Lion Copper and Gold Announces Pre-Feasibility Study Results for Brownfield Yerington Copper Project and Maiden Mineral Reserve

          Base Case $4.30/lb copper, Post-Tax NPV (7%) $694 million and 14.6% IRR with payback at 6.7 years Advancing Clear Path to Near-Term Production of U.S. Refined Copper Cathode   Lion Copper and Gold Corp. (CSE: …
... READ MORE
August 5, 2025

Lion Copper and Gold Announces Drill Results at Yerington Copper Project

          Step Out Drilling At Yerington Pit Extends Mineralization; Drill Hole YM-047A Intercepts 864 Ft of 0.23 % TCu   Lion Copper and Gold Corp. (TSX-V: LEO) (OTCQB: LCGMF) released assay results from its 2024 exploration drilling …
... READ MORE
September 9, 2024


Copyright 2025 The Prospector News