
Abitibi Metals Drills 44.5 Metres At 2.82% CuEq in Central Drilling At The B26 Polymetallic Deposit
          Highlights: The Company has received results from drillholes 1274-24-301-305 and 339-341 highlighted by the following intervals: #339 – 2.82% CuEq over 44.5 metres beginning at 146 metres depth #340 – 3.35 % CuEq over 20.75 metres …
... 
                         READ MOREMay 2, 2024
RELATED POSTS
				
			
      
  
  
  
  
          
          Copyright 2025 The Prospector News
          
        
        
                                    
                
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
            
