Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) reports Adjusted EBITDA* of $34.0 million and Adjusted net income* of $4.5 million, or $0.02 per share for the third quarter 2022. Cash flows provided by operations was $12.1 million and Earnings from mining operations before depletion* was $18.6 million.
Stuart McDonald, President and CEO of Taseko, stated, “Strong financial performance in the third quarter was driven by a nearly 40% increase in copper production at Gibraltar. Head grades and copper production have continued to improve as mining advances deeper into the Gibraltar pit. Higher throughput due to the softer ore in the new pit also benefited production with average daily mill throughput of 89,400 tons in the third quarter. This was the highest quarterly mill throughput at Gibraltar since the expansion ten years ago, and we continue to see the potential for further increases. Combined with higher grades, production in the quarter was 28.3 million pounds of copper and 324 thousand pounds of molybdenum. For the fourth quarter, we anticipate approximately a 10% increase in production, and more stable production levels in the coming quarters.”
“Our unit operating costs declined by 22% quarter-over-quarter, as result of increased production and lower site spending. But operating costs are still being impacted by diesel prices which are ~55% higher than in 2021. During the third quarter, we purchased diesel call options which will protect the Company from further diesel price escalation through June 2023,” added Mr. McDonald.
“The average realized copper price for the period was US$3.48 per pound and was supported by our pricing and hedging strategy. We realized proceeds of $18.6 million in the quarter from copper put options, and going forward, we have protected a substantial portion of future sales at a minimum price of US$3.75 per pound through June 2023. Given that we expect Florence construction to be underway next year, we are looking for a market opportunity to extend our put position into the second half of 2023,” continued Mr. McDonald.
“At our Florence Copper Project, we made important steps towards completion of the review process for the Underground Injection Control permit. The US Environmental Protection Agency issued the draft UIC permit in August and the subsequent public comment period and public hearing confirmed overwhelming support for the project from residents of the town of Florence and surrounding areas. We’re confident that all submitted comments will be fully addressed by the EPA, and we look forward to receiving the final UIC permit and getting started on construction of the commercial production facility. Deliveries of major components for the SX-EW plant and other long-lead items continued through the third quarter and should be complete by year-end.” continued Mr. McDonald.
Third Quarter Review
*Non-GAAP performance measure. See end of news release |
HIGHLIGHTS
Operating Data (Gibraltar – 100% basis) | Three months ended September 30, |
Nine months ended September 30, |
||||
2022 | 2021 | Change | 2022 | 2021 | Change | |
Tons mined (millions) | 23.2 | 25.2 | (2.0) | 65.7 | 82.1 | (16.4) |
Tons milled (millions) | 8.2 | 7.4 | 0.8 | 23.0 | 21.9 | 1.1 |
Production (million pounds Cu) | 28.3 | 34.5 | (6.2) | 70.3 | 83.5 | (13.2) |
Sales (million pounds Cu) | 26.7 | 32.4 | (5.7) | 75.8 | 81.1 | (5.3) |
Financial Data | Three months ended September 30, |
Nine months ended September 30, |
||||
(Cdn$ in thousands, except for per share amounts) | 2022 | 2021 | Change | 2022 | 2021 | Change |
Revenues | 89,714 | 132,563 | (42,849) | 290,991 | 330,306 | (39,315) |
Earnings from mining operations before depletion and amortization* | 18,570 | 83,681 | (65,111) | 68,564 | 168,476 | (99,912) |
Cash flows provided by operations | 12,115 | 68,319 | (56,204) | 82,212 | 137,538 | (55,326) |
Adjusted EBITDA* | 34,031 | 76,291 | (42,260) | 73,854 | 147,745 | (73,891) |
Adjusted net income (loss)* | 4,513 | 27,020 | (22,507) | (5,423) | 31,433 | (36,856) |
Per share – basic (“adjusted EPS”)* | 0.02 | 0.10 | (0.08) | (0.02) | 0.11 | (0.13) |
Net income (loss) (GAAP) | (23,517) | 22,485 | (46,002) | (23,696) | 24,710 | (48,406) |
*Non-GAAP performance measure. See end of news release |
REVIEW OF OPERATIONS
Gibraltar mine (75% Owned)
Operating data (100% basis) | Q3 2022 | Q2 2022 | Q1 2022 | Q4 2021 | Q3 2021 | |
Tons mined (millions) | 23.2 | 22.3 | 20.3 | 23.3 | 25.2 | |
Tons milled (millions) | 8.2 | 7.7 | 7.0 | 7.4 | 7.4 | |
Strip ratio | 1.5 | 2.8 | 2.6 | 2.2 | 1.3 | |
Site operating cost per ton milled (Cdn$)* | $11.33 | $11.13 | $11.33 | $9.94 | $8.99 | |
Copper concentrate | ||||||
Head grade (%) | 0.22 | 0.17 | 0.19 | 0.24 | 0.28 | |
Copper recovery (%) | 77.1 | 77.3 | 80.2 | 80.4 | 84.2 | |
Production (million pounds Cu) | 28.3 | 20.7 | 21.4 | 28.8 | 34.5 | |
Sales (million pounds Cu) | 26.7 | 21.7 | 27.4 | 23.8 | 32.4 | |
Inventory (million pounds Cu) | 4.2 | 2.7 | 4.0 | 9.9 | 4.9 | |
Molybdenum concentrate | ||||||
Production (thousand pounds Mo) | 324 | 199 | 236 | 450 | 571 | |
Sales (thousand pounds Mo) | 289 | 210 | 229 | 491 | 502 | |
Per unit data (US$ per pound produced)* | ||||||
Site operating costs* | $2.52 | $3.25 | $2.95 | $2.02 | $1.53 | |
By-product credits* | (0.15) | (0.15) | (0.18) | (0.30) | (0.25) | |
Site operating costs, net of by-product credits* | $2.37 | $3.10 | $2.77 | $1.72 | $1.28 | |
Off-property costs | 0.35 | 0.37 | 0.36 | 0.22 | 0.29 | |
Total operating costs (C1)* | $2.72 | $3.47 | $3.13 | $1.94 | $1.57 |
Third Quarter Review
Gibraltar produced 28.3 million pounds of copper for the quarter, a 37% increase over the second quarter. Head grades improved over the first half of the year to 0.22% but still were impacted by higher than normal mining dilution. Grades are expected to continue improving into the fourth quarter as mining advances deeper into the Gibraltar pit, and a number of initiatives are underway to reduce the above normal mining dilution being experienced in this pit.
Mill throughput averaged 89,400 tons per day exceeding the name plate capacity by 5% and the best quarterly average for Gibraltar. Copper recoveries of 77% were primarily impacted by the lower grade and are also expected to improve as consistency and quality of the Gibraltar pit ore improves at depth.
A total of 23.2 million tons were mined in the third quarter as mining operations were focused in the Gibraltar pit. The strip ratio of 1.5 was lower than prior quarter as stripping activity in Pollyanna was minimal and ore stockpiles increased by 1.0 million tons in the third quarter.
*Non-GAAP performance measure. See end of news release |
REVIEW OF OPERATIONS – CONTINUED
Total site costs* at Gibraltar of $71.0 million (which includes capitalized stripping of $1.1 million) for Taseko’s 75% share were $10.0 million higher than the third quarter of 2021 due to higher diesel prices (56% higher than 2021) and with grinding media and other input costs also increasing.
Molybdenum production was 324 thousand pounds in the third quarter due to lower grades. At an average molybdenum price of US$16.10 per pound, molybdenum generated a by-product credit per pound of copper produced of US$0.15 in the third quarter.
Off-property costs per pound produced* were US$0.35 for the third quarter reflecting higher ocean freight costs (including bunkers) and increased treatment and refining charges (TCRC) compared to the same quarter in the prior year.
Total operating costs per pound produced (C1)* were US$2.72 for the quarter and were US$1.15 per pound higher than the third quarter last year as shown in the bridge graph below:
Of the US$1.15 variance in C1 costs in the third quarter of 2022 compared to the prior year quarter, US$0.46 was due to decreased copper production, US$0.35 was due to less mining and other costs being capitalized, US$0.11 was due to lower molybdenum production, US$0.26 was due to inflation arising from increased prices for diesel, grinding media, explosives and other site costs, US$0.06 was due to higher treatment and refining charges, and partially offset by a weakening Canadian dollar impact of US$0.09.
GIBRALTAR OUTLOOK
Ore from the Gibraltar pit will be the primary source of mill feed for the fourth quarter and for 2023. Copper production in the fourth quarter is expected to improve by approximately 10% over the third quarter and continue at those higher production rates into 2023 as mining progresses deeper into the Gibraltar pit. Stripping activities for the new Connector pit will also commence in 2023. The primary crusher for Mill 1 which overlays the Connector zone is scheduled to be moved to its new location in the third quarter of 2023.
*Non-GAAP performance measure. See end of news release |
GIBRALTAR OUTLOOK – CONTINUED
The Company currently has copper price collar contracts in place that secure a minimum copper price of US$3.75 per pound for a substantial portion of its attributable production until June 30, 2023. The Company has also executed price caps for its share of diesel purchases. Improving production combined with this copper hedge and diesel price protection program should continue to provide the foundation for stable financial performance and operating margins at the Gibraltar mine over the coming quarters.
FLORENCE COPPER
Once in commercial production, Florence Copper is expected to have the lowest energy and greenhouse gas-intensity of any copper producer in North America, and will contribute to reducing the United States’ reliance on foreign producers for a metal considered to be foundational for the transition to a low-carbon economy. It is a low-cost copper project with an annual production capacity of 85 million pounds of copper over a 21-year mine life. With the expected C1* operating cost of US$1.10 per pound, Florence Copper will be in the lowest quartile of the global copper cost curve and will have one of the smallest environmental footprints of any copper mine in the world with carbon emissions, water and energy consumption all dramatically lower than a conventional mine.
The Company has successfully operated a Production Test Facility since 2018 at Florence to demonstrate that the in-situ copper recovery process can produce high quality cathode while operating within permit conditions.
The next phase of Florence Copper will be the construction and operation of the commercial ISCR facility with an estimated capital cost of US$230 million (including reclamation bonding and working capital) based on the Company’s published 2017 NI 43-101 technical report. At a conservative copper price of US$3.00 per pound, Florence Copper is expected to generate an after-tax internal rate of return of 37%, an after-tax net present value of US$680 million at a 7.5% discount rate, and an after-tax payback period of 2.5 years.
In December 2020, the Company received the Aquifer Protection Permit from the Arizona Department of Environmental Quality. During the APP process, Florence Copper received strong support from local community members, business owners and elected officials.
The other required permit is the Underground Injection Control permit from the U.S. Environmental Protection Agency, which is the final permitting step required prior to construction of the commercial ISCR facility. On September 29, 2022, the EPA concluded its public comment period on the draft UIC it issued following a virtual public hearing that was held on September 15, 2022. Public comments submitted to the EPA have demonstrated strong support for the Florence Copper project among local residents, business organizations, community leaders and state-wide organizations. Over 98% of written comments to the EPA were supportive of the project and supplement the unanimous public support voiced at the EPA’s public hearing. Taseko has reviewed all of the submitted comments and is confident they will be fully addressed by the EPA during their review, prior to issuing the final UIC permit.
*Non-GAAP performance measure. See end of news release |
FLORENCE COPPER – CONTINUED
Detailed engineering and design for the commercial production facility was substantially completed in 2021 and procurement activities are well advanced with the Company having awarded and procured the key contract for the major processing equipment associated with the solvent extraction and electrowinning plant. The Company has incurred $79.6 million of costs for Florence in the nine month period ended September 30, 2022 and most of ordered SX/EW plant equipment is expected to be on site by the end of year. Florence Copper also has outstanding purchase commitments of $16.4 million as at September 30, 2022. Deploying this strategic capital and awarding key contracts has assisted with protecting the project execution plan including against supply chain challenges, mitigated inflation risk and should ensure a smooth transition into construction once the final UIC permit is received.
LONG-TERM GROWTH STRATEGY
Taseko’s strategy has been to grow the Company by acquiring and developing a pipeline of complementary projects focused on copper in stable mining jurisdictions. We continue to believe this will generate long-term returns for shareholders. Our other development projects are located in British Columbia.
Yellowhead Copper Project
Yellowhead Mining Inc. has an 817 million tonnes reserve and a 25-year mine life with a pre-tax net present value of $1.3 billion at an 8% discount rate using a US$3.10 per pound copper price based on the Company’s 2020 NI 43-101 technical report. Capital costs of the project are estimated at $1.3 billion over a 2-year construction period. Over the first 5 years of operation, the copper equivalent grade will average 0.35% producing an average of 200 million pounds of copper per year at an average C1* cost, net of by-product credit, of US$1.67 per pound of copper. The Yellowhead copper project contains valuable precious metal by-products with 440,000 ounces of gold and 19 million ounces of silver with a life of mine value of over $1 billion at current prices.
The Company is preparing to advance into the environmental assessment process and is undertaking some additional engineering work in conjunction with ongoing engagement with local communities including First Nations. The Company is also collecting baseline data and modeling which will be used to support the environmental assessment and permitting of the project.
New Prosperity Gold-Copper Project
In December 2019, the Tŝilhqot’in Nation, as represented by the Tŝilhqot’in National Government, and Taseko entered into a confidential dialogue, with the involvement of the Province of British Columbia, to try to obtain a long-term resolution to the conflict regarding Taseko’s proposed gold-copper mine currently known as New Prosperity, acknowledging Taseko’s commercial interests and the Tŝilhqot’in Nation’s opposition to the project.
*Non-GAAP performance measure. See end of news release |
LONG-TERM GROWTH STRATEGY – CONTINUED
The dialogue was supported by the parties’ agreement on December 7, 2019 to a one-year standstill on certain outstanding litigation and regulatory matters that relate to Taseko’s tenures and the area in the vicinity of Teẑtan Biny. The standstill was extended on December 4, 2020, to continue what was a constructive dialogue that had been delayed by the COVID-19 pandemic. The dialogue is not complete but it remains constructive, and in December 2021, the parties agreed to extend the standstill for a further year so that they and the Province of British Columbia can continue to pursue a long-term and mutually acceptable resolution of the conflict.
Aley Niobium Project
Environmental monitoring and product marketing initiatives on the Aley niobium project continue. The converter pilot test is ongoing and is providing additional process data to support the design of the commercial process facilities and will provide final product samples for marketing purposes.
The Company will host a telephone conference call and live webcast on Friday, November 4, 2022 at 11:00 a.m. Eastern Time (8:00 a.m. Pacific) to discuss these results. After opening remarks by management, there will be a question and answer session open to analysts and investors.
The conference call may be accessed by dialing 416-764-8688 in Canada, 888-390-0546 in the United States, 08006522435 in the United Kingdom, or online at tasekomines.com/investors/events. |
NON-GAAP PERFORMANCE MEASURES
This document includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company’s performance. These measures have been derived from the Company’s financial statements and applied on a consistent basis. The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measure.
Total operating costs and site operating costs, net of by-product credits
Total costs of sales include all costs absorbed into inventory, as well as transportation costs and insurance recoverable. Site operating costs are calculated by removing net changes in inventory, depletion and amortization, insurance recoverable, and transportation costs from cost of sales. Site operating costs, net of by-product credits is calculated by subtracting by-product credits from the site operating costs. Site operating costs, net of by-product credits per pound are calculated by dividing the aggregate of the applicable costs by copper pounds produced. Total operating costs per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by the copper pounds produced. By-product credits are calculated based on actual sales of molybdenum (net of treatment costs) and silver during the period divided by the total pounds of copper produced during the period. These measures are calculated on a consistent basis for the periods presented.
(Cdn$ in thousands, unless otherwise indicated) –
75% basis |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2021
Q4 |
2021
Q3 |
Cost of sales | 84,204 | 90,992 | 89,066 | 57,258 | 65,893 |
Less: | |||||
Depletion and amortization | (13,060) | (15,269) | (13,506) | (16,202) | (17,011) |
Net change in inventories of finished goods | 2,042 | (3,653) | (7,577) | 13,497 | 762 |
Net change in inventories of ore stockpiles | 3,050 | (3,463) | (3,009) | 4,804 | 6,291 |
Transportation costs | (6,316) | (4,370) | (5,115) | (4,436) | (5,801) |
Site operating costs | 69,920 | 64,237 | 59,859 | 54,921 | 50,134 |
Less by-product credits: | |||||
Molybdenum, net of treatment costs | (4,122) | (3,023) | (3,831) | (7,755) | (8,574) |
Silver, excluding amortization of deferred revenue | 25 | 36 | 202 | (330) | 300 |
Site operating costs, net of by-product credits | 65,823 | 61,250 | 56,230 | 46,836 | 41,860 |
Total copper produced (thousand pounds) | 21,238 | 15,497 | 16,024 | 21,590 | 25,891 |
Total costs per pound produced | 3.10 | 3.95 | 3.51 | 2.17 | 1.62 |
Average exchange rate for the period (CAD/USD) | 1.31 | 1.28 | 1.27 | 1.26 | 1.26 |
Site operating costs, net of by-product credits
(US$ per pound) |
2.37 | 3.10 | 2.77 | 1.72 | 1.28 |
Site operating costs, net of by-product credits | 65,823 | 61,250 | 56,230 | 46,836 | 41,860 |
Add off-property costs: | |||||
Treatment and refining costs | 3,302 | 2,948 | 2,133 | 1,480 | 3,643 |
Transportation costs | 6,316 | 4,370 | 5,115 | 4,436 | 5,801 |
Total operating costs | 75,441 | 68,568 | 63,478 | 52,752 | 51,304 |
Total operating costs (C1) (US$ per pound) | 2.72 | 3.47 | 3.13 | 1.94 | 1.57 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
Total Site Costs
Total site costs is comprised of the site operating costs charged to cost of sales as well as mining costs capitalized to property, plant and equipment in the period. This measure is intended to capture Taseko’s share of the total site operating costs incurred in the quarter at the Gibraltar mine calculated on a consistent basis for the periods presented.
(Cdn$ in thousands, unless otherwise indicated) –
75% basis |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2021
Q4 |
2021
Q3 |
Site operating costs | 69,920 | 64,237 | 59,859 | 54,921 | 50,134 |
Add: | |||||
Capitalized stripping costs | 1,121 | 11,887 | 15,142 | 12,737 | 10,882 |
Total site costs | 71,041 | 76,124 | 75,001 | 67,658 | 61,016 |
Adjusted net income (loss)
Adjusted net income (loss) removes the effect of the following transactions from net income as reported under IFRS:
Management believes these transactions do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, unrealized gains/losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.
(Cdn$ in thousands, except per share amounts) | 2022
Q3 |
2022
Q2 |
2022
Q1 |
2021
Q4 |
Net income (loss) | (23,517) | (5,274) | 5,095 | 11,762 |
Unrealized foreign exchange (gain) loss | 28,083 | 11,621 | (4,398) | (1,817) |
Unrealized (gain) loss on derivatives | (72) | (30,747) | 7,486 | 4,612 |
Estimated tax effect of adjustments | 19 | 8,302 | (2,021) | (1,245) |
Adjusted net income (loss) | 4,513 | (16,098) | 6,162 | 13,312 |
Adjusted EPS | 0.02 | (0.06) | 0.02 | 0.05 |
(Cdn$ in thousands, except per share amounts) | 2021
Q3 |
2021
Q2 |
2021
Q1 |
2020
Q4 |
Net income (loss) | 22,485 | 13,442 | (11,217) | 5,694 |
Unrealized foreign exchange (gain) loss | 9,511 | (3,764) | 8,798 | (13,595) |
Realized foreign exchange gain on settlement of long-term debt | – | – | (13,000) | – |
Loss on settlement of long-term debt | – | – | 5,798 | – |
Call premium on settlement of long-term debt | – | – | 6,941 | – |
Unrealized (gain) loss on derivatives | (6,817) | 370 | 802 | 586 |
Estimated tax effect of adjustments | 1,841 | (100) | (3,656) | (158) |
Adjusted net income (loss) | 27,020 | 9,948 | (5,534) | (7,473) |
Adjusted EPS | 0.10 | 0.04 | (0.02) | (0.03) |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
Adjusted EBITDA
Adjusted EBITDA is presented as a supplemental measure of the Company’s performance and ability to service debt. Adjusted EBITDA is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present Adjusted EBITDA when reporting their results. Issuers of “high yield” securities also present Adjusted EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet debt service obligations.
Adjusted EBITDA represents net income before interest, income taxes, and depreciation and also eliminates the impact of a number of items that are not considered indicative of ongoing operating performance. Certain items of expense are added and certain items of income are deducted from net income that are not likely to recur or are not indicative of the Company’s underlying operating results for the reporting periods presented or for future operating performance and consist of:
(Cdn$ in thousands) | 2022
Q3 |
2022
Q2 |
2022
Q1 |
2021
Q4 |
Net income (loss) | (23,517) | (5,274) | 5,095 | 11,762 |
Add: | ||||
Depletion and amortization | 13,060 | 15,269 | 13,506 | 16,202 |
Finance expense | 12,481 | 12,236 | 12,155 | 12,072 |
Finance income | (650) | (282) | (166) | (218) |
Income tax expense | 3,500 | 922 | 1,188 | 9,300 |
Unrealized foreign exchange (gain) loss | 28,083 | 11,621 | (4,398) | (1,817) |
Unrealized (gain) loss on derivatives | (72) | (30,747) | 7,486 | 4,612 |
Amortization of share-based compensation expense (recovery) | 1,146 | (2,061) | 3,273 | 1,075 |
Adjusted EBITDA | 34,031 | 1,684 | 38,139 | 52,988 |
(Cdn$ in thousands) | 2021
Q3 |
2021
Q2 |
2021
Q1 |
2020
Q4 |
Net income (loss) | 22,485 | 13,442 | (11,217) | 5,694 |
Add: | ||||
Depletion and amortization | 17,011 | 17,536 | 15,838 | 18,747 |
Finance expense (includes loss on settlement of long-term debt
and call premium) |
11,875 | 11,649 | 23,958 | 10,575 |
Finance income | (201) | (184) | (75) | (47) |
Income tax (recovery) expense | 22,310 | 7,033 | (4,302) | (2,724) |
Unrealized foreign exchange (gain) loss | 9,511 | (3,764) | 8,798 | (13,595) |
Realized foreign exchange gain on settlement of long-term debt | – | – | (13,000) | – |
Unrealized (gain) loss on derivatives | (6,817) | 370 | 802 | 586 |
Amortization of share-based compensation expense | 117 | 1,650 | 2,920 | 1,242 |
Adjusted EBITDA | 76,291 | 47,732 | 23,722 | 20,478 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
Earnings (loss) from mining operations before depletion and amortization
Earnings from mining operations before depletion and amortization is earnings from mining operations with depletion and amortization added back. The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the results of the Company’s operations and financial position and it is meant to provide further information about the financial results to investors.
Three months ended September 30, |
Nine months ended September 30, |
|||
(Cdn$ in thousands) | 2022 | 2021 | 2022 | 2021 |
Earnings from mining operations | 5,510 | 66,670 | 26,729 | 118,091 |
Add: | ||||
Depletion and amortization | 13,060 | 17,011 | 41,835 | 50,385 |
Earnings from mining operations before depletion and amortization | 18,570 | 83,681 | 68,564 | 168,476 |
Site operating costs per ton milled
The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the Company’s site operations on a tons milled basis.
(Cdn$ in thousands, except per ton milled amounts) | 2022
Q3 |
2022
Q2 |
2022
Q1 |
2021
Q4 |
2021
Q3 |
Site operating costs (included in cost of sales) | 69,920 | 64,237 | 59,859 | 54,921 | 50,134 |
Tons milled (thousands) (75% basis) | 6,172 | 5,774 | 5,285 | 5,523 | 5,576 |
Site operating costs per ton milled | $11.33 | $11.13 | $11.33 | $9.94 | $8.99 |
For further information on Taseko, investors should review the Company’s annual Form 40-F filing with the United States Securities and Exchange Commission www.sec.gov and home jurisdiction filings that are available at www.sedar.com.
Search Minerals Inc. (TSX-V: SMY) is pleased to announce that i... READ MORE
New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to re... READ MORE
GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS0) ... READ MORE
Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) reports the Comp... READ MORE
Centerra Gold Inc. (TSX: CG) (NYSE: CGAU) reported its third quar... READ MORE