
Abitibi Metals Concludes Phase II Drill Program with Strong Results: 8.08% CuEq Over 2.9 Metres Within 1.94% CuEq Over 29 Metres at B26 Deposit
          Highlights: Expansional results from key target areas at the B26 Deposit:  Hole 1274-24-359 – Over 32 metres of more than 2% CuEq across multiple intervals including: 2.0% CuEq over 16.5 metres, beginning at 326m depth, 3.3% CuEq over …
... 
                         READ MOREMarch 19, 2025
RELATED POSTS
				
			
      
  
  
  
  
          
          Copyright 2025 The Prospector News
          
        
         
                                    
                 
                        
                     
                        
                     
                        
                     
                        
                     
                        
                     
                        
                     
            
