Mayfair Gold Expansion Drilling Confirms Strong Continuity of Fenn-Gib Gold Mineralization, Including Intercepts of 1.79 g/t Au over 44.6 meters and 2.66 g/t Au over 25.3 meters

          Approx. 96,000m of planned 110,000m drill program completed Resource update based on data up to July 31, 2022, expected before end of October All drill results since mid-2022 are beyond planned October resource update Further …
... READ MORE
October 15, 2022

Mayfair Gold Drills 1.40 g/t Gold over 65.0m from Fenn-Gib Expansion Drill Program

          Reported mineralization outside current Fenn-Gib pit-constrained 2.08M ounce Indicated Resource Resource update on schedule for completion in current quarter Fully funded 30,000m Phase 3 drill program progressing with three drill rigs   Mayfair Gold Corp. …
... READ MORE
July 27, 2022

Mayfair Gold Closes Flow-Through Financing

          Mayfair Gold Corp. (TSX-V: MFG) (OTCQX: MFGCF) today announced the closing of its previously announced private placement financing for proceeds of $7,009,000. The funds will be used to further the Company’s successful exploration program at …
... READ MORE
July 4, 2022

Mayfair Gold Drills 6.53 g/t Gold over 17.5m within 49.0m at 2.88 g/t Gold at Fenn-Gib Footwall Zone

        Footwall mineralization outside current pit-constrained indicated 2.08M ounce resource Steep dipping mineralization from surface to below 500m Footwall Zone defined on strike over 200m Mineralization open in all directions   Mayfair Gold Corp. (TSX-V: MFG) (OTCQB: …
... READ MORE
June 13, 2022

Mayfair Gold Reports 3.04 g/t Gold over 31.5m within 112.1m at 1.21 g/t Gold from Fenn-Gib Expansion Drill Program

          Mineralization outside current pit-constrained indicated 2.08M ounce resource Approx. 76,600m of planned 80,000m drill program completed Resource update on schedule for Q3 2022   Mayfair Gold Corp. (TSX-V: MFG) (OTC: MFGQB) is pleased to announce …
... READ MORE
June 8, 2022

Mayfair Gold Reports 1.31 g/t Gold over 78.3m within 134.2m at 0.93 g/t Gold from Fenn-Gib Expansion Drill Program

          Approx. 71,500m of planned 80,000m drill program completed New mineralization outside current pit-constrained indicated 2.08M ounce resource North Block regional exploration drill program testing Talisman and Horseshoe Zone Targets South Block regional exploration drill program …
... READ MORE
May 2, 2022


Copyright 2026 The Prospector News