Bravo Intercepts Further High-Grade Copper-Gold Mineralization at T5 Intercept of 8.75m at 9.48% Cu and 2.1g/t Au

        Copper-Nickel Mineralization Intersected in First Drill Hole at T16 target Intercept of 1.29m at 2.39% Cu, 1.17% Ni   Bravo Mining Corp. (TSX-V: BRVO) (OTCQX: BRVMF), has received assay results from the second drill hole at the …
... READ MORE
June 10, 2024

Power Nickel Commences 8,000 Meters Summer Drill Program

          Power Nickel Inc. (TSX-V: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce it has started the 2024 summer Drill Program with 20 holes targeted and over 8,000 metres of drilling as the Company continues ramping up …
... READ MORE
June 10, 2024

Power Nickel Lion Zone Delivers Hole Assays from 2.60-17.90% CuEq With Hole 59 delivering 1.91 g/t Gold, 73.48 g/t Silver, 9.88% Copper, 6.23 g/t Palladium, 4.56 g/t Platinum, and 0.49% Nickel over 5.59m

          Company continues to expand its Near Surface High-Grade Copper, Platinum, Palladium, Gold and Silver Zone 5km Northeast of its Main Nisk Deposit   Power Nickel Inc. (TSX-V: PNPN) is pleased to announce high-grade multi-elements assay results for …
... READ MORE
June 4, 2024

Canada Nickel Completes Drill Program at Deloro with Resource Estimate Expected in July

          Highlights 2024 drilling increases mineralized footprint by 50% to 1.2 kilometres long by up to 700 metres wide. Deloro is located just 8 kilometres south of Timmins with direct road and powerline access and shallow overburden averaging less …
... READ MORE
June 4, 2024

Power Nickel partners with Karbon-X to Offset 30,000 Meters of Drilling

          Power Nickel Inc. (TSX-V: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce that it has partnered with Karbon-X to offset the carbon footprint associated with the drilling of 30,000 meters. This strategic initiative underscores the Company’s steadfast …
... READ MORE
June 3, 2024

Canada's First Downstream Battery Materials Processing Facility to be Built in Sudbury

            Wyloo has entered into a Memorandum of Understanding with the City of Greater Sudbury to secure a parcel of land to build a downstream battery materials processing facility. The new facility will fill a …
... READ MORE
May 30, 2024

SPC Nickel Reports High-Grade Channel Sampling Results at the West Graham Project, Including 0.94% Ni and 0.44% Cu over 17.0 metres

          SPC Nickel Corp. (TSX-V: SPC) is pleased to report high-grade channel sampling results from a recent trenching program conducted on the Company’s West Graham Project located in the world-class Nickel-Copper mining district of Sudbury, Ontario. …
... READ MORE
May 29, 2024

Bravo Intersects High-Grade IOCG-Style Massive Sulphide Copper-Gold Mineralization in Drill Testing of Luanga EM targets

          Highlights include 11.48m at 14.3% Cu, 3.3g/t Au including 2.9m at 22.9% Cu, 3.6g/t Au at T5 Target Regional exploration has drilled two new areas of sulphide mineralization (T5 and T6 Targets), east of the …
... READ MORE
May 28, 2024

Foran Announces Additional Winter Expansion Drill Results at the Tesla Zone

          Significant Intervals Identified in Step-Out Holes Down-Dip   Tesla Zone Mineralization & Continuity Confirmed Along Strike and at Depth   Electromagnetic Surveys Outline a Further Potential +50m Up-Dip and +200m Down-Dip Continuation of Mineralization   …
... READ MORE
May 28, 2024

Ellis Martin Report - “Power Nickel-The Beginning of a Beautiful Mine? 15.4 Meters 9.5% Copper Equiv”

        In this segment of Ellis Martin’s MoneyTalk Radio we speak with Terry Lynch, CEO of Power Nickel (TSX-V:PNPN) (OTC:PNPNF). Power Nickel’s Lion Discovery assays report 15.4 Metres of over 9.5% Copper Equivalent. Additional multiple high-grade polymetallic …
... READ MORE
May 27, 2024


Copyright 2026 The Prospector News