
Doubleview Gold Corp. Reports Updated Mineral Resource Estimate as of February 25, 2026 Including a Copper Equivalent Mineral Resource: 609 (Mt) of Measured and Indicated Resources at 0.43% CuEq containing CuEq 5.82 Billion lbs. 503 (Mt) of Inferred Resources at 0.41% CuEq containing CuEq 4.57 Billion lbs
Doubleview Gold Corp (TSX-V: DBG) (OTCQB: DBLVF) (FSE: 1D4) is pleased to announce the update of the Mineral Resource estimate of its 100%-owned polymetallic Hat porphyry project, in northwestern British Columbia. With major content of copper, gold, cobalt and …
...
READ MOREFebruary 25, 2026

Goliath Reports Numerous High-Grade Intercepts Including 24.16 g/t AuEq Over 7.00 Meters, Grade Values Increased By 19.6 % In 56 Gold Equivalent Drill Results, And Expands Vast Stacked Vein System At Surebet Discovery, Golden Triangle, B.C.
Accounting for Silver, Copper, Lead and Zinc within these 56 drill hole results, Goliath reports an average 19.6 % increase in overall grade values from these previously announced Gold only assays, with numerous high-grade intercepts …
...
READ MOREFebruary 24, 2026

Blue Lagoon Resources Completes Second Sale of $1.4 Million of Dome Mountain Mineralized Material – Milling Now Underway
Blue Lagoon Resources Inc. (CSE: BLLG) (OTCQB: BLAGF) (FSE: 7BL) is pleased to announce that it has received a second advance payment of ~ CAD $1.4 million from its milling partner, Nicola Mining, for 1000 …
...
READ MOREFebruary 23, 2026

NorthWest Reports Significant Ore Sorting Results at Kwanika
NorthWest Copper Corp. (TSX-V: NWST) is pleased to announce positive results from follow-up sorting test work at its Kwanika project. The program evaluated the use of sorting technology to reject barren material ahead of a …
...
READ MOREFebruary 23, 2026

Hudbay Delivers Record Fourth Quarter and Full Year 2025 Results; Achieves 2025 Consolidated Copper and Gold Production and Cost Guidance
Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM) released its fourth quarter and full year 2025 financial results and announced 2026 annual production and cost guidance. All amounts are in U.S. dollars, unless otherwise noted. “2025 …
...
READ MOREFebruary 20, 2026

Centerra Gold Announces 2025 Year-End Mineral Reserves and Resources and Provides Exploration Update; Gold and Copper Reserves Increased 58% and 49%
Centerra Gold Inc. (TSX: CG) (NYSE: CGAU) announces its 2025 year-end estimates for mineral reserves and mineral resources. Proven and probable gold mineral reserves increased 58% year-over-year to 5.5 million ounces, and proven and probable …
...
READ MOREFebruary 20, 2026

Centerra Gold Reports Fourth Quarter and Full Year 2025 Results; Delivered Robust Annual Production and Beat Cost Guidance; 2026 Outlook Remains Strong as Centerra Executes its Self-Funded Growth Strategy
Centerra Gold Inc. (TSX: CG) (NYSE: CGAU) reported its fourth quarter and full year 2025 operating and financial results and issued 2026 guidance. President and CEO, Paul Tomory, commented, “In the fourth quarter, we …
...
READ MOREFebruary 20, 2026

Omineca Provides Operational Update of Placer Gold Recovery at Wingdam
Omineca Mining and Metals Ltd. (TSX-V: OMM) is pleased to provide an operational update from the Wingdam underground paleoplacer project located in the Cariboo Mining District of south central British Columbia. The Company’s mining contractor, …
...
READ MOREFebruary 19, 2026

Goliath Reports Numerous High-Grade Intercepts Up To 10.83 g/t AuEq Over 22.82 Meters, Grade Values Increased By 13.2% In 54 Gold Equivalent Drill Results, Assays Pending On A Further 56 AuEq Holes Drilled In 2025, Surebet Discovery, Golden Triangle, B.C.
Accounting for Silver, Copper, Lead and Zinc within these 54 drill hole results, Goliath reports an average 13.2% increase in overall grade values from the previously announced Gold only assays, with numerous high-grade intercepts up …
...
READ MOREFebruary 19, 2026

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 596.40 g/t Gold Over 2.0 Meters from 6.1 Meters Downhole, Including 2,293.56 g/t Gold Over 0.5 Meters from 6.6 Meters Downhole
HIGHLIGHTS 11,025 m of infill drilling completed (5,043 m new results) on 10-m drill spacing in 116 drill holes from August 2025 representing ~80% of the total planned ~13 km infill program Highlight intercepts include: …
...
READ MOREFebruary 16, 2026
RELATED POSTS
Copyright 2026 The Prospector News

