
Abitibi Metals Drills 44.5 Metres At 2.82% CuEq in Central Drilling At The B26 Polymetallic Deposit
Highlights: The Company has received results from drillholes 1274-24-301-305 and 339-341 highlighted by the following intervals: #339 – 2.82% CuEq over 44.5 metres beginning at 146 metres depth #340 – 3.35 % CuEq over 20.75 metres …
...
READ MOREMay 2, 2024
RELATED POSTS
Copyright 2025 The Prospector News