Integra Announces Oxide Drill Results: 0.52 G/T Gold Equivalent Over 102 M and 0.97 G/T Gold Equivalent Over 24 M From Delamar Stockpile Drill Program, 1.38 G/T Gold Equivalent Over 67 M in Metallurgical Drilling
Drill results from DeLamar stockpile drill program include: NDM-22-037: 0.25 grams per tonne gold and 21.38 g/t silver (0.52 g/t gold equivalent) over 102.11 m NDM-22-040: 0.34 g/t Au and 18.19 g/t Ag (0.58 g/t …
...
READ MOREJanuary 10, 2023
Integra Announces Oxide Drill Results From DeLamar Stockpile Drill Program: 0.51 g/t Gold Equivalent Over 84 m and 0.49 g/t Gold Equivalent Over 70 m, Demonstrating Proof of Concept for Mineralized Stockpiles
Drill results from DeLamar stockpile drill program include: NDM22-032: 0.31 grams per tonne gold and 16.12 g/t silver (0.51 g/t gold equivalent) over 83.82 meters NDM22-122: 0.27 g/t Au and 17.25 g/t Ag (0.49 g/t …
...
READ MOREDecember 7, 2022
Integra Announces Drill Results From DeLamar Project: 108.8 M Grading 0.79 G/T Gold Equivalent at Florida Mountain and 48.8 M Grading 0.73 G/T Gold Equivalent at BlackSheep
Drill results from Florida Mountain include: FME-21-138 – 0.59 grams per tonne gold and 15.01 g/t silver (0.79 g/t gold equivalent) over 108.81 meters Including 3.16 g/t Au and 131.00 g/t Ag (4.85 g/t AuEq) …
...
READ MOREOctober 20, 2022
Integra Closes Oversubscribed Overnight Marketed Offering for US$11 Million and Will Draw the US$10 Million Initial Advance on the US$20 Million Convertible Loan Facility With Beedie Capital
Integra Resources Corp. (TSX-V: ITR) (NYSE American: ITRG) is pleased to announce that it has closed its previously announced overnight marketed public offering. Pursuant to the Offering, Integra issued 16,666,667 common shares of the Company, …
...
READ MOREAugust 4, 2022
Integra Intersects 2.26 G/T AuEq Over 102 M at Sullivan Gulch, Including 1.30 G/T Au and 2,718 G/T Ag (36.28 G/T AuEq) Over 1.53 M
Drill results from Sullivan Gulch (located on the eastern portion of the DeLamar Deposit) and Sommercamp-Regan at DeLamar include: IDM-22-204 – Sullivan Gulch 0.57 grams per tonne gold and 131.29 g/t silver (2.26 g/t gold …
...
READ MOREJuly 21, 2022
Integra Reports Thickest Gold-Silver Zone to Date at Sullivan Gulch: 1.66 g/t AuEq Over 397 m, Expands Continuity of New High-Grade Structure at Sullivan Gulch With 9.00 g/t Au and 491 g/t Ag (15.32 g/t AuEq) Over 1.52 m
Drill results from Sullivan Gulch (located on the eastern portion of the DeLamar Deposit) include: IDE-22-228 – Intercepts from new Sullivan Gulch, high-grade zone 0.76 grams per tonne gold and 69.50 g/t silver (1.66 g/t …
...
READ MOREJune 13, 2022
Integra Intersects Record Silver Grade at DeLamar: 9.85 g/t AuEq Over 26.97 m, Including 80.40 g/t Au and 14,054 g/t Ag (261.28 g/t AuEq) Over 0.40 m in Potential New, High-Grade Structural Zone at Sullivan Gulch
Drill results from Sullivan Gulch (located on the eastern portion of the DeLamar Deposit) include: IDE-22-228 4.10 grams per tonne gold and 446.92 g/t silver (9.85 g/t gold equivalent) over 26.97 meters Including 13.47 g/t …
...
READ MOREMay 25, 2022
Integra Intersects 3.95 g/t AuEq Over 77.7 M in Extension Drilling at War Eagle
2021 Drill results from War Eagle target (located approximately 3 km southeast of the Florida Mountain Deposit) include: IWE-21-023 3.85 g/t Au and 7.74 g/t Ag (3.95 g/t AuEq) over 77.72 m Including 97.48 g/t …
...
READ MOREMay 5, 2022
Integra Intersects Highest-Grade Intercepts to Date at DeLamar Deposit: 10.75 g/t AuEq Over 9.14 m, Including 104.28 g/t Au and 4,818 g/t Ag (166.28 g/t AuEq) over 0.46 m and 8.40 g/t AuEq Over 7.02 m at Sullivan Gulch
Integra Resources Corp. (TSX-V: ITR) (NYSE American: ITRG) – Drill results from Sullivan Gulch located at the DeLamar Deposit include: IDE-22-226 0.54 grams per tonne gold and 66.42 g/t silver (1.40 g/t gold equivalent) over …
...
READ MOREMarch 17, 2022
Integra Completes Pre-Feasibility Study for Delamar Project With Average Annual Production of 163,000 Oz Au Eq for the First 8 Yrs, and Demonstrates Project Optionality With Phased Development Approach
Key Pre-feasibility Study Highlights: The Heap Leach and Mill PFS shows construction in two stages. The combined Stage 1 and 2 contemplates a 35,000 metric tonnes per day Heap Leach in Stage 1 that will …
...
READ MOREFebruary 10, 2022
RELATED POSTS
Copyright 2025 The Prospector News