.
In this presentation, Jeffrey Christian of CPM Group looks at the gold p... READ MORE
In this week’s Weekly Perspective, David Morgan examines a growing con... READ MORE
Michael Allen, CEO & Director of StrikePoint Gold (TSX-V: SKP) (OTCX... READ MORE
SUR-26-58: 118.0 m of 0.081% Ni and 62 ppm Co from 161.0 m, inclu... READ MORE
Mineral Road Discovery Inc. (CSE: ROAD) is pleased to announce th... READ MORE