ABITIBI METALS DRILLS 10.6 METRES AT 11.4% CU EQ WITHIN 34 METRES AT 4.1% CU EQ NEAR SURFACE AT THE B26 DEPOSIT*

        First Two Drill Holes in Ongoing 30K Metre Campaign Among Highest-Grade in Project History, Support Open Pit Potential at B26 Polymetallic Deposit, Quebec   Highlights: Drillhole 1274-24-293 intersected 4.0% CuEq over 22.7 metres, including 6.3% CuEq over 10.6 metres beginning …
... READ MORE
February 29, 2024


Copyright 2025 The Prospector News