Kiboko Drills 4.2 g/t Au Over 5 m at its Harricana Gold Project

          All assays from Phase 1 exploration program have been reported Maiden pit-constrained mineral resource targeted for Q3-2023     Kiboko Gold Inc. (TSX-V: KIB)  reported results from the remaining 25 holes (4,846 metres) of its …
... READ MORE
July 11, 2023

Kiboko Drills 2.7 g/t Au Over 8.1 m and 8.5 g/t Au Over 2 m at Its Harricana Gold Project Located 55 km North of Val-d’Or, Québec

          Kiboko’s drilling along Marcotte zone continues to verify historical results Assays from 43% of metres drilled in Phase 1 are still to be reported Maiden pit-constrained mineral resource targeted for Q3-2023   Kiboko Gold Inc. …
... READ MORE
June 23, 2023

Kiboko Drills 0.6 g/t Au Over 35 m, 6.1 g/t Over 1 m, and 1.0 g/t Over 5 m, Plus Multiple Occurrences of Visible Gold on Its Harricana Gold Project

          Gold mineralization intercepted in 7 of 8 drillholes Visible gold observed in drill core with assays pending Assays from 61% of metres drilled in Phase 1 (36 holes over 6,853 m) still to be reported …
... READ MORE
June 1, 2023


Copyright 2025 The Prospector News