Eastport Intersects 47.5m at 0.64% TREO From 20m Including 7.5m at 2.52% TREO Within 330m at 0.21% TREO at Semarule

          Semarule represents a large, at surface rare earth-bearing multi-layered syenite intrusion, ~40km from the capital of Botswana, Gaborone SEM005 tested the western side of the Semarule syenite, a target that is exposed over approximately 5km …
... READ MORE
September 14, 2026

TRX Gold Delivers Record Q4 2026; Achieves Top End of Production Guidance

          TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) is pleased to announce preliminary results for Q4 20261. Record Fourth Quarter Results Lead to Achieving Top End of Fiscal 2026 Production Guidance: In Q4 2026, the …
... READ MORE
September 14, 2026

Aya Gold & Silver Announces Updated PEA for Boumadine: After-Tax NPV Doubles to $3.5B with 93% IRR

          Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) is pleased to announce the results of its updated Preliminary Economic Assessment for the Boumadine Project located in the Kingdom of Morocco. The 2026 PEA was …
... READ MORE
September 9, 2026

Koryx Copper Announces Further Drill Results at the Haib Copper Project in Southern Namibia

          Highlights  Assay results reported for 15 drill holes comprising 6,825m of infill and expansion drilling. Consistent, wide intercepts incl. 318m @ 0.49% CuEq (162 – 480m) and 220m @ 0.40% CuEq (32-252m) with higher grades …
... READ MORE
September 9, 2026

Founders Metals Hits 27.0 m of 20.38 g/t Gold in First Step-Out Drilling on New West Zone at Antino

          Founders Metals Inc. (TSX-V: FDR) (OTCQX: FDMIF) (FSE: 9DL0) announces drill results from the Upper Antino-West Zone at its Antino Gold Project in southeastern Suriname (Figure 1). Hole FR251 returned 27.0 metres of 20.38 grams …
... READ MORE
September 9, 2026

Kobo Resources Extends Gold Mineralisation to the North at Kossou with Multiple High-Grade Drill Intercepts

          Drilling at the northern end of the Road Cut Zone continues to extend the Main Road Cut Shear, with mineralisation remaining open to the north and at depth KDD0179 returned multiple high-grade intervals, including 5.0 …
... READ MORE
September 3, 2026

Lake Victoria Gold Intersects 28.71 g/t Au over 2.75 m and 12.20 g/t Au over 4.50 m in Shallow Area C Drilling at Imwelo

          Targeted whole-core metallurgical program on weathered ore advances clay-handling and final process-design decisions for the planned initial mining area   Lake Victoria Gold Ltd. (TSX-V: LVG) (OTCQB: LVGLF) (FSE: E1K) is pleased to report high-grade, …
... READ MORE
August 27, 2026

Koryx Copper Announces Further Drill Results at the Haib Copper Project in Southern Namibia

          Highlights  Assay results reported for 19 drill holes comprising over 8,586m of infill drilling. Consistent, wide intercepts up to 969m in width, including 236m @ 0.57% CuEq. High-grade mineralisation from surface in HM177, including 30m …
... READ MORE
August 26, 2026

Avanti Gold Grows Footprint of Akyanga Deposit with Multiple High-Grade Intersects Including 3.85 m at 12.30 g/t Au and 3.55 m at 7.73 g/t Au

          HIGHLIGHTS Ongoing 2026 Phase 1 drilling at the Akyanga Deposit continues to intersect multiple zones of gold mineralization within and below the US$1,500/oz pit shell used to constrain the current Mineral Resource Estimate. MSDD0147 returned …
... READ MORE
August 26, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

          New surface targets identified   North Arrow Minerals Inc. (TSX-V: NAR) (OTCQB: NHAWF) (FSE: 9TB) reports results from 97 surface samples collected in Q2 2026 at the Kraaipan Gold Project in southern Botswana, extending the …
... READ MORE
August 24, 2026


Copyright 2026 The Prospector News